(F) Reprint permit | | | 7/14/2008 | | DONE |
|
|
|
|
Second Notice BLD | 4/23/2008 | 4/23/2008 | 6/6/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/27/2008 | 4/23/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 3/27/2008 | | DONE |
|
|
|
|
Temporary occupancy | | | 11/3/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5469 issued 11-3-06 to Quizno's.
|
BLD-Final | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/1/2006 at 10:15:05 AM. OK for Temp occ. OK for perm occ when CDHD Perms
|
FIRE-Final Inspection | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | PASS |
Forrest France
|
|
|
Life safety inspection passed.
|
BLD-Final | 10/31/2006 | 11/1/2006 | 11/1/2006 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/31/2006 at 10:14:49 AM. Contact: ###-####.
|
FIRE-Final Inspection | 10/31/2006 | 10/31/2006 | 10/31/2006 | P | FAIL |
Forrest France
|
|
|
Need to lower the mounting height of the provided fire extinguishers to no higher than 48" AFF, provide a visual indicator at the main entry/exit door.
|
Print Occupancy Form | | | 10/25/2006 | | DONE |
|
|
|
|
BLD-Other | 10/23/2006 | 10/24/2006 | 10/24/2006 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/23/2006 at 3:34:47 PM. Contact: ###-####. Grid OK
|
BLD-Framing/Rough-in | 10/4/2006 | 10/5/2006 | 10/5/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/4/2006 at 1:17:24 PM. Contact: ###-####.
|
Inspector's copy Bld permit | | | 10/4/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/7/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/24/2006 | | DONE |
|
|
|
talked to becky whitaker in arlington tx at ###-#### to verify plans are ready
|
Permit Ready to Issue | | | 8/24/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/23/2006 | | DONE |
|
|
|
|
1st review completed | | | 8/22/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/22/2006 | | 8/22/2006 | | PASS |
|
|
|
Approved as noted on and attached plan review conditions of all reviewing agencies. To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2006 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 7/20/2006 | | 8/22/2006 | | PASS |
|
|
|
8/22/2006 14:54:34 DRS - activity updated through activity BLDA022 from case BLD06-02033.
|
Routing - FIRE | 8/18/2006 | | 8/22/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 7/25/2006 | | 8/18/2006 | | PEND |
|
|
|
No resubmittals required. Routing to fire code analyst for review.
|
Plan Reviewer's activity | | | 8/18/2006 | | DONE |
|
|
|
Copy of plan review comments faxed to architect of record for thier records.
|
Routing - PLUMBING | 7/21/2006 | | 7/25/2006 | | PASS |
|
|
|
pipe floor sink at 3-comp. sink to grease line per P-2. Note 7 page P1.0- dual check valves are not an approved device for cross connection control - use device approved for each type of equipment.
|
Routing - PUBLIC WORKS | 7/20/2006 | | 7/21/2006 | | PASS |
|
|
|
|
Application received | | | 7/14/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/14/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/14/2006 | | |
|
|
|
|
Third Notice BLD | 6/6/2008 | 6/6/2008 | | | |
|
|
|
Second Notice has not been responded to.
|