Permit Information
Permit NumberBLD06-02010
StatusFinaled
Name T2 DEVELOPMENT LLC
Site Address 8512 W ELISA ST
Project NameVictory Business Park BLD C
Customer Number 
ePlanReviewNo
Description
Victory Business Park - Building "C" - 8528 W Elisa is the West side & 8512 W Elisa is the East side--To build a new 14,100 square foot, one story with mezzanine office and warehouse building and related site improvements. The total mezzanine area is 1560 square feet. This building is constructed of masonry exterior walls and wood framed interior and roof system. This building is divided down the middle with an 8 inch masonry wall create two identical tenant spaces that mirror each other. If there are no tenants at this time a separate MIS permit will be required for each tenant space to obtain occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD8/11/20088/11/20089/4/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice6/23/20086/23/20088/11/2008 DONE
DetailsMike Jordan
BLD-Final6/23/20086/23/20086/23/2008PPASS
DetailsMike Jordan
Keith Phone #: ###-####
DOC - Permit Finaled6/23/20086/23/20086/23/2008PPASS
DetailsMike Jordan
Letter of completion issued. Verified all other finals.
BLD-Conference6/23/20086/23/20086/23/2008APASS
DetailsMike Jordan
Will do final this afternoon.
FIRE-Final Inspection5/7/20085/7/20085/7/2008PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Conference4/10/20084/10/20084/10/2008PPASS
DetailsMike Jordan
Called and spoke with Keith of T2 developement about bldg. C. All finals are complete and partial from life safety. Kieth Noted that knox boxes have been installed. Kieth noted that he would call in for life/safety final and bldg. final by end of this week or start of next week.
FIRE-Final Inspection11/16/200711/19/200711/19/2007APART
DetailsTroy Cobbley
A temporary occupancy was given with dave hannimans permission until the knox key box, which is on back order, is received and installed.
FIRE-Final Inspection11/15/200711/16/200711/16/2007ACANC
DetailsTroy Cobbley
The fire alarm testing was canceled by the fire alarm contractor
FIRE-Final Inspection11/9/200711/13/200711/13/2007AFAIL
DetailsTroy Cobbley
Need the project related fire alarm and fire alarm permits finaled first. The emergency lights and exit signs tested ok.
FIRE-Conference11/8/200711/9/200711/9/2007ACANC
DetailsTroy Cobbley
To be rescheduled for tuesday since the fire alarm contractor could not make the 8:00am meeting time.
PubWorks Occupancy Approval9/20/20079/20/20079/20/2007 DONE
Code Occupancy Approval9/19/20079/19/20079/19/2007APASS
DetailsScott M.Brown
OK FOR FINAL
BLD-Energy code compliance7/11/20077/11/20077/11/2007PPASS
DetailsMike Jordan
BLD-Framing/Rough-in7/10/20077/11/20077/11/2007PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/10/2007 at 6:11:19 PM. Contact: ###-####.
BLD-Framing/Rough-in7/10/20077/10/20077/10/2007PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/10/2007 at 8:16:10 AM. Contact: ###-####.
FIRE-Conference6/27/20076/28/20076/29/2007APASS
DetailsTroy Cobbley
The outside front canopy has been filled with insulation.
BLD-Framing/Rough-in5/16/20075/17/20075/17/2007APASS
DetailsMike Jordan
KEITH; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. roof framing and diaphram only.
BLD-Footing5/8/20075/8/20075/8/2007PPASS
DetailsMike Jordan
keith; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Column pad footings for exterior canopy, south side.
BLD-Foundation3/12/20073/12/20073/12/2007PPASS
DetailsMike Jordan
brian; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. loading dock wall.
BLD-Foundation3/7/20073/8/20073/8/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/7/2007 at 8:30:33 PM. Contact: ###-####.
BLD-Footing3/5/20073/6/20073/6/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/5/2007 at 3:24:05 PM. Contact: ###-####. Exterior and interior footings. Will recieve special insp.
BLD-Footing3/2/20073/5/20073/5/2007ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/2/2007 at 10:56:56 AM. Contact: ###-####. Contractor to reschedule for tomorrow morning.
(F) Reprint permit  2/28/2007  
Inspection Record Card- Bld  2/27/2007 DONE
Case Summary (BLD)  2/27/2007 DONE
Issue PAID IN FULL permit  2/27/2007 DONE
Ready Permit EXTENDED  2/26/2007 DONE
One time permit application extension to July 9, 2007 (original date of expiration: January 9, 2007).
Inspection Record Card- Bld  9/20/2006 DONE
Permit Ready to Issue  9/20/2006 DONE
Routing - PLAN CHECK9/18/2006 9/19/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/19/2006 DONE
Plan assigned to (JCM)7/25/2006 9/19/2006 PASS
9/19/2006 08:56:04 JCM - activity updated through activity BLDA022 from case BLD06-02010.
Routing - PLAN CHECK9/15/2006 9/18/2006  
Routing - PLANNING9/18/2006 9/18/2006 PASS
Approved per DRH06-00084.
Routing - FIRE9/14/2006 9/15/2006 PASS
Attached updated review comments to plans.
Routing - PLANNING9/13/2006 9/14/2006 FAIL
Revised drawings needed. Please submit drawings to Design Review staff that show compliance with conditions of approval.
Routing - PUBLIC WORKS9/12/2006 9/13/2006 PASS
Plan Reviewer's activity  9/12/2006 PASS
Reviewed and approved structural and nonstructural plan resubmitals. JCM
Routing - PLAN CHECK8/15/2006 9/12/2006  
Plan resubmittals received  9/11/2006  
received "3" sheets of C1.1, C1.2, C1.3, C1.4, A-1, P2.11, P2.21, plans taken to john menard
Routing - FIRE8/10/2006 8/15/2006 FAIL
Faxed resubmittal items to architect. Attached review comments to plans.
1st review completed  8/15/2006 FAIL
Failed Structural, Planning, Public Works, Plan Check & Fire.
Plan resubmittals received  8/14/2006  
Received 1 copy of plan reveiw comments, 2 copies of C1.1, C1.2, A-1, A-2, A-3, A-4, A-5, A-7A-8, A-9, A-10, A-11, A-13, A.01, S0.2, S1.1, S1.2, S2.1, S3.1, S3.2, S3.3, S3.4, S4.1, --1 Copy of Pinnacle letter, 2 copies of structrual review comments, 2 copies of S0.1, S0.2, S1.1, S1.2, S2.1, S3.1, S3.2, S3.3, S3.4, S4.1 and taken to John Menard
Routing - PLAN CHECK8/9/2006 8/10/2006 FAIL
John Menard
Routing - PLANNING8/8/2006 8/9/2006 FAIL
DRH06-00084- Sara S Need revised copies of sheets A6 and A7 for the Design Review file as well as a copy of the shared parking agreement and the shared access/egress easement. Contacted the application on 8/9/06 with this request.
Routing - PLUMBING8/7/2006 8/8/2006 PASS
each tenant requires an isolation valve on the water supply. a clean out is required at the base of each soil or waste stack.
Routing Off Site - STRUCTURAL7/24/2006 8/8/2006 FAIL
Called Action Couriers for pick up - Received a faxed comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  8/8/2006 DONE
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - Erosion and Sediment8/3/2006 8/7/2006 PASS
ESC plan approved with attached conditions, Reference ESC06-01153 as master ESC plan for project.
Routing - PUBLIC WORKS7/28/2006 8/3/2006 FAIL
CONTACT JIM WYLLIE ###-####; TRASH REVISIONS REQUIRED CONTACT PAM WILLIAMS ###-####
Plan resubmittals requested  7/31/2006 DONE
Mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLANNING Land Div7/25/2006 7/28/2006 PASS
Plans ACCEPTED BY PLAN TECH  7/25/2006  
Plan routing begun/NEW & ADDTN  7/25/2006  
Recd Pcfee & Taken To Pln CK  7/13/2006  
Application received  7/13/2006