Case Summary (BLD) | | | 3/5/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/11/2014 | | DONE |
Barbara Stitt
|
|
|
|
Case Summary (BLD) | | | 7/31/2013 | | DONE |
|
|
|
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 8/12/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 7/16/2008 | 8/11/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/16/2008 | | |
|
|
|
|
FIRE-Final Inspection | 7/9/2008 | 7/10/2008 | 7/10/2008 | A | PASS |
Forrest France
|
|
|
C/N items verified for compliance, fire life safety final inspection passed.
|
FIRE-Final Inspection | 7/2/2008 | 7/3/2008 | 7/3/2008 | A | FAIL |
Forrest France
|
|
|
Smoke alarms at each unit must meet installation guidelines per NFPA 72 chapter 11, also see fire code review notes on approved plan set for details.
|
FIRE-Final Inspection | 7/1/2008 | 7/2/2008 | 7/2/2008 | A | DEFR |
Forrest France
|
|
|
AM inspections overbooked, contractor rescheduled for 7/3 per agreement.
|
FIRE-Final Inspection | 5/14/2008 | 5/15/2008 | 5/15/2008 | A | FAIL |
Forrest France
|
|
|
Need approved plans and fire code review notes available on site, missing knox box, per contractor no fire extinguishers have been provided, lacking vehicle impact protection at the three new hydrants due to incomplete site work/curbing, will need access to each unit to test smoke alarms.
|
Print Occupancy Form | | | 5/14/2008 | | DONE |
|
|
|
|
BLD-Final | 5/9/2008 | 5/9/2008 | 5/9/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/9/2008 at 1:36:26 AM. Contact: ###-####. ok for perm occ
|
BLD-Other | 4/21/2008 | 4/22/2008 | 4/24/2008 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/21/2008 at 4:50:20 PM. Contact: ###-####.
|
Code Occupancy Approval | | | 4/23/2008 | | DONE |
|
|
|
Landscaping and striping meet requirements
|
BLD-Final | 3/24/2008 | 3/24/2008 | 3/24/2008 | P | NH |
Forrest France
|
|
|
|
BLD-Final | 12/19/2007 | 12/21/2007 | 12/21/2007 | A | NR |
Dave Hannah
|
|
|
steve Note: 1st 10 Phone #: ###-#### needs to get fire and zoning finals
|
BLD-Energy code compliance | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | PASS |
Dave Hannah
|
|
|
steve ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover
|
BLD-Framing/Rough-in | 4/26/2007 | 4/27/2007 | 4/27/2007 | A | PASS |
Dave Hannah
|
|
|
Steve; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to insulate last five units
|
BLD-Energy code compliance | 4/23/2007 | 4/23/2007 | 4/23/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/23/2007 at 8:13:45 AM. Contact: ###-####.first five units ok to cover
|
BLD-Framing/Rough-in | 4/18/2007 | 4/19/2007 | 4/19/2007 | A | CANC |
Dave Hannah
|
|
|
stu; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles first five units of bldg no. one ok to insulate
|
Telephone call | | | 3/29/2007 | | DONE |
|
|
|
Phone conversation with Steve Remberg concerning metering for condos vs. townhouses and fire wall separations.
|
Meeting | | | 3/26/2007 | | DONE |
|
|
|
Met with Steve Renberg, contractor & Jim Schmer, electrical supervisor. Condominimum Units viewed same as apartments for electrical meter requirements. All meters for each building to be in one location, cannot have separate meter at each condo unit. Steve wanted to understand diference between condo requirements and townhouse requirements. Basically one has a property line as single family dwelling the condos do not so providing electrical feed is different.
|
Telephone call | | | 3/26/2007 | | DONE |
|
|
|
Called Steve to give him the phone number of Mary Watson, Assist. City Attorney to get an answer concerning common wall agreement requirements.
|
BLD-Framing/Rough-in | 1/31/2007 | 2/1/2007 | 2/2/2007 | A | PART |
Dave Hannah
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Beall second floor fire walls ok
|
BLD-Foundation | 12/8/2006 | 12/11/2006 | 12/11/2006 | A | PART |
Dave Hannah
|
|
|
STEVE nOTE: LAST INS BEFORE NOON IF POSSIBLE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 12/8/2006 | 12/8/2006 | 12/8/2006 | P | PASS |
Dave Hannah
|
|
|
STEVE nOTE: IF POSSIBLE RIGHT AFTER LUNCH - THANKS; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 12/4/2006 | 12/5/2006 | 12/5/2006 | P | PART |
Dave Hannah
|
|
|
steve - as early afternoon as possible ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith west half bld 1a ok to pour
|
Issue PAID IN FULL permit | | | 11/28/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/21/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/21/2006 | | DONE |
|
|
|
tlk to ron wager ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 11/21/2006 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 9/22/2006 | | 11/20/2006 | | PASS |
|
|
|
11/20/2006 14:25:23 DRS - activity updated through activity BLDA022 from case BLD06-01992.
|
Routing - PLAN CHECK | 10/17/2006 | | 11/20/2006 | | PASS |
|
|
|
Received certified copy of satisfaction of non-build agreement from Steve Remberg. To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/20/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/17/2006 | | 10/17/2006 | | PEND |
|
|
|
Inserted resubmittal Sheets E1, E2 & E3 W/ Water Plan into plans. Routing to plumbing code plan reviewer.
|
Print Pending Permit.LaserJet4 | | | 10/17/2006 | | |
|
|
|
|
Routing - PLUMBING | 10/17/2006 | | 10/17/2006 | | PASS |
|
|
|
plans show mains through the building only and vtr size and location. a typical unit plumbing plan will be required to be submitted at the time of the first rough-in or before.
|
Telephone call | | | 10/16/2006 | | DONE |
|
|
|
Called Steve Renberg to review status of plan review for all Fallingbrook Condominiums. As soon as we get plans in for plumbing review and they are approved, we will be ready to issue all permits. Left Steve phone message to this affect and my number to call back.
|
Telephone call | | | 10/16/2006 | | DONE |
|
|
|
Left voice message for Ron Wager, Walter & Wager Architects. Fallingbrook Condominiums need plumbing resubmittals for review and approval and then permit will be ready to issue. Left my phone number to call back.
|
Plan Reviewer's activity | | | 10/16/2006 | | DONE |
|
|
|
E-mail to owner indicating status of the permits for Fallingbrook Condominiums and need for correct plumbing resubmittals.
|
Routing - PLUMBING | 10/16/2006 | | 10/16/2006 | | FAIL |
|
|
|
met with builder, he will submit plans with trunk lines for this project and at the time of the first rough in or before he will submit a typical unit plumbing plan.
|
Telephone call | | | 10/16/2006 | | DONE |
|
|
|
Ron Wager returned my call. steve Renberg is working on plumbing plans for resubmittal. Ron is still looking into relocating assumed property line to be greater than 5 feet to each building to allow 1-hour on room side only but would still need to comply with exception 704.11, #5 at roof. Also waiting for numbers to determine possibility of instaling a full NFPA 13 instead of 13R.
|
Plan resubmittals received | | | 10/16/2006 | | |
|
|
|
Received 6 copies of sheets E-1, E-2, E-3 & water plan, received 2 copies of civil sheets 1of 5, 2 of 5, 3 of 5, 4 of 5, 5 of 5 and taken to Dan Stuart
|
Plan Reviewer's activity | | | 10/13/2006 | | DONE |
|
|
|
Faxed copy of plan review report to be attached to and part of the approved plans to the architect, Ron Wager @ ###-####.
|
Routing - PLAN CHECK | 10/4/2006 | | 10/12/2006 | | PEND |
|
|
|
Approved per red-lined comments on plans and all attached plan reviews of all agencies. Plans have failed in plumbing review and resubmittals are required.
|
Telephone call | | | 10/11/2006 | | DONE |
|
|
|
Called architect Ronald Wager to review requirements for 1-hour construction to to proximity to assumed property line between BLDS 3 & 4. Suggested changing 13R to full 13 system for allowable area increase so building 3 & 4 could be considered 1 building OR
|
Routing - PLUMBING | 9/27/2006 | | 10/4/2006 | | FAIL |
|
|
|
no plans
|
Routing - PUBLIC WORKS | 9/26/2006 | | 9/27/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/21/2006 | | 9/26/2006 | | ---- |
|
|
|
Routed back to Public Works.
|
Plan assigned to (SAM) | 7/17/2006 | | 9/22/2006 | | DEFR |
|
|
|
Reassigned to D. Stuart by MYS
|
Routing - PLANNING | 9/19/2006 | | 9/21/2006 | | PASS |
|
|
|
Sarah Schafer. After review send back to Plan Review.
Approved per DRH03-00124
|
Plan resubmittals received | | | 9/21/2006 | | |
|
|
|
Received transmittal letter, 1pg. response, 3pg. calculations, 4 copies of pg. S2.1; taken to Dan Stuart
|
Routing - PLAN CHECK | 8/29/2006 | | 9/19/2006 | | HOLD |
|
|
|
8/29/06-On hold waiting for resubmittals.
9/19/06-Sent to Planning for rereview.
|
Plan resubmittals received | | | 9/18/2006 | | |
|
|
|
Received copy of Plan Review Report and letter, 1pg. response, 2 copies of 1pg. floor plans, 4 copies of the following: A-0, A-1, A-6, A-14, A-15, A-16; taken to Sam Zahorka
|
1st review completed | | | 8/29/2006 | | FAIL |
|
|
|
Failed Public Works, Planning, Plumbing & Plan Check.
|
Routing - FIRE | 8/24/2006 | | 8/29/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 8/3/2006 | | 8/24/2006 | | FAIL |
|
|
|
Routed to fire. Mailed letter to Architect.
|
Routing - PLANNING | 8/1/2006 | | 8/3/2006 | | FAIL |
|
|
|
Cup03-00066, DRH03-00124 Sarah Schafer
Need to work with the applicant and the public regarding fencing and landscape. A public worksession will be scheduled for this discussion.
|
Routing - PLUMBING | 7/25/2006 | | 8/1/2006 | | FAIL |
|
|
|
provide a plumbing plan showing the above listed items. sewer line locations on page E-1 do not match civil plans.
|
Routing - Erosion and Sediment | 7/25/2006 | | 7/25/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | | | 7/25/2006 | | FAIL |
|
|
|
We need to see the location, configuration, and dimensions of the trash enclosure, contact Pam Williams ###-####
|
Routing - PLANNING Land Div | 7/17/2006 | | 7/20/2006 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/17/2006 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/17/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/17/2006 | | |
|
|
|
|
Application received | | | 7/12/2006 | | |
|
|
|
|
BLD-Final | 7/16/2008 | 7/16/2008 | | P | |
|
|
|
verified that all trades have been signed off _ Dave Hannah did a fn insp--per Bob Archibald do not need to print an Occ card..just note it in screen-mls
|