Second Notice BLD | 2/2/2007 | 2/2/2007 | 2/12/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/29/2006 | 2/2/2007 | | DONE |
|
|
|
|
BLD-Final | 11/28/2006 | 11/29/2006 | 11/29/2006 | P | PASS |
Jim Sly
|
|
|
tim ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith OK for Perm Occ.
|
FIRE-Final Inspection | 11/28/2006 | 11/29/2006 | 11/29/2006 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
Plan resubmittals received | | | 11/29/2006 | | |
|
|
|
Received revised drawings on pages A2.0 (2 copies); taken to Dan Stuart
|
Plan Reviewer's activity | | | 11/29/2006 | | PASS |
|
|
|
New Floor plan Sheet A2.0 provided. Tenant / owner wants to remove one set of double doors and install windows. This still leaves double, 3' doors at main egress / access and two additional 3' doors at different locations in the rear wall so required exiting is not jeporadized. Change oaky - copy of resubmittal sheet to records and one to inspectors box to deliver to job site.
|
Telephone call | | | 11/29/2006 | | DONE |
|
|
|
Called Jim to let him know the change to original approved floor plan replacing one set of double doors with windows is okay. exiting requirements is maintained. Approved resubmittal plan sheet A2.0 has had copy of changes sent to records and a second copy is in the inspectors out box for the job site.
|
Permanent occupancy | | | 11/29/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11328 issued 11-29-06 to Huntwood Industries.
|
FIRE-Conference | 11/21/2006 | 11/22/2006 | 11/22/2006 | A | DONE |
Troy Cobbley
|
|
|
I spoke to the contractor about deleting the east side pair of double aluminum storefront doors. Per Dan Stuart the architect will need to submit two updated plans showing this change.
|
Telephone call | | | 11/22/2006 | | DONE |
|
|
|
Call from Troy Cobbley, fire inspector. Contractor / tenant want to eliminate one set of the front double entry doors. This leaves them W/ 3 exit doors per Troy with at least 1/2 the diagonal of the tenant space separating required exits. I told Troy to have them go back through the design professional and provide plan modification desired for review and so a copy can be in our files. Troy said he would pass information to contractor.
|
BLD-Other | 10/13/2006 | 10/13/2006 | 10/13/2006 | P | PASS |
Jim Sly
|
|
|
tim Note: ceiling grid - Please call 1/2 hr prior; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 9/22/2006 | 9/22/2006 | 9/22/2006 | P | PASS |
Jim Sly
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Telephone call | | | 9/12/2006 | | DONE |
|
|
|
lft vm with larry knop ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 9/12/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/12/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/11/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/7/2006 | | 9/8/2006 | | PEND |
|
|
|
Inserted new plan resubmittals received to address code items needing correction or clarification from first plan review. Routing plans back to public works for assessment of new added restroom.
|
Routing - PUBLIC WORKS | 9/8/2006 | | 9/8/2006 | | PASS |
|
|
|
Back to Dan Stuart
|
Routing - PLAN CHECK | 9/8/2006 | | 9/8/2006 | | PASS |
|
|
|
Plans back from Public Works with fee adjustment. To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2006 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 7/3/2006 | | 9/8/2006 | | PASS |
|
|
|
9/8/2006 15:42:01 DRS - activity updated through activity BLDA022 from case BLD06-01871.
|
Plan resubmittals received | | | 9/6/2006 | | |
|
|
|
received 1 copy of cover transmittal, 1 copy of 2 page response letter from Larry Knopp, 1 copy of response letter from Musgrove Engineering, 2 copies of the following sheets--A0, A1.0, A2.0, E1.0, E2.0, MP1.0, M1.0, M2.0, P1.0 and taken to Dan Stuart
|
1st review completed | | | 8/7/2006 | | FAIL |
|
|
|
Failed plan check.
|
Routing - FIRE | 8/2/2006 | | 8/7/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Plan resubmittals requested | | | 8/2/2006 | | DONE |
|
|
|
Copy of plan review e-mailed and faxed to architect.
|
Routing - PLAN CHECK | 7/5/2006 | | 8/2/2006 | | FAIL |
|
|
|
Copy of corrections for code compliance e-mailed and faxed to architect. Routing to fire code analyst for review.
|
Routing - PUBLIC WORKS | 7/3/2006 | | 7/5/2006 | | PASS |
|
|
|
|
Routing - Addressing | 7/3/2006 | | 7/3/2006 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/29/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/29/2006 | | |
|
|
|
|
Application received | | | 6/28/2006 | | |
|
|
|
|
Third Notice BLD | 2/12/2007 | 2/12/2007 | | | |
|
|
|
Second Notice has not been responded to.
|