Permit Information
Permit NumberBLD06-01940
StatusExpired
Name WESTMINSTER HOMES
Site Address 33 N PHILLIPPI ST
Project NamePHILLIPPI WAREHOUSE
Customer Number 
ePlanReviewNo
Description
STEED CONSTRUCTION- REC #2056 (NO TENANT - WAREHOUSE REMODEL) To remodel a 9,430 sq.ft. warehouse tenant space per approved plans. Work includes removing stairway to noncompling mezzanine, the mezzanine is NOT TO BE USED FOR STORAGE, install exit signage and provide accessibility upgrades to restrooms, construction of new exterior loading dock ramp, Miscellaneous related finishes. NO OCCUPANCY UNDER THIS PERMIT. A FUTURE PERMIT WILL BE REQUIRED TO OCCUPY TENANT SPACE. This building is fully fire sprinklered any alteration or modification to the sprinkler system shall be per NFPA #13 as regulated by the fire department. RMH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection11/10/200811/10/200811/10/2008 CANC
DetailsTom Arcoraci
Expired/Cancelled11/10/200811/10/200811/10/2008APASS
DetailsTom Arcoraci
BLD-Aging Inspection6/9/20086/9/20086/9/2008 DONE
DetailsTom Arcoraci
BLD-Final2/28/20082/29/20082/29/2008APASS
DetailsTom Arcoraci
Tim Phone #: ###-####
BLD-Final1/14/20081/16/20081/16/2008PNR
DetailsTom Arcoraci
glen Phone #: ###-####
FIRE-Final Inspection1/14/20081/16/20081/16/2008APASS
DetailsTroy Cobbley
life safety passed.
BLD-Final12/28/200712/31/200712/31/2007ANR
DetailsTom Arcoraci
glen Phone #: ###-#### needs sink per plan in bathroom
FIRE-Final Inspection12/27/200712/28/200712/28/2007APASS
DetailsTroy Cobbley
The fire final inspection for this permit is passed.This permit was for NO TENANT - WAREHOUSE REMODEL,NOT TO BE USED FOR STORAGE, NO OCCUPANCY UNDER THIS PERMIT. A FUTURE PERMIT WILL BE REQUIRED TO OCCUPY TENANT SPACE. after entering the building I found that the building was being occupied by a plastics company, there were pallets of plastic, two boats and a big machine that looked like it was grinding the plastic.I let the tenants know that they need to go down town and start the paper work fo a CO. I also turned this matter over to Steve Keuter, who visited the site within the hour and per his instruction, this permit is being "finaled", as the scope of work is satisfactory. Steve indicated he has "red tagged" the building and the FD will be following up to ensure a permit is obtained. KR
Telephone call  12/28/2007 DONE
Received telephone calls from Jock Farrah, employee of PVC Spiral Supply inquiring how to get a CO. I explained the fire code issues, guided him to the online TI application form, conferenced him to Dan Stuart who explained the building plan review process. Received a follow-up phone message from him and when I called back I spoke with Jenny, office manager, ( in Jock's absense) and gave her essentially the same information, showing her this online permit which specifies "NO OCCUPANCY UNDER THIS PERMIT. A FUTURE PERMIT WILL BE REQUIRED TO OCCUPY TENANT SPACE" I suggested she could call the leasing agent to inquire why it was leased to them in July 2007 in this condition and with no advice that they needed to get a CO. I also recommended they ask the facility leasing agent for a scaled floor plan to use to show the layout of the new manufacturing (plastic grinding) operations, plastic product storage areas, and other occupancy information, like ailses, height of storage, type of storage, combustible liquid storage like oils (if any), offices, etc) and include that with their application. Suggested she ask the leasing agent for guidance on obtaining information on the sprinkler design or an evalatuation by a sprinkler contractor so they can include that informatin with their application so we can evaluate the adequacy of sprinklers for their specific storage and occupancy.
BLD-Final12/26/200712/27/200712/27/2007ACANC
DetailsTom Arcoraci
glen Phone #: ###-####
FIRE-Final Inspection11/14/200711/19/200711/19/2007PFAIL
DetailsTroy Cobbley
glen Phone #: ###-#### No sprinkler permit has been pulled and the sprinkler work is not complete. No inspection performed.
BLD-Final11/13/200711/20/200711/19/2007ACANC
DetailsTom Arcoraci
glen Phone #: ###-#### Note: please call 1/2 pr to inspection Inspection cancelled from web by: Patricia Smith
BLD-Footing10/5/200710/5/200710/5/2007PDONE
DetailsTom Arcoraci
mike Phone #: ###-####
BLD-Footing10/4/200710/5/200710/5/2007APASS
DetailsTom Arcoraci
mike
BLD-Footing10/3/200710/4/200710/4/2007ANR
DetailsTom Arcoraci
mike Phone #: ###-####
BLD-Final6/28/20076/28/20076/28/2007PNR
DetailsTom Arcoraci
anthony Phone #: ###-#### Note; PLEASE CALL FOR ACCESS called left message no return call also needs fire sign off prior to building final
FIRE-Final Inspection5/29/20075/30/20075/30/2007AFAIL
DetailsTroy Cobbley
Sprinkler heads are overspaced in one office, too close to a wall in another and the telephone room is missing a sprinker head. This work will require permits. Provide fire extinguishers as discussed and provide sticker at the main exit door.
BLD-Final5/24/20075/25/20075/25/2007ANR
DetailsTom Arcoraci
anthony Note:please call for access; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Aging Inspection4/12/20074/12/20074/13/2007 PASS
DetailsTom Arcoraci
Issue PAID IN FULL permit  1/11/2007  
Telephone call  1/10/2007 DONE
lft ms with secretary steve trout that permit and fees are ready but needs GC/RCE and RP
Permit Ready to Issue  1/10/2007 DONE
Override - Parcel Holds  1/9/2007  
Inspection Record Card- Bld  1/9/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/8/2007 DONE
Print Occupancy Form  1/8/2007  
Plan assigned to (R_H)7/10/2006 1/8/2007 PASS
1/8/2007 14:53:05 RMH - activity updated through activity BLDA022 from case BLD06-01940.
Routing - PLAN CHECK1/4/2007 1/5/2007 PASS
Case Summary (BLD)  1/5/2007 DONE
Routing - Erosion and Sediment1/2/2007 1/4/2007 PASS
ESC plan approved with attached conditions.
Routing - Erosion and Sediment12/11/2006 12/13/2006 FAIL
ESC plan failed, no ESC application included with submittal. Notified PD.
Plan resubmittals received  12/13/2006  
Received Project Memo, Erosion and Sediment Control Permit Application w/ copied photograph of site, and 3 copies of page A3; taken to Ron Hill
Routing - PLAN CHECK12/11/2006 12/11/2006 FAIL
faxed requirements to architect on 12/11/06, routed plans to Erosion Sediment Control same day.
Plan resubmittals received  11/30/2006  
received project memo from trout architects chartered & 2 booklets of the erosion and sediment control narrative (13) pages each, & 2 sheets of plans -plans taken to ron hill
Plan resubmittals received  11/28/2006  
Received memo from Trout Architects, 2 copies of structural calculations, 3 copies of the following pages: cover sheet, A1, A3, A4; taken to Ron Hill
Routing - PLAN CHECK8/10/2006 10/31/2006 FAIL
Resubmittals failed review. Faxed corrections to architect on 10/31/06,
Plan resubmittals received  10/10/2006 DONE
Received 1 project memo, & 3 copys of sheets A.1,A2,A3,A4,A5 taken to Ron H.
Plan Reviewer's activity  9/8/2006  
Met with Dave Bliss on project 9/7/06
1st review completed  8/10/2006 FAIL
Failed Plan Check.
Routing - FIRE8/8/2006 8/10/2006 PASS
Attached review comments to plans.
Case Summary (BLD)  8/8/2006 DONE
Routing - PLAN CHECK7/11/2006 8/8/2006 FAIL
faxed and mailed requirements to architect, routed plans to fire 8/8/06
Routing - PUBLIC WORKS7/10/2006 7/11/2006 PASS
Application received  7/7/2006  
Override - Parcel Holds  7/7/2006  
Recd Pcfee & Taken To Pln CK  7/7/2006 DONE
Plans ACCEPTED BY PLAN TECH  7/7/2006  
Override - Parcel Holds  7/7/2006