Permit Information
Permit NumberBLD06-01831
StatusFinaled
Name COLLIER'S INTERNATIONAL
Site Address 755 W FRONT ST Unit: 200
Project NameMEULEMAN MOLLERUP LLP BODO 7
Customer Number 
ePlanReviewNo
Description
(RCE-8702 - COLLIERS INTERNATIONAL) (MEULEMAN MOLLERUP LLP - BODO BLDG #7 - 2ND STORY) This building is fire sprinklered for fire area and to allow the multitheater complex. To construct a 9,983 square foot office tenant space on the 2nd story of BoDo Building #7 (Northeast corner). Work is to include 2 restrooms accessible to the disabled, a shower room accessible to the disabled, interior nonbearing walls, interior doors, interior windows, suspended acoustical ceilings, suspended gypsum board ceilings, millwork, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  4/4/2007 DONE
call to pete rutherford, left msg on ans mach. to call back re difference on mec fv's
Telephone call  3/27/2007 DONE
left message for sonja w/ debest to call re fv on this job.
Second Notice BLD3/21/20073/21/20073/26/2007 DONE
First Notice has not been responded to.
First Notice 2/28/20073/21/2007 DONE
BLD-Final2/28/20072/28/20072/28/2007PPASS
DetailsDave Hannah
Rob; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for perm occ
BLD-Final2/27/20072/28/20072/28/2007ACANC
DetailsDave Hannah
Rob; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
Permanent Occupancy 2/28/20072/28/2007 DONE
Details
Permanent occupancy  2/28/2007 DONE
Perm. Occ. Cert. # 11455 issued 2-28-07 to Meuleman Mollerup, LLP in the BODO Bldg. #7.
FIRE-Final Inspection1/10/20071/11/20071/11/2007APASS
DetailsForrest France
Required corrections have been verified for completion, fire life safety final inspection passed.
BLD-Final1/4/20071/5/20071/8/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/4/2007 at 10:29:00 AM. Contact: ###-####. ok for temp occ needs to fix ada shower and hl
oles in floor
FIRE-Final Inspection1/4/20071/5/20071/5/2007APART
DetailsForrest France
Agreed in conjunction with the structural inspector to allow temporary occupancy pending the replacement of four light fixtures with defective emergency ballasts. Corrections are to be made and verified for completion early next week as discussed.
FIRE-Final Inspection1/4/20071/5/20071/5/2007ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/4/2007 at 10:28:20 AM. Contact: ###-####. wrong inspector
Temporary occupancy  1/5/2007 DONE
Temp. Occ. Cert. # 5508 issued 1-5-08 to Meuleman Mollerup, LLP.
BLD-Framing/Rough-in12/22/200612/22/200612/22/2006PPART
DetailsJim Storey
rich judy///ceiling grid inspection please; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt floor firestopping not done/ pvc plm in return air plenm/needs spreader bars.hole in stair encloser. ok to start but leave access for reinsp.
BLD-Framing/Rough-in11/29/200611/30/200611/30/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/29/2006 at 5:57:22 PM. Contact: ###-####.ok to cover restroom plumbing wall
BLD-Framing/Rough-in11/28/200611/29/200611/29/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/28/2006 at 3:50:35 PM. Contact: ###-####.ok to cover all but restroom plumbing wall
BLD-Energy code compliance11/15/200611/16/200611/16/2006PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/15/2006 at 4:47:01 PM. Contact: ###-####.
BLD-Energy code compliance11/14/200611/16/200611/15/2006ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/14/2006 at 4:15:51 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Nov 15 2006 4:51PM.
FIRE-Conference11/14/200611/15/200611/15/2006PPASS
DetailsTroy Cobbley
The contractor had a question about a pipe penatration through a rated wall
BLD-Framing/Rough-in11/14/200611/15/200611/15/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/14/2006 at 4:13:44 PM. Contact: ###-####. ok to insulate ext walls
Issue PAID IN FULL permit  9/11/2006  
Print Occupancy Form  9/8/2006 DONE
Telephone call  9/8/2006  
lft vm with rich ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  9/8/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/7/2006 DONE
Plan assigned to (CJW)7/3/2006 9/7/2006 PASS
9/7/2006 15:45:49 CJW - activity updated through activity BLDA022 from case BLD06-01831.
Routing - PLAN CHECK8/12/2006 9/7/2006 PASS
(8-12-06) On hold at Carl J. Westfall's desk until issues are resolved. (9-7-06) Approved after the 2nd resubmittal review.
Plan resubmittals received  9/1/2006  
Received transmittal sheet, 1pg. fax transmittal, 1pg. memo from BRS Arch., 2 copies of pages M-1 & M-3; taken to Carl Westfall
Telephone call  8/24/2006 DONE
Talked to a representative of the Mechanical Engineer and discussed the concern about economizers and outside air.
Telephone call  8/12/2006 DONE
Called to talk to the Mechanical Engineer (Richard Kartchner). He was not available. Left a message. Some issues need to be discussed (ventilation and economizers). Waiting for a return call.
Routing - PLAN CHECK7/18/2006 8/12/2006 FAIL
Mechanical issues not fully resolved. Revised plan review report sent to the Architect's rep. (Jeff Likes).
Plan resubmittals received  8/10/2006 DONE
Received 1 transmittal,1 memo,1 transmittal letter,3 structural calcs & 2 copys of sheets G1.1,A1.1,A4.2,I-2.01,M-1,M-2M-3E1.1 taken to Carl W.
1st review completed  7/18/2006 FAIL
Failed plan check.
Routing - FIRE7/13/2006 7/18/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK7/5/2006 7/13/2006 FAIL
The IBC plan review was started on July 13, 2006 and was finished the same day. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS7/3/2006 7/5/2006 PASS
Routing - Addressing7/3/2006 7/3/2006 PASS
BLD-Conference6/27/20066/27/20066/28/2006PDONE
DetailsForrest France
Phone conversation with contractor regarding duct smoke detection requirements for HVAC shutdown in a proposed common plenum.
BLD-Conference6/27/20066/27/20066/27/2006APASS
DetailsDixie Fellows
per dixie..referred richard kartchner to sam rogers regarding outside fresh air not being ducted to r/a on all units..they are using the ceiling as a plenum and the units will all have duct detectors in the r/a's.
Plans ACCEPTED BY PLAN TECH  6/27/2006  
Recd Pcfee & Taken To Pln CK  6/26/2006  
Application received  6/23/2006