Permit Information
Permit NumberBLD06-01993
StatusFinaled
Name ENTRUST OF IDAHO
Site Address 10096 W FAIRVIEW AVE Unit: 160
Project NameFairview Office Park Bldg #3
Customer Number 
ePlanReviewNo
Description
(VP Development, Jay Story RCE-2327)(ENTRUST OF IDAHO)(FAIRVIEW OFFICE PARK BLDG #3 - STE 160) New 1,055 sq. ft. office tenant in a vacant portion of a 5,090 sq. ft. shell building that was done under BLD04-01644 per approved plans. Work to include completing the concrete slab on the interior of the space, new interior walls and doors, interior finish, a new suspended ceiling, counters/casework with sink, one new accessible restroom, new mechanical including a new HVAC rooftop unit and associated ducting, new plumbing, and new electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is not fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/8/20071/8/20071/30/2007 DONE
Second Notice has not been responded to.
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
First Notice 12/12/200612/27/2006 DONE
BLD-Final11/30/200612/1/200612/1/2006APASS
DetailsJim Sly
jay - please call for access ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
OK for Perm Occ.
FIRE-Final Inspection11/30/200612/1/200612/1/2006APASS
DetailsTroy Cobbley
Life safety finaled
Permanent occupancy  12/1/2006 DONE
Perm. Occ. Cert. # 11335 issued 12-1-06 to Entrust of Idaho.
BLD-Final11/29/200611/30/200611/30/2006PCANC
DetailsJim Sly
jay - note: call for access ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
FIRE-Final Inspection11/29/200611/30/200611/30/2006AFAIL
DetailsTroy Cobbley
Provide approved door hardware on the restroom door and fix the exit sign at the main exit.
BLD-Framing/Rough-in10/27/200610/27/200610/27/2006PPASS
DetailsJim Sly
Need a ceiling grid inspection. Code to lockbox is 2202. Thanks.; Phone #: ###-#### Internet Inspection Request from: Jay Story
BLD-Energy code compliance10/11/200610/11/200610/11/2006PPASS
DetailsMike Jordan
Enter off courtyard with combo of 2202. Thanks!; Phone #: ###-#### Internet Inspection Request from: Jay Story
BLD-Framing/Rough-in10/9/200610/10/200610/10/2006PPASS
DetailsMike Jordan
Main entrance is off courtyard. Combo is 2202 on lockbox. Thanks!; Phone #: ###-#### Internet Inspection Request from: Jay Story
CHANGE STATUS TO (ISS)  9/25/2006 DONE
picked up approved resubmittals and paid fee
(F) Reprint permit  9/25/2006 DONE
Routing - PLAN CHECK9/22/2006 9/22/2006 PASS
Resubmittals received for the project. The tenant space size has now been reduced and there are some minor layout changes. These have been reviewed and approved. A copy of plans to be picked up by applicant with a new job card to be taken out to the field. Another copy will be submitted to Records to replace the original plans.
Case Summary (BLD)  9/22/2006  
Print Occupancy Form  9/22/2006 DONE
Telephone call  9/22/2006 DONE
called Doug Simpson ###-####, told him resubmittals are ready and fee, also need to make sure these plans are taken on site along with new occupancy card.
Plan resubmittals received  9/21/2006  
Received 1 copy of cover transmittal, 2 copies of A-1, A-2 and 1 copy of A-3 with no signature or stamp and taken to Jason Blais///9/21/06 BAS
Plan resubmittals received  9/20/2006 DONE
Received 1 transmittal & 1 copy of sheet A-3 ( THIS PERMIT ISSUED 8-22-06 ) taken to Jason B.
Telephone call  9/12/2006 DONE
Called Doug Simpson of BRS Architects. This size of the tenant space has been reduced. Architect needs to verify the lighting and Lighting Compliance are per the IECC. Appears this may need to be adjusted. Doug said he would look into and submit updated sheets if changes are needed.
Plan resubmittals received  8/31/2006  
Received transmittal sheet, letter to Jason from Doug Simpson, and 3 copies of A-1 & A-2; taken to Jason Blais
Telephone call  8/22/2006 DONE
tlk to secretary ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  8/22/2006 DONE
Issue PAID IN FULL permit  8/22/2006 DONE
Routing - PLAN CHECK8/16/2006 8/21/2006 PASS
Plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  8/21/2006 PASS
Print Occupancy Form  8/21/2006 DONE
Print Occupancy Form  8/21/2006 DONE
Plan assigned to (JCB)8/11/2006 8/21/2006 PASS
8/21/2006 10:54:31 JCB - activity updated through activity BLDA022 from case BLD06-01993.
1st review completed  8/16/2006 PASS
Routing - FIRE8/12/2006 8/16/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK7/21/2006 8/12/2006 PEND
Plan review e-mailed to architect. No response required. A few minor items have been red-lined on plans. Plans to route to the Fire Dept. for review. When approved by the Fire Dept. the permit can be issued.
Plan assigned to (R_H)7/19/2006 8/11/2006  
Plan reassigned to Jason.
Routing - PUBLIC WORKS7/19/2006 7/21/2006 PASS
Application received  7/12/2006  
Recd Pcfee & Taken To Pln CK  7/12/2006 DONE
Plans ACCEPTED BY PLAN TECH  7/12/2006