Letter of compliance | | | 12/17/2007 | | DONE |
|
|
|
Letter of Compliance issued 12-17-07
|
BLD-Final | 12/12/2007 | 12/12/2007 | 12/13/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/12/2007 at 11:02:54 AM. Contact: ###-####. ok for perm occ
|
FIRE-Final Inspection | 12/11/2007 | 12/12/2007 | 12/12/2007 | A | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory.
|
FIRE-Final Inspection | 9/20/2007 | 9/21/2007 | 9/21/2007 | P | CANC |
Forrest France
|
|
|
Overbooked.
|
Print Occupancy Form | | | 5/1/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/17/2007 | 1/17/2007 | 1/17/2007 | P | FAIL |
Troy Cobbley
|
|
|
I gave Don with Russell Corp. permission to use the phase one area of the third floor. See the building approved plans for the exact location marked and signed by me that was inspected. The items remaining include providing an air balance report for the hood and a K class extinguisher. Only the portion of the phase one area on the third floor alarm was tested. The other area was not complete. The lobby areas of the first and second floor fire alarm was tested. This includes the new facp panel, NAC panel, phone lines and elevator recall. See the approved fire alarm prints for devices marked "ok" that have been tested. Signals have been verified as well. Need 120volt monitoring of the elevator power and the correct orfice in the inspectors test connection. Asbuilts will be required to be submitted to the city prior to final.
|
FIRE-Conference | 12/20/2006 | 12/21/2006 | 12/21/2006 | A | DONE |
Forrest France
|
|
|
On site confrence to discuss project schedule and phased completion of tenant permits.
|
BLD-Conference | 12/19/2006 | 12/20/2006 | 12/20/2006 | A | PASS |
Dave Hannah
|
|
|
Don; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Conference | 11/17/2006 | 11/20/2006 | 11/20/2006 | A | PART |
Dave Hannah
|
|
|
Don, ceiling inspection please; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to drop in tiles after elec oks
|
BLD-Framing/Rough-in | 10/13/2006 | 10/16/2006 | 10/16/2006 | P | PASS |
Dave Hannah
|
|
|
Don; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
Issue PAID IN FULL permit | | | 8/31/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/3/2006 | | |
|
|
|
lft ms with secretary for wes steele ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 8/3/2006 | | DONE |
|
|
|
|
1st review completed | | | 8/2/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/2/2006 | | 8/2/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/2/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/2/2006 | | |
|
|
|
|
Plan assigned to (R_H) | 7/3/2006 | | 8/2/2006 | | PASS |
|
|
|
8/2/2006 13:42:17 RMH - activity updated through activity BLDA022 from case BLD06-01887.
|
Routing - FIRE | 7/31/2006 | | 8/2/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Case Summary (BLD) | | | 7/31/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/7/2006 | | 7/31/2006 | | PASS |
|
|
|
No corrections by building department review routed plans to fire on 7/31/06, permit pending fire departments review.
|
Routing - PLUMBING | 7/5/2006 | | 7/7/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 7/3/2006 | | 7/5/2006 | | PASS |
|
|
|
|
Routing - Addressing | 7/3/2006 | | 7/3/2006 | | PASS |
|
|
|
|
Application received | | | 6/30/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/30/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/30/2006 | | |
|
|
|
|