BLD-Final | 3/22/2007 | 3/23/2007 | 3/23/2007 | A | PASS |
Tom Arcoraci
|
|
|
roy; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
Code Occupancy Approval | 3/22/2007 | 3/22/2007 | 3/22/2007 | A | PASS |
Dena Gambrel
|
|
|
Landscape and sidewalks installed.
|
CHANGE STATUS TO (ISS) | | | 1/24/2007 | | DONE |
|
|
|
|
Code Occupancy Approval Temp | 1/19/2007 | 1/19/2007 | 1/19/2007 | A | FAIL |
Dena Gambrel
|
|
|
1-19-07 Need to bond for Landscaping and fence ($4,782.80). Need to provide proof of bond with ACHD for sidewalk/curbs and/or other improvements that ACHD required.
|
Temporary occupancy | | | 12/26/2006 | | FAIL |
Wm. Michael Meloy
|
|
|
Inspection note that the landscaping plans did not comply with the DR. No paved access to buildings. Front or back.
|
BLD-Energy code compliance | 10/30/2006 | 10/31/2006 | 10/31/2006 | P | PASS |
Tom Arcoraci
|
|
|
roy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 10/26/2006 | 10/27/2006 | 10/27/2006 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/26/2006 at 3:32:10 PM. Contact: ###-####. cn posted
|
Issue PAID IN FULL permit | | | 9/19/2006 | | |
|
|
|
|
BLD-Foundation | 9/14/2006 | 9/15/2006 | 9/15/2006 | A | PASS |
Tom Arcoraci
|
|
|
adam - ###-####
|
BLD-Foundation | 9/12/2006 | 9/13/2006 | 9/14/2006 | A | PART |
Dave Hannah
|
|
|
adam - ###-####
|
Inspection Record Card- Bld | | | 9/14/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/14/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/14/2006 | | DONE |
|
|
|
spoke to scott@###-####/told permit was ready, lot & block, address, and fees
|
Plan assigned to (SRZ) | 9/13/2006 | 9/13/2006 | 9/13/2006 | | PASS |
|
|
|
9/13/2006 15:54:39 SRZ - activity updated through activity BLDA022 from case BLD06-02080.
|
Plan assigned to (SAM) | 7/19/2006 | 9/11/2006 | 9/13/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/22/2006 | | 9/13/2006 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 9/13/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2006 | | DONE |
|
|
|
|
BLD-Foundation | 9/8/2006 | 9/11/2006 | 9/11/2006 | P | NR |
Dave Hannah
|
|
|
###-#### - adam
|
BLD-Footing | 9/11/2006 | 9/11/2006 | 9/11/2006 | P | PASS |
Dave Hannah
|
|
|
###-#### - adam
|
BLD-Footing | 9/8/2006 | 9/8/2006 | 9/8/2006 | P | NR |
Dave Hannah
|
|
|
###-#### - adam
|
Early Start Permit | | | 9/5/2006 | | |
|
|
|
Early start approved per Steve M.//9/5/06 LEG
|
Routing - PUBLIC WORKS | 8/21/2006 | | 8/21/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 8/21/2006 | | 8/21/2006 | | PASS |
|
|
|
per new plans received and DRH06-00256
|
Routing - PLANNING | 7/19/2006 | | 7/21/2006 | | FAIL |
|
|
|
Appeal period must expire and plans conforming to DRH06-00256 must be submitted
|
Routing - Addressing | 7/19/2006 | | 7/19/2006 | | PASS |
|
|
|
|
Application received | | | 7/19/2006 | | |
|
|
|
|