Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/4/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 6/23/2008 | 6/23/2008 | 8/11/2008 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 6/23/2008 | 6/23/2008 | 6/23/2008 | P | PASS |
Mike Jordan
|
|
|
Keith Phone #: ###-####
|
DOC - Permit Finaled | 6/23/2008 | 6/23/2008 | 6/23/2008 | P | PASS |
Mike Jordan
|
|
|
Letter of completion issued. Verified all other finals.
|
BLD-Conference | 6/23/2008 | 6/23/2008 | 6/23/2008 | A | PASS |
Mike Jordan
|
|
|
Will do final this afternoon.
|
FIRE-Final Inspection | 5/7/2008 | 5/7/2008 | 5/7/2008 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Conference | 4/10/2008 | 4/10/2008 | 4/10/2008 | P | PASS |
Mike Jordan
|
|
|
Called and spoke with Keith of T2 developement about bldg. C. All finals are complete and partial from life safety. Kieth Noted that knox boxes have been installed. Kieth noted that he would call in for life/safety final and bldg. final by end of this week or start of next week.
|
FIRE-Final Inspection | 11/16/2007 | 11/19/2007 | 11/19/2007 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave hannimans permission until the knox key box, which is on back order, is received and installed.
|
FIRE-Final Inspection | 11/15/2007 | 11/16/2007 | 11/16/2007 | A | CANC |
Troy Cobbley
|
|
|
The fire alarm testing was canceled by the fire alarm contractor
|
FIRE-Final Inspection | 11/9/2007 | 11/13/2007 | 11/13/2007 | A | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm and fire alarm permits finaled first. The emergency lights and exit signs tested ok.
|
FIRE-Conference | 11/8/2007 | 11/9/2007 | 11/9/2007 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled for tuesday since the fire alarm contractor could not make the 8:00am meeting time.
|
PubWorks Occupancy Approval | 9/20/2007 | 9/20/2007 | 9/20/2007 | | DONE |
|
|
|
|
Code Occupancy Approval | 9/19/2007 | 9/19/2007 | 9/19/2007 | A | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL
|
BLD-Energy code compliance | 7/11/2007 | 7/11/2007 | 7/11/2007 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 7/10/2007 | 7/11/2007 | 7/11/2007 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/10/2007 at 6:11:19 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/10/2007 | 7/10/2007 | 7/10/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/10/2007 at 8:16:10 AM. Contact: ###-####.
|
FIRE-Conference | 6/27/2007 | 6/28/2007 | 6/29/2007 | A | PASS |
Troy Cobbley
|
|
|
The outside front canopy has been filled with insulation.
|
BLD-Framing/Rough-in | 5/16/2007 | 5/17/2007 | 5/17/2007 | A | PASS |
Mike Jordan
|
|
|
KEITH; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. roof framing and diaphram only.
|
BLD-Footing | 5/8/2007 | 5/8/2007 | 5/8/2007 | P | PASS |
Mike Jordan
|
|
|
keith; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Column pad footings for exterior canopy, south side.
|
BLD-Foundation | 3/12/2007 | 3/12/2007 | 3/12/2007 | P | PASS |
Mike Jordan
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. loading dock wall.
|
BLD-Foundation | 3/7/2007 | 3/8/2007 | 3/8/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/7/2007 at 8:30:33 PM. Contact: ###-####.
|
BLD-Footing | 3/5/2007 | 3/6/2007 | 3/6/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/5/2007 at 3:24:05 PM. Contact: ###-####. Exterior and interior footings. Will recieve special insp.
|
BLD-Footing | 3/2/2007 | 3/5/2007 | 3/5/2007 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/2/2007 at 10:56:56 AM. Contact: ###-####. Contractor to reschedule for tomorrow morning.
|
(F) Reprint permit | | | 2/28/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/27/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/27/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/27/2007 | | DONE |
|
|
|
|
Ready Permit EXTENDED | | | 2/26/2007 | | DONE |
|
|
|
One time permit application extension to July 9, 2007 (original date of expiration: January 9, 2007).
|
Inspection Record Card- Bld | | | 9/20/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/20/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/18/2006 | | 9/19/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2006 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 7/25/2006 | | 9/19/2006 | | PASS |
|
|
|
9/19/2006 08:56:04 JCM - activity updated through activity BLDA022 from case BLD06-02010.
|
Routing - PLAN CHECK | 9/15/2006 | | 9/18/2006 | | |
|
|
|
|
Routing - PLANNING | 9/18/2006 | | 9/18/2006 | | PASS |
|
|
|
Approved per DRH06-00084.
|
Routing - FIRE | 9/14/2006 | | 9/15/2006 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLANNING | 9/13/2006 | | 9/14/2006 | | FAIL |
|
|
|
Revised drawings needed. Please submit drawings to Design Review staff that show compliance with conditions of approval.
|
Routing - PUBLIC WORKS | 9/12/2006 | | 9/13/2006 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 9/12/2006 | | PASS |
|
|
|
Reviewed and approved structural and nonstructural plan resubmitals. JCM
|
Routing - PLAN CHECK | 8/15/2006 | | 9/12/2006 | | |
|
|
|
|
Plan resubmittals received | | | 9/11/2006 | | |
|
|
|
received "3" sheets of C1.1, C1.2, C1.3, C1.4, A-1, P2.11, P2.21, plans taken to john menard
|
Routing - FIRE | 8/10/2006 | | 8/15/2006 | | FAIL |
|
|
|
Faxed resubmittal items to architect. Attached review comments to plans.
|
1st review completed | | | 8/15/2006 | | FAIL |
|
|
|
Failed Structural, Planning, Public Works, Plan Check & Fire.
|
Plan resubmittals received | | | 8/14/2006 | | |
|
|
|
Received 1 copy of plan reveiw comments, 2 copies of C1.1, C1.2, A-1, A-2, A-3, A-4, A-5, A-7A-8, A-9, A-10, A-11, A-13, A.01, S0.2, S1.1, S1.2, S2.1, S3.1, S3.2, S3.3, S3.4, S4.1, --1 Copy of Pinnacle letter, 2 copies of structrual review comments, 2 copies of S0.1, S0.2, S1.1, S1.2, S2.1, S3.1, S3.2, S3.3, S3.4, S4.1 and taken to John Menard
|
Routing - PLAN CHECK | 8/9/2006 | | 8/10/2006 | | FAIL |
|
|
|
John Menard
|
Routing - PLANNING | 8/8/2006 | | 8/9/2006 | | FAIL |
|
|
|
DRH06-00084- Sara S Need revised copies of sheets A6 and A7 for the Design Review file as well as a copy of the shared parking agreement and the shared access/egress easement. Contacted the application on 8/9/06 with this request.
|
Routing - PLUMBING | 8/7/2006 | | 8/8/2006 | | PASS |
|
|
|
each tenant requires an isolation valve on the water supply. a clean out is required at the base of each soil or waste stack.
|
Routing Off Site - STRUCTURAL | 7/24/2006 | | 8/8/2006 | | FAIL |
|
|
|
Called Action Couriers for pick up - Received a faxed comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 8/8/2006 | | DONE |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - Erosion and Sediment | 8/3/2006 | | 8/7/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions, Reference ESC06-01153 as master ESC plan for project.
|
Routing - PUBLIC WORKS | 7/28/2006 | | 8/3/2006 | | FAIL |
|
|
|
CONTACT JIM WYLLIE ###-####; TRASH REVISIONS REQUIRED CONTACT PAM WILLIAMS ###-####
|
Plan resubmittals requested | | | 7/31/2006 | | DONE |
|
|
|
Mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLANNING Land Div | 7/25/2006 | | 7/28/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/25/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/25/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/13/2006 | | |
|
|
|
|
Application received | | | 7/13/2006 | | |
|
|
|
|