Telephone call | | | 4/4/2007 | | DONE |
|
|
|
call to pete rutherford, left msg on ans mach. to call back re difference on mec fv's
|
Telephone call | | | 3/27/2007 | | DONE |
|
|
|
left message for sonja w/ debest to call re fv on this job.
|
Second Notice BLD | 3/21/2007 | 3/21/2007 | 3/26/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/28/2007 | 3/21/2007 | | DONE |
|
|
|
|
BLD-Final | 2/28/2007 | 2/28/2007 | 2/28/2007 | P | PASS |
Dave Hannah
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for perm occ
|
BLD-Final | 2/27/2007 | 2/28/2007 | 2/28/2007 | A | CANC |
Dave Hannah
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
Permanent Occupancy | | 2/28/2007 | 2/28/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 2/28/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11455 issued 2-28-07 to Meuleman Mollerup, LLP in the BODO Bldg. #7.
|
FIRE-Final Inspection | 1/10/2007 | 1/11/2007 | 1/11/2007 | A | PASS |
Forrest France
|
|
|
Required corrections have been verified for completion, fire life safety final inspection passed.
|
BLD-Final | 1/4/2007 | 1/5/2007 | 1/8/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/4/2007 at 10:29:00 AM. Contact: ###-####. ok for temp occ needs to fix ada shower and hl oles in floor
|
FIRE-Final Inspection | 1/4/2007 | 1/5/2007 | 1/5/2007 | A | PART |
Forrest France
|
|
|
Agreed in conjunction with the structural inspector to allow temporary occupancy pending the replacement of four light fixtures with defective emergency ballasts. Corrections are to be made and verified for completion early next week as discussed.
|
FIRE-Final Inspection | 1/4/2007 | 1/5/2007 | 1/5/2007 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/4/2007 at 10:28:20 AM. Contact: ###-####. wrong inspector
|
Temporary occupancy | | | 1/5/2007 | | DONE |
|
|
|
Temp. Occ. Cert. # 5508 issued 1-5-08 to Meuleman Mollerup, LLP.
|
BLD-Framing/Rough-in | 12/22/2006 | 12/22/2006 | 12/22/2006 | P | PART |
Jim Storey
|
|
|
rich judy///ceiling grid inspection please; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt floor firestopping not done/ pvc plm in return air plenm/needs spreader bars.hole in stair encloser. ok to start but leave access for reinsp.
|
BLD-Framing/Rough-in | 11/29/2006 | 11/30/2006 | 11/30/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/29/2006 at 5:57:22 PM. Contact: ###-####.ok to cover restroom plumbing wall
|
BLD-Framing/Rough-in | 11/28/2006 | 11/29/2006 | 11/29/2006 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/28/2006 at 3:50:35 PM. Contact: ###-####.ok to cover all but restroom plumbing wall
|
BLD-Energy code compliance | 11/15/2006 | 11/16/2006 | 11/16/2006 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/15/2006 at 4:47:01 PM. Contact: ###-####.
|
BLD-Energy code compliance | 11/14/2006 | 11/16/2006 | 11/15/2006 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/14/2006 at 4:15:51 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Nov 15 2006 4:51PM.
|
FIRE-Conference | 11/14/2006 | 11/15/2006 | 11/15/2006 | P | PASS |
Troy Cobbley
|
|
|
The contractor had a question about a pipe penatration through a rated wall
|
BLD-Framing/Rough-in | 11/14/2006 | 11/15/2006 | 11/15/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/14/2006 at 4:13:44 PM. Contact: ###-####. ok to insulate ext walls
|
Issue PAID IN FULL permit | | | 9/11/2006 | | |
|
|
|
|
Print Occupancy Form | | | 9/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/8/2006 | | |
|
|
|
lft vm with rich ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 9/8/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2006 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 7/3/2006 | | 9/7/2006 | | PASS |
|
|
|
9/7/2006 15:45:49 CJW - activity updated through activity BLDA022 from case BLD06-01831.
|
Routing - PLAN CHECK | 8/12/2006 | | 9/7/2006 | | PASS |
|
|
|
(8-12-06) On hold at Carl J. Westfall's desk until issues are resolved. (9-7-06) Approved after the 2nd resubmittal review.
|
Plan resubmittals received | | | 9/1/2006 | | |
|
|
|
Received transmittal sheet, 1pg. fax transmittal, 1pg. memo from BRS Arch., 2 copies of pages M-1 & M-3; taken to Carl Westfall
|
Telephone call | | | 8/24/2006 | | DONE |
|
|
|
Talked to a representative of the Mechanical Engineer and discussed the concern about economizers and outside air.
|
Telephone call | | | 8/12/2006 | | DONE |
|
|
|
Called to talk to the Mechanical Engineer (Richard Kartchner). He was not available. Left a message. Some issues need to be discussed (ventilation and economizers). Waiting for a return call.
|
Routing - PLAN CHECK | 7/18/2006 | | 8/12/2006 | | FAIL |
|
|
|
Mechanical issues not fully resolved. Revised plan review report sent to the Architect's rep. (Jeff Likes).
|
Plan resubmittals received | | | 8/10/2006 | | DONE |
|
|
|
Received 1 transmittal,1 memo,1 transmittal letter,3 structural calcs & 2 copys of sheets G1.1,A1.1,A4.2,I-2.01,M-1,M-2M-3E1.1 taken to Carl W.
|
1st review completed | | | 7/18/2006 | | FAIL |
|
|
|
Failed plan check.
|
Routing - FIRE | 7/13/2006 | | 7/18/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 7/5/2006 | | 7/13/2006 | | FAIL |
|
|
|
The IBC plan review was started on July 13, 2006 and was finished the same day. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 7/3/2006 | | 7/5/2006 | | PASS |
|
|
|
|
Routing - Addressing | 7/3/2006 | | 7/3/2006 | | PASS |
|
|
|
|
BLD-Conference | 6/27/2006 | 6/27/2006 | 6/28/2006 | P | DONE |
Forrest France
|
|
|
Phone conversation with contractor regarding duct smoke detection requirements for HVAC shutdown in a proposed common plenum.
|
BLD-Conference | 6/27/2006 | 6/27/2006 | 6/27/2006 | A | PASS |
Dixie Fellows
|
|
|
per dixie..referred richard kartchner to sam rogers regarding outside fresh air not being ducted to r/a on all units..they are using the ceiling as a plenum and the units will all have duct detectors in the r/a's.
|
Plans ACCEPTED BY PLAN TECH | | | 6/27/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/26/2006 | | |
|
|
|
|
Application received | | | 6/23/2006 | | |
|
|
|
|