Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-02011
StatusFinaled
Name T2 DEVELOPMENT LLC
Site Address 8540 W ELISA ST
Project NameVictory Business Park BLD A
Customer Number 
ePlanReviewNo
Description
Victory Business Park - Building "A" - (8556 & 8564 W Elisa St per addressing) To build a new 14,100 square foot, one story with mezzanine office and warehouse building and related site improvements. The total mezzanine area is 1560 square feet. This building is constructed of masonry exterior walls and wood framed interior and roof system. This building is divided down the middle with an 8 inch masonry wall create two identical tenant spaces that mirror each other. If there are no tenants at this time a separate MIS permit will be required for each tenant space to obtain occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD5/25/20075/25/200710/4/2007 DONE
Second Notice has not been responded to.
Telephone call  10/4/2007 DONE
lft vm with t2 deve ###-#### regarding no final values - please call back 10:20 am
Second Notice BLD5/9/20075/9/20075/25/2007 DONE
First Notice has not been responded to.
First Notice4/23/20074/23/20075/9/2007 DONE
DetailsMike Jordan
BLD-Final4/20/20074/23/20074/23/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/20/2007 at 3:40:32 PM. Contact: ###-####.
DOC - Permit Finaled4/23/20074/23/20074/23/2007PPASS
DetailsMike Jordan
Received copy of final aff. letter from special insp agency as well as a letter from engineer of record noting and accepting non conformances from special inspections. Letter of Compliance was issued for shell and core.
Case Summary (BLD)  4/23/2007  
Case Summary (BLD)  4/23/2007  
BLD-Final4/18/20074/19/20074/19/2007AFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/18/2007 at 2:22:58 PM. Contact: ###-####. Needs to resolve issues on final aff. with project engineer.
BLD-Final4/16/20074/17/20074/17/2007PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/16/2007 at 4:52:47 PM. Contact: ###-####.. Handrail mounted at wrong height. Needs to install hc sighn at restrooms.
FIRE-Final Inspection4/16/20074/17/20074/17/2007APASS
DetailsTroy Cobbley
life safety finaled
Code Occupancy Approval4/12/20074/12/20074/12/2007PPASS
DetailsScott M.Brown
OK FOR FINAL.
BLD-Energy code compliance2/15/20072/16/20072/16/2007APASS
DetailsMike Jordan
Framing ok. Energy ok. pending fire sprinkler ri insp.
BLD-Energy code compliance2/14/20072/15/20072/16/2007PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/14/2007 at 4:49:07 PM. Contact: ###-####.
BLD-Framing/Rough-in2/9/20072/12/20072/12/2007APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/9/2007 at 3:55:29 PM. Contact: ###-####. ok to insul. Needs to get fire sprinkler issues resolved.
BLD-Framing/Rough-in12/6/200612/7/200612/7/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/6/2006 at 2:40:43 PM. Contact: ###-####. Shear nailing on roof. ok to cover. Noted contractor had changed type of truss used. Approved engimeering from manufacturer on site. Noted to contractor to have changes made with structural engineer also.
BLD-Foundation10/2/200610/3/200610/3/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/2/2006 at 12:41:42 PM. Contact: ###-####. Perimeter stemwalls, loading dock walls, center stemwall.
BLD-Footing9/25/20069/27/20069/27/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/25/2006 at 3:14:39 PM. Contact: ###-####. Perimeter footings and footing down center of bldg.
BLD-Footing9/25/20069/26/20069/26/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/25/2006 at 1:09:11 PM. Contact: ###-####.
(F) Reprint permit  9/21/2006  
Inspection Record Card- Bld  9/20/2006 DONE
Issue PAID IN FULL permit  9/20/2006  
Per John Menard OK to issue Bldg. A only, gave plans to contractor./Per Brian Murphy ok not to pay PWK06-00206 until pick up Bldg. C
Routing - PLAN CHECK9/18/2006 9/19/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/19/2006 DONE
Plan assigned to (JCM)7/19/2006 9/19/2006 PASS
9/19/2006 08:56:56 JCM - activity updated through activity BLDA022 from case BLD06-02011.
Routing - PLAN CHECK9/15/2006 9/18/2006  
Routing - PLANNING9/18/2006 9/18/2006 PASS
Approved per DRH06-00084.
Routing - FIRE9/14/2006 9/15/2006 PASS
Attached updated review comments to plans.
Routing - PLANNING9/13/2006 9/14/2006 FAIL
Revised drawings needed. Please submit drawings to Design Review staff that show compliance with conditions of approval.
Routing - PUBLIC WORKS9/12/2006 9/13/2006 PASS
Plan Reviewer's activity  9/12/2006 PASS
Reviewed and approved structural and nonstructural plan resubmitals. JCM
Routing - PLAN CHECK8/15/2006 9/12/2006  
Plan resubmittals received  9/11/2006  
received "3" sheets of C1.1, C1.2, C1.3, C1.4, A-1, P2.11, P2.21, plans taken to john menard
Routing - FIRE8/10/2006 8/15/2006 FAIL
Faxed resubmittal items to architect. Attached review comments to plans.
1st review completed  8/15/2006 FAIL
Failed Structural, Planning, Public Works, Plan Check & Fire.
Plan resubmittals received  8/14/2006  
Received 1 copy of plan reveiw comments, 2 copies of C1.1, C1.2, A-1, A-2, A-3, A-4, A-5, A-7A-8, A-9, A-10, A-11, A-13, A.01, S0.2, S1.1, S1.2, S2.1, S3.1, S3.2, S3.3, S3.4, S4.1, --1 Copy of Pinnacle letter, 2 copies of structrual review comments, 2 copies of S0.1, S0.2, S1.1, S1.2, S2.1, S3.1, S3.2, S3.3, S3.4, S4.1 and taken to John Menard
Routing - PLAN CHECK8/9/2006 8/10/2006 FAIL
John Menard
Routing - PLANNING8/8/2006 8/9/2006 FAIL
DRH06-00084-Sara S Need revised copies of sheets A6 and A7 for the Design Review file as well as a copy of the shared parking agreement and the shared access/egress easement. Contacted the application on 8/9/06 with this request.
Routing - PLUMBING8/7/2006 8/8/2006 PASS
see bld06-02010 for review comments.
Routing Off Site - STRUCTURAL7/24/2006 8/8/2006 FAIL
Called Action Couriers for pick up - Received a faxed comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  8/8/2006 FAIL
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - Erosion and Sediment8/3/2006 8/7/2006 PASS
ESC plan approved with attached conditions, Reference ESC06-01153 as master ESC plan for project.
Routing - PUBLIC WORKS7/28/2006 8/3/2006 FAIL
CONTACT JIM WYLLIE ###-####; TRASH REVISIONS REQUIRED CONTACT PAM WILLIAMS ###-####
Plan resubmittals requested  7/31/2006 DONE
Mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLANNING Land Div7/25/2006 7/28/2006 PASS
Plans ACCEPTED BY PLAN TECH  7/25/2006  
Plan routing begun/NEW & ADDTN  7/25/2006  
Recd Pcfee & Taken To Pln CK  7/13/2006  
Application received  7/13/2006