Second Notice BLD | 5/9/2007 | 5/9/2007 | 5/18/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/23/2007 | 5/9/2007 | | DONE |
|
|
|
|
BLD-Final | 4/5/2007 | 4/6/2007 | 4/6/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/5/2007 at 4:46:43 PM. Contact: ###-####. Final ok.
|
Permanent occupancy | | | 4/6/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11518 issued 4-6-07 to the Lyle Pearson Car Wash.
|
Code Occupancy Approval | 4/5/2007 | 4/5/2007 | 4/5/2007 | P | PASS |
Scott M.Brown
|
|
|
THEY OBTAINED MOD FOR ROOF & COLOR, OK NOW FINAL SIGNED OFF
|
Permanent Occupancy | | 4/5/2007 | 4/5/2007 | | DONE |
|
|
|
|
BLD-Final | 2/1/2007 | 2/2/2007 | 2/2/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/1/2007 at 6:09:06 PM. Contact: ###-####. Will be ok for perm occ once elec. and code enfor. goes perm.
|
Temporary occupancy | | | 2/2/2007 | | DONE |
|
|
|
Temp. Occ. Cert. # 5533 issued 2-2-07 to Lyle Pearson - Car Wash
|
FIRE-Final Inspection | 1/31/2007 | 1/31/2007 | 1/31/2007 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
BLD-Final | 1/30/2007 | 1/31/2007 | 1/31/2007 | A | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/30/2007 at 3:55:54 PM. Contact: ###-####.
|
BLD-Foundation | 10/5/2006 | 10/5/2006 | 10/5/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/5/2006 at 7:39:18 AM. Contact: ###-####.
|
BLD-Footing | 10/4/2006 | 10/4/2006 | 10/4/2006 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/4/2006 at 7:16:21 AM. Perimeter footings. Job will have special insp.
|
Issue PAID IN FULL permit | | | 9/29/2006 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 8/8/2006 | 8/8/2006 | 9/18/2006 | | PASS |
|
|
|
9/18/2006 11:28:11 MLO - activity updated through activity BLDA022 from case BLD06-01946.
|
Plan Reviewer's activity | | | 9/18/2006 | | DONE |
|
|
|
recieved letter from architect concerning ventilation of electrical room in shop area.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/18/2006 | | |
|
|
|
|
Telephone call | | | 9/18/2006 | | DONE |
|
|
|
tlk to brian gilbrentin ###-#### that permit and fees are ready to be picked up but need a copy of ACHD fees
|
Permit Ready to Issue | | | 9/18/2006 | | |
|
|
|
|
Plan resubmittals received | | | 9/15/2006 | | |
|
|
|
received a letter from zga architects including (5) copies--took paperwork to mike otto
|
Routing - FIRE | 9/11/2006 | | 9/12/2006 | | PASS |
|
|
|
Attached reivew comments to plans.
|
Plan resubmittals received | | | 9/11/2006 | | |
|
|
|
received a letter from zga, & "2" sheets of A2.1-plans taken to scott arellano
|
Telephone call | | | 9/8/2006 | | DONE |
|
|
|
Faxed architect revised resubmittal requirements regarding the necessary building seperation for fire flow calculation reduction considerations. Spoke with Bryan Gilbreath.
|
Routing - PLAN CHECK | 8/30/2006 | | 9/1/2006 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 9/1/2006 | | |
|
|
|
|
Plan resubmittals received | | | 9/1/2006 | | |
|
|
|
Received 1pg. response, 2 copies of 1pg. Unite Water Flow letter, 2 copies of A1.1; taken to Mike Otto
|
1st review completed | | | 8/30/2006 | | FAIL |
|
|
|
Failed Fire.
|
Routing - FIRE | 8/24/2006 | | 8/30/2006 | | FAIL |
|
|
|
Faxed resubmittal items to architec. Attached review comments to plans.
|
Plan resubmittals received | | | 8/28/2006 | | |
|
|
|
Received 2 pg. response, 2 copies of the following pages: A0.1, A2.1, A3.1; taken to Mike Otto
|
Routing - PLAN CHECK | 8/15/2006 | | 8/24/2006 | | FAIL |
|
|
|
corrections sent to architect.
|
Plan resubmittals requested | | | 8/24/2006 | | DONE |
|
|
|
IBC corrections
|
Routing Off Site - STRUCTURAL | 8/8/2006 | | 8/22/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 8/14/2006 | | 8/15/2006 | | PASS |
|
|
|
Approved per DHR06-00112.
Plans redlined to install adequate signage for a one way service drive.
|
Routing - PLUMBING | 8/11/2006 | | 8/14/2006 | | PASS |
|
|
|
use boise city approved flammable liquids interceptor detail- attached.
|
Routing - Erosion and Sediment | 8/9/2006 | | 8/11/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 8/9/2006 | | 8/9/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 8/8/2006 | | 8/9/2006 | | PASS |
|
|
|
parcel is a platted lot in a recorded subdivision.
|
Telephone call | | | 8/8/2006 | | DONE |
|
|
|
called Action Couriers for pick up and deliver to AHJ Engineers
|
Plan routing begun/NEW & ADDTN | | | 8/8/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/7/2006 | | |
|
|
|
brought in new set of stamped plans. P1.0 (there are 2 pages labled P1.0, the other is stamped) & P1.1 not stamped ok to accept per John M.
|
CHANGE STATUS TO (PND) | | | 7/10/2006 | | |
|
|
|
plans need stamped and signed on pg. P1.0, P1.1, put in hold drawer//7/10/06 LEG
|
Application received | | | 7/7/2006 | | |
|
|
|
|