(F) Reprint permit | | | 8/28/2007 | | DONE |
|
|
|
|
Third Notice BLD | 1/8/2007 | 1/8/2007 | 1/25/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/2/2006 | 12/27/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 11/2/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11279 issued 11-2-06 to Levi Strauss & Co.
|
BLD-Final | 10/31/2006 | 11/1/2006 | 11/1/2006 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### ok for perm occ
|
Permanent Occupancy | | 11/1/2006 | 11/1/2006 | | DONE |
|
|
|
|
BLD-Final | 10/24/2006 | 10/25/2006 | 10/26/2006 | P | PART |
Dave Hannah
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for temp occ needs lav in mens restroom moved
|
FIRE-Final Inspection | 10/24/2006 | 10/25/2006 | 10/25/2006 | A | PASS |
Forrest France
|
|
|
Required corrections have been made, fire life safety finaled.
|
Temporary occupancy | | | 10/25/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5466 issued 10-25-06 to Levi Strauss & Co.
|
FIRE-Final Inspection | 10/23/2006 | 10/24/2006 | 10/24/2006 | A | FAIL |
Troy Cobbley
|
|
|
Provide suite number, exit discharge lighting at the front exit (rear exit is covered) and provide an indicator at the front exit.
|
BLD-Final | 10/19/2006 | 10/20/2006 | 10/20/2006 | P | NR |
Dave Hannah
|
|
|
Dave I will be heading out of town around 2:00 PM. Please call Michael Jones with # above for inspection. Thanks Paul; Phone #: ###-####
|
FIRE-Final Inspection | 10/19/2006 | 10/20/2006 | 10/20/2006 | P | FAIL |
Forrest France
|
|
|
The project related fire sprinkler permit must be finaled prior to life safety final, also missing PFE, project is not in a condition for final life safety inspection at this time.
|
BLD-Wall cover | 9/20/2006 | 9/21/2006 | 9/21/2006 | A | PASS |
Dave Hannah
|
|
|
Dave: I will need you to have look of vapor barrier and if things go ok with electrical / sprinkler inspections I'd like to cover ceilings. Thanks Paul
|
Case Summary (BLD) | | | 9/21/2006 | | DONE |
|
|
|
|
BLD-Wall cover | 9/13/2006 | 9/14/2006 | 9/15/2006 | P | FAIL |
Dave Hannah
|
|
|
vapor barreir not class a
|
BLD-Framing/Rough-in | 9/12/2006 | 9/13/2006 | 9/13/2006 | A | PART |
Dave Hannah
|
|
|
see you tomorrow. ok to cover int walls
|
Issue PAID IN FULL permit | | | 8/14/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/9/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/9/2006 | | |
|
|
|
tlk to william ###-#### 102 that permit and fees are ready to be picked up but needs GC and RCE #
|
Permit Ready to Issue | | | 8/9/2006 | | |
|
|
|
|
Routing - PLANNING | 8/7/2006 | | 8/8/2006 | | PASS |
|
|
|
Approved per CZC06-00141.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2006 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 7/3/2006 | | 8/8/2006 | | PASS |
|
|
|
8/8/2006 15:53:45 CJW - activity updated through activity BLDA022 from case BLD06-01860.
|
Routing - PLAN CHECK | 7/19/2006 | | 8/7/2006 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
Routing - FIRE | 8/7/2006 | | 8/7/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Plan resubmittals received | | | 8/3/2006 | | |
|
|
|
Received a copy of Cover letter, Plan review response letter, Plan reveiew report, 3 copies of Lighting & power Compliance, 3 copies of M-101, M-102, P-101, E-101, E-102, E-103, E-104, 2 copies of the following sheets-- G-001, A-101, A-102, A-103, A-201, A-401, A-402, A-501, A-502, A-601, and taken to Carl Westfall
|
Routing - FIRE | 7/17/2006 | | 7/19/2006 | | FAIL |
|
|
|
Faxed resubmittal item to the architect.
|
1st review completed | | | 7/19/2006 | | FAIL |
|
|
|
Failed Plan Check and Fire.
|
Routing - PLANNING | 7/14/2006 | | 7/17/2006 | | PASS |
|
|
|
Exterior changes. Given to Greg.
Applicant has not submitted required DR application (Zoning Cert.) - architect has been called
|
Plan Reviewer's activity | | | 7/14/2006 | | |
|
|
|
(7-14-06) Need the architect's E-mail address before I can send the plan review report. Called and left a message. Waiting for response. (7-17-06) The architect called and gave his E-mail address. The report was sent.
|
Routing - PLAN CHECK | 7/5/2006 | | 7/14/2006 | | FAIL |
|
|
|
The IBC plan review report was started on July 13, 2006 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 7/3/2006 | | 7/5/2006 | | PASS |
|
|
|
|
Application received | | | 6/28/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/28/2006 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/28/2006 | | |
|
|
|
|