Third Notice BLD | 1/8/2007 | 1/8/2007 | 1/26/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/17/2006 | 12/27/2006 | | DONE |
|
|
|
|
BLD-Final | 10/17/2006 | 10/17/2006 | 10/17/2006 | P | PASS |
Mike Jordan
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Ok for perm occ.
|
Permanent Occupancy | | 10/17/2006 | 10/17/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 10/17/2006 | | |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 10/17/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11254 issued 10-17-06 to Executrain.
|
FIRE-Final Inspection | 10/13/2006 | 10/16/2006 | 10/16/2006 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
BLD-Final | 10/12/2006 | 10/13/2006 | 10/13/2006 | A | PART |
Mike Jordan
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Temp occ granted. Life/safety needs to final and Needs to complete the restroom ada stuff.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 10/13/2006 | | |
|
|
|
|
FIRE-Final Inspection | 10/12/2006 | 10/12/2006 | 10/12/2006 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave hannimans permission until the knox box is provided.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 10/12/2006 | | |
|
|
|
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 10/12/2006 | | |
|
|
|
|
BLD-Other | 9/29/2006 | 9/29/2006 | 9/29/2006 | P | PEND |
Mike Jordan
|
|
|
odie - Note: ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Grid ok, awaiting fire to sign off above grid.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 9/29/2006 | | |
|
|
|
|
BLD-Energy code compliance | 9/5/2006 | 9/6/2006 | 9/6/2006 | A | PASS |
Mike Jordan
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 9/5/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 8/31/2006 | 9/1/2006 | 9/1/2006 | P | PASS |
Mike Jordan
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. ok to insul.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 8/31/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2006 | | PASS |
|
|
|
|
Print Occupancy Form | | | 8/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/30/2006 | | DONE |
|
|
|
lft vm with brian ###-#### that permit and fees are ready to be picked up but needs RCE/GC #
|
Override - Parcel Holds | | | 8/30/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 8/30/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/30/2006 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 8/3/2006 | | 8/30/2006 | | PASS |
|
|
|
8/30/2006 09:35:15 DRS - activity updated through activity BLDA022 from case BLD06-01978.
|
Routing - PLAN CHECK | 8/21/2006 | | 8/29/2006 | | PASS |
|
|
|
Resubmittals provided in response to plan review comments inserted into original plans replacing changed plan sheets. Red-line clarification was indicated on plans with code sections & details provided as attachement to plans. No further resubmittals required.
|
Plan resubmittals received | | | 8/29/2006 | | |
|
|
|
Received 2pg. response from Habitec Architecs, 4pg. resoponse from Farren Engineering, 1pg. letter from Pinnacle Eng. regarding roof top units, 3 copies of the following pages: A0.0, A2.1, A3.1, A7.1, A8.1, EN1.0, P0.0, P0.1, P1.0, M0.0, M0.1, M1.0, FA1, EL1, EL2, EP1, EP2, EP3, ET; taken to Dan Stuart
|
Telephone call | | | 8/29/2006 | | DONE |
|
|
|
Call to Michael Jordon, Structural Inspector, asking him to check out the shell permit address and see if work was being done. Last entries for permit were aging inspections. He checked the site and found the shell structure in place. He will tag for contractor to call for final inspection of shell permit by structural and fire departments.
|
Telephone call | | | 8/29/2006 | | DONE |
|
|
|
Called Brandi John to review requirements for Tactile EXIT Signs at exit discharge doors per Sec. 1011.3 IBC. She had not addressed this item in her resubmittal plans. I made her aware of requirement and will red-line location on plans and include code data in attached Plan Clarifications as part of approved plans.
|
Telephone call | | | 8/29/2006 | | DONE |
|
|
|
Called Jon Ferren, Ferrin Engineering to discuss conflict of comments about the over ride controls for the electrical automatic controls for lighting. Sheet EL1 indicated over ride control by main entry in reception area. Sheet EP3, Keynote #1 indicated an over ride control in each room. Mr. Ferrin indicated note on Sheet EP3 was incorrect. I will cross through on plans and reference Sheet EL1.
|
Routing - FIRE | 8/17/2006 | | 8/21/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 8/21/2006 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - PLAN CHECK | 8/3/2006 | | 8/17/2006 | | FAIL |
|
|
|
Copy of plan review to Wes Steele. Routing to fire code analyst for review.
|
Plan resubmittals requested | | | 8/17/2006 | | DONE |
|
|
|
Faxed and e-mailed a copy of plan review code items needing correction to Wes Steele, Habitec Architecture.
|
Plan Reviewer's activity | | | 8/3/2006 | | |
|
|
|
7/11/2006 - This application was received with rooms classified on drawings as "classroom". As this is and M-1D zone planning approval is required. Scott Spjute stated that a letter from the architect was required to describe the type of "classrooms" being used.
7/31/2006 - Letter was received by Sue Hansen. As a result the determination was made that the type of training for business employees was an allowed use for the zone. Copy of letter included as part of approved plans. Plans then approved by Sue Hansen and routing continued.
|
Routing - PUBLIC WORKS | 8/1/2006 | | 8/2/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 7/18/2006 | | 8/1/2006 | | PASS |
|
|
|
Requested letter explaining "class rooms" on 7/18/06. Letter received 7/31/06.
|
Plan resubmittals received | | | 7/31/2006 | | |
|
|
|
Received letter addressed to Scott Spjute from Wesley Steele from Habitec Architects, 6 copies of the following pages: E-1, E-2, E-3, E-4, E-5, P1.0, P2.0;; 3 copies of the following pages: C-1, C-2, C-3, C-4, C-5, C-6; taken to Scott Spjute.
|
Plans ACCEPTED BY PLAN TECH | | | 7/17/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/17/2006 | | DONE |
|
|
|
|
Application received | | | 7/11/2006 | | |
|
|
|
|