Third Notice | | 7/4/2010 | 8/3/2010 | | DONE |
|
|
|
Ok to sign off per Rita.
|
Second Notice | | 6/14/2010 | 6/29/2010 | | DONE |
|
|
|
|
First Notice | 6/1/2010 | 6/1/2010 | 6/4/2010 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 6/1/2010 | 6/1/2010 | 6/1/2010 | P | PASS |
Mike Jordan
|
|
|
call for access Inspection requested from web by: David Mortensen Phone #: ###-####
|
DOC - Permit Finaled | 6/1/2010 | 6/1/2010 | 6/1/2010 | P | PASS |
Mike Jordan
|
|
|
Certificate of compliance was issued. Expired Electrical and plumbing permits were attached to BLD07-02624. Spoke with trades inspectors, shell and core portion was inspected and ok.
|
FIRE-Final Inspection | 6/1/2010 | 6/1/2010 | 6/1/2010 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Zoning Approval | 6/1/2010 | 6/1/2010 | 6/1/2010 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 5/27/2010 | 5/28/2010 | 5/28/2010 | A | FAIL |
Troy Cobbley
|
|
|
Repair the two emergency lights and provide fire extinguishers with a current inspection tag.
|
BLD-Final | 5/27/2010 | 5/28/2010 | 5/28/2010 | A | NR |
Mike Jordan
|
|
|
Inspection requested from web by: David Mortensen
|
BLD-Grading Inspection | 5/27/2010 | 5/28/2010 | 5/28/2010 | A | CANC |
Mike Jordan
|
|
|
Inspection requested from web by: David Mortensen Phone #: ###-####
|
BLD-Aging Inspection | 5/17/2010 | 5/17/2010 | 5/18/2010 | | PASS |
Mike Jordan
|
|
|
Spoke with Marty, he noted that he has a tenant and is submitting ti plans to plan reveiw.
|
Case Summary (BLD) | | | 7/31/2009 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 9/2/2008 | 9/3/2008 | 9/3/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide the permanent address, provide sticker "door to remain unlocked when building is occupied" at the main exit, provide approved hardware on the remaining exterior exit doors and provided "issued" tenant improvement plans or the shell scope of work needs to be changed to reflect the revised interior wall layout.
|
BLD-Energy code compliance | 8/29/2008 | 8/29/2008 | 8/29/2008 | P | PASS |
Mike Jordan
|
|
|
marty Phone #: ###-####
|
BLD-Final | 1/15/2008 | 1/15/2008 | 1/15/2008 | P | CANC |
Mike Jordan
|
|
|
marty Phone #: ###-####
|
BLD-Energy code compliance | 1/15/2008 | 1/15/2008 | 1/15/2008 | P | PASS |
Mike Jordan
|
|
|
marty Phone #: ###-####. Shell and core framing only is ok. ok to insul exterior walls only.
|
BLD-Framing/Rough-in | 6/14/2007 | 6/14/2007 | 6/14/2007 | P | PART |
Mike Jordan
|
|
|
marty; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. Exterior shear nailing ok. Needs to provide non shrink grout under base platesof ts columns. Needs to have plans modified to show reflect the deletion of tenant demising wall. c/n posted.
|
BLD-Foundation | 3/7/2007 | 3/8/2007 | 3/8/2007 | A | PART |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. wip. repairs being made.
|
BLD-Foundation | 3/7/2007 | 3/7/2007 | 3/7/2007 | P | NR |
Mike Jordan
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Footing | 3/2/2007 | 3/5/2007 | 3/5/2007 | P | PART |
Mike Jordan
|
|
|
donnie ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. wip. Noted to contractor that special insp. is required.
|
(F) Reprint permit | | | 12/27/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/22/2006 | | |
|
|
|
|
Telephone call | | | 12/21/2006 | | |
|
|
|
tlk to chris laraway - ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Bld | | | 11/14/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/14/2006 | | DONE |
|
|
|
tlk to chris laraway - ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 11/14/2006 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/9/2006 | | 11/9/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLAN CHECK | 11/9/2006 | | 11/9/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2006 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 7/18/2006 | | 11/9/2006 | | PASS |
|
|
|
11/9/2006 13:27:50 JCM - activity updated through activity BLDA022 from case BLD06-02047.
|
Routing - PLAN CHECK | 11/6/2006 | | 11/8/2006 | | |
|
|
|
|
Plan resubmittals received | | | 11/8/2006 | | |
|
|
|
Received transmittal letter for Catherine Chertudi and 1pg. trash enclosure drawing, transmittal letter to Aimee Hughes, 1pg. letter to Aimee, 1pg. ESC plan review checklist, 2 copies of 2pg. ESC narrative, 2 copies of page SW.1; taken to John Menard
|
Routing - FIRE | 11/8/2006 | | 11/8/2006 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - FIRE | 11/2/2006 | | 11/6/2006 | | FAIL |
|
|
|
Faxed resubmittal item to architect.
|
Routing - PLANNING | 10/26/2006 | | 11/2/2006 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 10/25/2006 | | 10/26/2006 | | FAIL |
|
|
|
ESC plan failed. Does not meet BMC8-17 requirements. Faxed check list to PD.
|
Routing - PLUMBING | 10/24/2006 | | 10/25/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 10/23/2006 | | 10/24/2006 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 10/23/2006 | | PASS |
|
|
|
Plan resubmittals inserted into plans, reviewed and approved requested revisions. JCM
|
Routing - PLAN CHECK | 8/4/2006 | | 10/23/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/20/2006 | | |
|
|
|
Received cover transmital , copy of plumbing plan review, copy of public works response and 2 copies of sheet Sw.1 and taken to John Menard
|
Plan resubmittals received | | | 9/22/2006 | | |
|
|
|
Received 2 copies of the following--Cover transmittal letter for plan review response, EC.1, S1.1, A8.1, A6.1, A4.1, A2.1, SW.1 and taken to John Menard
|
Plan resubmittals received | | | 9/18/2006 | | |
|
|
|
Received 2 copies of 1pg. response, 2 copies of the following pages: A2.1, A4.1, A6.1, A8.1, S1.1, EC.1(not signed); taken to John Menard
|
Routing - FIRE | 7/31/2006 | | 8/4/2006 | | FAIL |
|
|
|
Faxed resubmittal item to the architect. Attached review comments to plans.
|
1st review completed | | | 8/4/2006 | | FAIL |
|
|
|
Failed fire, planning & plan check.
|
Routing - PLAN CHECK | 7/28/2006 | | 7/31/2006 | | FAIL |
|
|
|
John Menard
|
Routing - PLUMBING | 7/25/2006 | | 7/28/2006 | | FAIL |
|
|
|
IBC will require a mop sink, show location and resubmitt.
|
Routing - PLANNING | 7/28/2006 | | 7/28/2006 | | PASS |
|
|
|
DRH00-00073- Approved per DRH00-00073 Modification #2. Approval letter attached.
|
Routing - PUBLIC WORKS | 7/20/2006 | | 7/25/2006 | | FAIL |
|
|
|
No dimensions on trash enclosure, no dimensions showing width of approach, no detail showing that gates open 180°. Contact Pam Williams ###-####
|
Routing - Erosion and Sediment | 7/25/2006 | | 7/25/2006 | | FAIL |
|
|
|
Request for esc plan waiver denied. Informed applicant that a esc plan will be required.
|
Plan resubmittals requested | | | 7/25/2006 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLANNING Land Div | 7/18/2006 | | 7/20/2006 | | PASS |
|
|
|
Applicant must file amended condo plat and declarations prior to occupancy of the units.
|
Recd Pcfee & Taken To Pln CK | | | 7/18/2006 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/18/2006 | | |
|
|
|
|
Application received | | | 7/17/2006 | | |
|
|
|
|