Third Notice BLD | 4/2/2007 | 4/2/2007 | 4/2/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 3/21/2007 | 3/21/2007 | 4/2/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/2/2007 | 3/21/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 3/2/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11462 issued 3-2-07 to LeMaster & Daniels.
|
FIRE-Final Inspection | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Forrest France
|
|
|
Required correction has been field verified for completion, fire life safety finaled.
|
BLD-Final | 2/28/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Dave Hannah
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for perm occ
|
Permanent Occupancy | | 3/1/2007 | 3/1/2007 | | DONE |
|
|
|
|
BLD-Final | 2/23/2007 | 2/26/2007 | 2/26/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/23/2007 at 7:34:47 PM. Contact: ###-####. ok for perm occ after other trades sign off perm
|
FIRE-Final Inspection | 12/15/2006 | 12/15/2006 | 12/15/2006 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed, one missing exit discharge light at the second required exit fire escape stairs to be installed and verified for compliance prior to structural final as agreed.
|
BLD-Final | 12/14/2006 | 12/15/2006 | 12/15/2006 | A | PART |
Dave Hannah
|
|
|
This is for a final & fire/life & safety. Please contact Greg Bolton prior to going out at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok for temp occ
|
Temporary occupancy | | | 12/15/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5491 issued 12-15-06 to Le Master & Daniels.
|
BLD-Final | 12/14/2006 | 12/14/2006 | 12/14/2006 | P | FAIL |
Dave Hannah
|
|
|
This is for a Fire/Life/Safety & Structural Final. Please contact Greg Bolton prior to going out at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson needs other trades finaled
|
BLD-Final | 12/13/2006 | 12/14/2006 | 12/14/2006 | A | FAIL |
Dave Hannah
|
|
|
This is for a Fire/Life/Safety & Structural Final. Please contact Greg Bolton prior to going out at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
|
FIRE-Final Inspection | 12/14/2006 | 12/14/2006 | 12/14/2006 | A | NR |
Forrest France
|
|
|
Pending project related fire alarm permit final.
|
Print Occupancy Form | | | 12/12/2006 | | DONE |
|
|
|
|
BLD-Other | 11/9/2006 | 11/9/2006 | 11/9/2006 | P | PART |
Dave Hannah
|
|
|
This is for a ceiling inspection. Please contact Greg Bolton @ ###-#### prior to going out. Thank You; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to cover ceilings after elec oks
|
BLD-Conference | 11/6/2006 | 11/7/2006 | 11/7/2006 | A | PASS |
Dave Hannah
|
|
|
Please call prior to coming out. Thank You; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
|
BLD-Conference | 11/2/2006 | 11/2/2006 | 11/2/2006 | P | PEND |
Dave Hannah
|
|
|
Please call Greg Bolton @ ###-#### prior to going to site. Thank You; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
|
BLD-Framing/Rough-in | 9/22/2006 | 9/22/2006 | 9/22/2006 | P | PART |
Dave Hannah
|
|
|
If you have any questions please contact Greg Bolton at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to cover int walls
|
BLD-Framing/Rough-in | 9/14/2006 | 9/15/2006 | 9/15/2006 | A | PART |
Jim Sly
|
|
|
We are needing this first thing in the morning if possible. If you have any questions please contact Greg Bolton @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson Walls OK to cover.......Leave open areas to check sealing of floor penitrations and completion of 2hr shaft. Asked framer to add top of wall bracing in selected areas. Advised to contact Architect to verify what type of install for celing grid (contradiction in plans)....and reminded of 34" max counter in break room.
|
Issue PAID IN FULL permit | | | 8/8/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/20/2006 | | DONE |
|
|
|
|
Telephone call | | | 7/20/2006 | | DONE |
|
|
|
called ###-#### and left voicemessage for Sam Burrows that permit is ready and fees
|
1st review completed | | | 7/19/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/19/2006 | | 7/19/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/19/2006 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 7/3/2006 | | 7/19/2006 | | PASS |
|
|
|
7/19/2006 15:24:44 CJW - activity updated through activity BLDA022 from case BLD06-01893.
|
Routing - FIRE | 7/17/2006 | | 7/19/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 7/5/2006 | | 7/17/2006 | | PASS |
|
|
|
The IBC plan review was started on July 15, 2006 and was finished on July 17, 2006. The drawings were approved. See the plan review report.
|
Routing - PUBLIC WORKS | 7/3/2006 | | 7/5/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/3/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/3/2006 | | |
|
|
|
|
Routing - Addressing | 7/3/2006 | | 7/3/2006 | | PASS |
|
|
|
|
Application received | | | 6/30/2006 | | |
|
|
|
|