Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01997
StatusExpired
Name SILVER SAGE CONSTRUCTION
Site Address 2244 E WALLING DR
Project NameFALLINGBROOK CONDOS
Customer Number 
ePlanReviewNo
Description
Building 5(E). Units 1 - 11 (2244-2264 E Walling Dr.). Silver Sage Construction RCE-1053. To construct a new 15,036 sq. ft. two story eleven unit apartment building. Each unit is two storys with three bedrooms and two and a half bathrooms and a 48 sq. ft. covered front porch. UNITS 1 has 1390 sq. ft. (565 sq. ft. first floor / 825 sq. ft. second floor) with a 413 sq. ft. double car garage. UNITS 2 - 10 have 1362 sq. ft. (565 sq. ft. first floor / 797 sq. ft. second floor) with a 250 sq. ft. single car garage and a 44 sq. ft. covered deck off the master bedroom. Unit 11has 1388 sq. ft. (574 sq. ft. first level / 814 sq. ft. second level) with a 413 sq. ft. double car garage. An NFPA 13R fire sprinkler system is required in each unit. NOTE: Each unit is over 800 sq. ft. Each unit is separated from adjacent unit by a 1-hour fire partition extending from the top of the foundation to tight against the bottom of the roof deck. All construction per the approved plans and approved plans and attached comment list. DRH03-124 and CUP03-00066 per Sarah Schafer with Planning and Zoning. (SAM)/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/31/2013 DONE
BLD-Final1/11/20101/11/20101/11/2010AFAIL
DetailsDave Hannah
DOC - Permit Expired1/11/20101/11/20101/11/2010PPASS
DetailsDave Hannah
no work done in the past 180 days
BLD-Aging Inspection6/7/20076/7/20076/11/2007 PASS
DetailsDave Hannah
Issue PAID IN FULL permit  3/8/2007 DONE
Print Occupancy Form  11/21/2006  
Telephone call  11/21/2006  
tlk to ron wager ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  11/21/2006 DONE
Routing - PLAN CHECK10/17/2006 11/20/2006 PASS
Certified copy of satisfaction of non-build agreement provided from Steve Remberg.To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  11/20/2006 PASS
Plan assigned to (DRS)9/22/2006 11/20/2006 PASS
11/20/2006 14:31:14 DRS - activity updated through activity BLDA022 from case BLD06-01997.
Routing - PLAN CHECK10/17/2006 10/17/2006 PEND
Inserted new "E" sheets and new water plan into original plans and re-routed back to plumbing code analyst for re-review.
Routing - PLUMBING10/17/2006 10/17/2006 PASS
see bld06-01992 for comments
Print Pending Permit.LaserJet4  10/17/2006  
Plan resubmittals received  10/16/2006  
Received 6 copies of sheets E-1, E-2, E-3 & water plan, received 2 copies of civil sheets 1of 5, 2 of 5, 3 of 5, 4 of 5, 5 of 5 and taken to Dan Stuart
Routing - PLAN CHECK10/4/2006 10/15/2006 PEND
Plan resubmittals for plumbing re-review are still outstanding. All other agencies have approved plans.
Routing - PLUMBING9/27/2006 10/4/2006 FAIL
no plans
Routing - PUBLIC WORKS9/26/2006 9/27/2006 PASS
Routing - PLAN CHECK9/21/2006 9/26/2006 ----
Routed back to Public Works.
Plan assigned to (SAM)7/17/2006 9/22/2006 DEFR
Reassigned to D. Stuart by MYS
Routing - PLANNING9/19/2006 9/21/2006 PASS
Sarah Schafer. After review send back to Plan Review.

Approved per DRH03-00124.
Plan resubmittals received  9/21/2006 DONE
Received transmittal letter, 1pg. response, 3pg. calculations, 4 copies of pg. S2.1; taken to Dan Stuart
Routing - PLAN CHECK8/29/2006 9/19/2006 HOLD
8/29/06-On hold waiting for resubmittals.
9/19/06-Sent to Planning for rereview.
Plan resubmittals received  9/18/2006  
Received copy of Plan Review Report and letter, 1pg. response, 2 copies of 1pg. floor plans, 4 copies of the following: A-0, A-1, A-6, A-14, A-15, A-16; taken to Sam Zahorka
1st review completed  8/29/2006 FAIL
Failed Public Works, Planning, Plumbing and Plan Check.
Routing - FIRE8/24/2006 8/29/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK8/3/2006 8/24/2006 FAIL
Routed to fire. Mailed letter to Architect.
Routing - PLANNING8/1/2006 8/3/2006 FAIL
CUP03-00066, DRH03-00124 Sarah Schafer
Need to work with the applicant and the public regarding fencing and landscape. A public worksession will be scheduled for this discussion.
Routing - PLUMBING7/25/2006 8/1/2006 FAIL
see bld06-01992 for review comments
Routing - Erosion and Sediment7/25/2006 7/25/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS7/20/2006 7/25/2006 FAIL
We need to see the location, configuration, and dimensions of the trash enclosure, contact Pam Williams ###-####
Routing - PLANNING Land Div7/17/2006 7/20/2006 PASS
Recd Pcfee & Taken To Pln CK  7/17/2006  
Plans ACCEPTED BY PLAN TECH  7/17/2006  
Plan routing begun/NEW & ADDTN  7/17/2006  
(F) Reprint permit  7/17/2006  
Application received  7/12/2006