BLD-Final | 5/8/2007 | 5/8/2007 | 5/8/2007 | P | DONE |
Tony Young
|
|
|
Phone #: ###-####
|
BLD-Final | 5/7/2007 | 5/8/2007 | 5/8/2007 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Tracey Greenlee
|
DOC - Permit Finaled | 5/8/2007 | 5/8/2007 | 5/8/2007 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Grading Inspection | 4/30/2007 | 4/30/2007 | 4/30/2007 | | BOND |
|
|
|
The rough grading and drainage has been completed at the above mentioned address. However, revegetation of the slope at the front of the lot and restoration of the lot to the south, including exposing the existing catch basin, have not been completed. For this a $500.00 bond is recommended. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Energy code compliance | 12/21/2006 | 12/21/2006 | 12/21/2006 | P | PASS |
Tony Young
|
|
|
jason - re-framing also ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 12/18/2006 | 12/18/2006 | 12/18/2006 | P | FAIL |
Tony Young
|
|
|
jason; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to insulate, c/n posted
|
BLD-Other | 12/13/2006 | 12/13/2006 | 12/13/2006 | P | PART |
Tony Young
|
|
|
jason - shear ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith exterior shear ok w/ staples
|
BLD-Other | 11/20/2006 | 11/20/2006 | 11/20/2006 | P | FAIL |
Tony Young
|
|
|
jason - note: shear wall ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith need to get ok for staples
|
BLD-Footing | 9/25/2006 | 9/26/2006 | 9/26/2006 | A | PASS |
Tony Young
|
|
|
cliff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PubWorks Subgrade Approval | 9/26/2006 | 9/26/2006 | 9/26/2006 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 9/21/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/8/2006 | | DONE |
|
|
|
spoke to tracy@###-####/told permit was ready, lot & block, address, and fees
|
Plan assigned to (SAM) | 8/29/2006 | | 9/7/2006 | | PASS |
|
|
|
9/7/2006 14:04:03 SAM - activity updated through activity BLDA022 from case BLD06-02087.
|
Plan Reviewer's activity | | | 9/7/2006 | | DONE |
|
|
|
9/7/06 7:40 I called and left a message for Bob with TRU Engineering to call me. I have questions on the calculations and bearing.
|
Case Summary (BLD) | | | 9/7/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/7/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | | | 9/7/2006 | | PASS |
|
|
|
|
Routing - FIRE | 8/16/2006 | | 8/17/2006 | | PASS |
|
|
|
No fire sprinklers required (Somerset Ridge #4)
|
Routing - Erosion and Sediment | 8/15/2006 | | 8/16/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 7/21/2006 | | 8/15/2006 | | PASS |
|
|
|
Routed to TR. Returned 8/14. 8 X 11 did not match the large site plan. requested new one. FAXed new site plan on 8/15. O.K.
|
Routing - PUBLIC WORKS GRADING | 8/14/2006 | | 8/14/2006 | | PASS |
|
|
|
Revised site plan submitted. Approved as Category 3
|
Routing - PUBLIC WORKS | 8/9/2006 | | 8/9/2006 | | PASS |
|
|
|
|
Routing - Addressing | 7/20/2006 | | 7/21/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 7/21/2006 | | 7/21/2006 | | FAIL |
|
|
|
Grading plan must be revised so that turnaround is not in front setback.
Met with Justin from Burgundy homes. 7/24/06
|
Application received | | | 7/20/2006 | | |
|
|
|
|