Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD06-01830
StatusFinaled
Name MARK RIVER'S OFFICE
Site Address 404 S 8TH ST Unit: 250
Project Name8TH STREET MARKETPLACE
Customer Number 
ePlanReviewNo
Description
(RCE-8702 COLLIER'S INTERNATIONAL) (MARK RIVER'S OFFICE - 8TH STREET MARKETPLACE - 2ND STORY) This building is fire sprinklered to substitute for 1-hr construction. To remodel a 2,112 square foot tenant space located on the 2nd story for office use. Work is to include interior nonbearing walls, interior windows, interior doors, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/22/2008  
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice5/6/20085/6/20088/11/2008 DONE
DetailsDave Hannah
Print Occupancy Form  5/13/2008 DONE
BLD-Final5/5/20085/6/20085/6/2008PPASS
DetailsDave Hannah
rob Phone #: ###-#### ok for perm occ
DOC - Permit Finaled5/6/20085/6/20085/6/2008PPASS
DetailsDave Hannah
FIRE-Final Inspection5/5/20085/6/20085/6/2008APASS
DetailsForrest France
Corrections verified for completion, fire life safety passed, NOTE: No signature card available on site at the time of inspection.
BLD-Final1/25/20081/28/20081/28/2008AFAIL
DetailsDave Hannah
rob Note: please call 1/2 hr prior to inspections Phone #: ###-#### needs fire sign offs first
FIRE-Final Inspection1/25/20081/25/20081/25/2008PFAIL
DetailsForrest France
Missing suite address numbers, manual flush bolts at the main entry/exit inactive door leaf are not permitted, need provision to test emergency lighting for functionality.
BLD-Framing/Rough-in11/19/200711/20/200711/20/2007APASS
DetailsTom Arcoraci
rob Phone #: ###-####
BLD-Framing/Rough-in8/17/20078/20/20078/21/2007ANR
DetailsDave Hannah
Rich; reinspect; Phone #: ###-#### Internet Inspection Request from: Hattie James needs plans on site
BLD-Framing/Rough-in8/16/20078/17/20078/20/2007PFAIL
DetailsDave Hannah
Rich; Phone #: ###-#### Internet Inspection Request from: Hattie James need city set of plans
BLD-Aging Inspection10/31/200610/31/200611/1/2006 PASS
DetailsDave Hannah
Override - Parcel Holds  8/1/2006  
Issue PAID IN FULL permit  8/1/2006 DONE
Plan assigned to (CJW)7/3/2006 7/26/2006 PASS
7/26/2006 08:02:26 CJW - activity updated through activity BLDA022 from case BLD06-01830.
Routing - PLAN CHECK7/17/2006 7/26/2006 PASS
The drawings were approved after the resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  7/26/2006 DONE
Print Occupancy Form  7/26/2006 DONE
Telephone call  7/26/2006 DONE
tlk to jeff likes ###-#### that permit and fees are ready to be picked up but needs GC and RCE #
Override - Parcel Holds  7/26/2006  
Permit Ready to Issue  7/26/2006  
Plan resubmittals received  7/25/2006  
Received 1 copy of cover transmital, 1 copy of memo from BRS, 2 copies of A1.1, & A2.1 and taken to Carl Westfall
1st review completed  7/17/2006 FAIL
Failed Plan Check.
Routing - FIRE7/12/2006 7/17/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK7/5/2006 7/12/2006 FAIL
The IBC plan review was started on July 11, 2006 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS7/3/2006 7/5/2006 PASS
Routing - Addressing7/3/2006 7/3/2006 PASS
Override - Parcel Holds  6/26/2006  
Plans ACCEPTED BY PLAN TECH  6/26/2006  
Override - Parcel Holds  6/26/2006  
Recd Pcfee & Taken To Pln CK  6/23/2006  
Application received  6/23/2006  
Third Notice BLD9/22/20089/22/2008   
Second Notice has not been responded to.