BLD-Aging Inspection | 11/10/2008 | 11/10/2008 | 11/10/2008 | | CANC |
Tom Arcoraci
|
|
|
|
Expired/Cancelled | 11/10/2008 | 11/10/2008 | 11/10/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 6/9/2008 | 6/9/2008 | 6/9/2008 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 2/28/2008 | 2/29/2008 | 2/29/2008 | A | PASS |
Tom Arcoraci
|
|
|
Tim Phone #: ###-####
|
BLD-Final | 1/14/2008 | 1/16/2008 | 1/16/2008 | P | NR |
Tom Arcoraci
|
|
|
glen Phone #: ###-####
|
FIRE-Final Inspection | 1/14/2008 | 1/16/2008 | 1/16/2008 | A | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
BLD-Final | 12/28/2007 | 12/31/2007 | 12/31/2007 | A | NR |
Tom Arcoraci
|
|
|
glen Phone #: ###-#### needs sink per plan in bathroom
|
FIRE-Final Inspection | 12/27/2007 | 12/28/2007 | 12/28/2007 | A | PASS |
Troy Cobbley
|
|
|
The fire final inspection for this permit is passed.This permit was for NO TENANT - WAREHOUSE REMODEL,NOT TO BE USED FOR STORAGE, NO OCCUPANCY UNDER THIS PERMIT. A FUTURE PERMIT WILL BE REQUIRED TO OCCUPY TENANT SPACE. after entering the building I found that the building was being occupied by a plastics company, there were pallets of plastic, two boats and a big machine that looked like it was grinding the plastic.I let the tenants know that they need to go down town and start the paper work fo a CO. I also turned this matter over to Steve Keuter, who visited the site within the hour and per his instruction, this permit is being "finaled", as the scope of work is satisfactory. Steve indicated he has "red tagged" the building and the FD will be following up to ensure a permit is obtained. KR
|
Telephone call | | | 12/28/2007 | | DONE |
|
|
|
Received telephone calls from Jock Farrah, employee of PVC Spiral Supply inquiring how to get a CO. I explained the fire code issues, guided him to the online TI application form, conferenced him to Dan Stuart who explained the building plan review process. Received a follow-up phone message from him and when I called back I spoke with Jenny, office manager, ( in Jock's absense) and gave her essentially the same information, showing her this online permit which specifies "NO OCCUPANCY UNDER THIS PERMIT. A FUTURE PERMIT WILL BE REQUIRED TO OCCUPY TENANT SPACE" I suggested she could call the leasing agent to inquire why it was leased to them in July 2007 in this condition and with no advice that they needed to get a CO. I also recommended they ask the facility leasing agent for a scaled floor plan to use to show the layout of the new manufacturing (plastic grinding) operations, plastic product storage areas, and other occupancy information, like ailses, height of storage, type of storage, combustible liquid storage like oils (if any), offices, etc) and include that with their application. Suggested she ask the leasing agent for guidance on obtaining information on the sprinkler design or an evalatuation by a sprinkler contractor so they can include that informatin with their application so we can evaluate the adequacy of sprinklers for their specific storage and occupancy.
|
BLD-Final | 12/26/2007 | 12/27/2007 | 12/27/2007 | A | CANC |
Tom Arcoraci
|
|
|
glen Phone #: ###-####
|
FIRE-Final Inspection | 11/14/2007 | 11/19/2007 | 11/19/2007 | P | FAIL |
Troy Cobbley
|
|
|
glen Phone #: ###-#### No sprinkler permit has been pulled and the sprinkler work is not complete. No inspection performed.
|
BLD-Final | 11/13/2007 | 11/20/2007 | 11/19/2007 | A | CANC |
Tom Arcoraci
|
|
|
glen Phone #: ###-#### Note: please call 1/2 pr to inspection Inspection cancelled from web by: Patricia Smith
|
BLD-Footing | 10/5/2007 | 10/5/2007 | 10/5/2007 | P | DONE |
Tom Arcoraci
|
|
|
mike Phone #: ###-####
|
BLD-Footing | 10/4/2007 | 10/5/2007 | 10/5/2007 | A | PASS |
Tom Arcoraci
|
|
|
mike
|
BLD-Footing | 10/3/2007 | 10/4/2007 | 10/4/2007 | A | NR |
Tom Arcoraci
|
|
|
mike Phone #: ###-####
|
BLD-Final | 6/28/2007 | 6/28/2007 | 6/28/2007 | P | NR |
Tom Arcoraci
|
|
|
anthony Phone #: ###-#### Note; PLEASE CALL FOR ACCESS called left message no return call also needs fire sign off prior to building final
|
FIRE-Final Inspection | 5/29/2007 | 5/30/2007 | 5/30/2007 | A | FAIL |
Troy Cobbley
|
|
|
Sprinkler heads are overspaced in one office, too close to a wall in another and the telephone room is missing a sprinker head. This work will require permits. Provide fire extinguishers as discussed and provide sticker at the main exit door.
|
BLD-Final | 5/24/2007 | 5/25/2007 | 5/25/2007 | A | NR |
Tom Arcoraci
|
|
|
anthony Note:please call for access; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Aging Inspection | 4/12/2007 | 4/12/2007 | 4/13/2007 | | PASS |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 1/11/2007 | | |
|
|
|
|
Telephone call | | | 1/10/2007 | | DONE |
|
|
|
lft ms with secretary steve trout that permit and fees are ready but needs GC/RCE and RP
|
Permit Ready to Issue | | | 1/10/2007 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/9/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/9/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/8/2007 | | |
|
|
|
|
Plan assigned to (R_H) | 7/10/2006 | | 1/8/2007 | | PASS |
|
|
|
1/8/2007 14:53:05 RMH - activity updated through activity BLDA022 from case BLD06-01940.
|
Routing - PLAN CHECK | 1/4/2007 | | 1/5/2007 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 1/5/2007 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 1/2/2007 | | 1/4/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - Erosion and Sediment | 12/11/2006 | | 12/13/2006 | | FAIL |
|
|
|
ESC plan failed, no ESC application included with submittal. Notified PD.
|
Plan resubmittals received | | | 12/13/2006 | | |
|
|
|
Received Project Memo, Erosion and Sediment Control Permit Application w/ copied photograph of site, and 3 copies of page A3; taken to Ron Hill
|
Routing - PLAN CHECK | 12/11/2006 | | 12/11/2006 | | FAIL |
|
|
|
faxed requirements to architect on 12/11/06, routed plans to Erosion Sediment Control same day.
|
Plan resubmittals received | | | 11/30/2006 | | |
|
|
|
received project memo from trout architects chartered & 2 booklets of the erosion and sediment control narrative (13) pages each, & 2 sheets of plans -plans taken to ron hill
|
Plan resubmittals received | | | 11/28/2006 | | |
|
|
|
Received memo from Trout Architects, 2 copies of structural calculations, 3 copies of the following pages: cover sheet, A1, A3, A4; taken to Ron Hill
|
Routing - PLAN CHECK | 8/10/2006 | | 10/31/2006 | | FAIL |
|
|
|
Resubmittals failed review. Faxed corrections to architect on 10/31/06,
|
Plan resubmittals received | | | 10/10/2006 | | DONE |
|
|
|
Received 1 project memo, & 3 copys of sheets A.1,A2,A3,A4,A5 taken to Ron H.
|
Plan Reviewer's activity | | | 9/8/2006 | | |
|
|
|
Met with Dave Bliss on project 9/7/06
|
1st review completed | | | 8/10/2006 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - FIRE | 8/8/2006 | | 8/10/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Case Summary (BLD) | | | 8/8/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/11/2006 | | 8/8/2006 | | FAIL |
|
|
|
faxed and mailed requirements to architect, routed plans to fire 8/8/06
|
Routing - PUBLIC WORKS | 7/10/2006 | | 7/11/2006 | | PASS |
|
|
|
|
Application received | | | 7/7/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 7/7/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/7/2006 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/7/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 7/7/2006 | | |
|
|
|
|