Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD06-02105
StatusExpired
Name AURORESKY DEVELOPMENT
Site Address 2577 S FIVE MILE RD
Project NameAURORESKY BLDG #6
Customer Number 
ePlanReviewNo
Description
(Auroresky Building #6 - Shell) To construct a new 2,980 square foot, one story with 940 square foot mechanical and storage basement , wood framed office shell building and related site improvements. This is a shell and core permit only and no occupancy is allowed under this permit. Separate tenant improvement permit are required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection11/24/201011/24/201011/24/2010 CANC
DetailsMike Jordan
DOC - Permit Expired11/24/201011/24/201011/24/2010PPASS
DetailsMike Jordan
Can not get a hold of owner to schedule final. Work appears to be completed.
FIRE-Final Inspection10/22/200710/22/200710/22/2007PPASS
DetailsTroy Cobbley
Life safety passed
Plan Reviewer's activity  10/11/2007 DONE
Revised permit to remove core work from the description, redlined plans and removed plan sheet that no longer apply. A letter was received from AuroreSky Development, dated October 9,2007, signed by Randal Callies, requesting that the finished restrooms and HVAC system work be deleted from the project. The letter indicates that this work will be done under the tenant improvement portion of the project. Sewer fees were collected for the restroom fixtures. JCM
BLD-Final10/10/200710/10/200710/10/2007ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/10/2007 at 7:25:15 AM.
FIRE-Final Inspection10/10/200710/10/200710/10/2007AFAIL
DetailsTroy Cobbley
Repair exit signs/emergency lights.
Inspection Record Card- Bld  10/10/2007 DONE
MISC ACTIONS  10/9/2007 DONE
Received letter addressed to and taken to John Menard
BLD-Other5/10/20075/10/20075/10/2007PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/10/2007 at 8:39:27 AM. Stair enclosure ok.
BLD-Other5/7/20075/8/20075/8/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/7/2007 at 5:31:44 PM. Contact: ###-####. Fireblocking complete. Blocking at one 1hr enclosure added. ok to cover.
BLD-Energy code compliance5/7/20075/7/20075/7/2007ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/7/2007 at 7:22:58 AM. Fireblocking not complete. Needs to install blocking at 1hr walls to maintain nailing pattern per approved assembly.
BLD-Energy code compliance5/2/20075/3/20075/3/2007APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/2/2007 at 12:58:15 PM. Needs to fireblock mech. enclosure, Provide additiuonal nailing on 5/8 typex behind duct work at 1hr enclosure. c/n posted, ok to rock.
BLD-Wall cover4/22/20074/23/20074/23/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/22/2007 at 3:13:30 P ok to insul.
BLD-Other4/17/20074/17/20074/17/2007PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/17/2007 at 7:43:00 AM.
(F) Reprint permit  3/8/2007 DONE
BLD-Foundation3/6/20073/7/20073/7/2007APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/6/2007 at 4:21:54 PM. Contact: ###-####.
OK Pending MTI special insp, tests, and approvals.
BLD-Framing/Rough-in2/27/20072/27/20072/27/2007PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/27/2007 at 8:49:27 AM.
BLD-Framing/Rough-in2/7/20072/8/20072/8/2007APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/7/2007 at 1:59:20 PM. shear nailing on exterior walls and roof ok. Also went over 1hr exit enclosure requirements.
BLD-Foundation2/6/20072/7/20072/7/2007APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/6/2007 at 6:19:48 PM. Contact: ###-####. Basementwall.
BLD-Footing2/6/20072/7/20072/7/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/6/2007 at 6:18:01 PM. Contact: ###-####.
BLD-Foundation1/31/20071/31/20071/31/2007PDEFR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/31/2007 at 8:28:54 AM. Contact: ###-####. Conc. already placed when on site. Special insp. was performed.
BLD-Footing1/25/20071/25/20071/25/2007PDEFR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/25/2007 at 8:32:41 AM. Contact: ###-####. Conc. placement completed when on site. Work had special insp.
BLD-Foundation1/16/20071/16/20071/16/2007PDEFR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/16/2007 at 8:25:33 AM. Contact: ###-####. special insp.
BLD-Footing1/11/20071/11/20071/11/2007PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/11/2007 at 9:34:33 AM. Contact: ###-####. Perimeter and interior footing. Will recievbe special insp.
BLD-Foundation1/5/20071/5/20071/5/2007PDEFR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/5/2007 at 7:31:48 AM. Contact: ###-####. Contractor had special insp. Placed conc. in am.
BLD-Footing12/27/200612/28/200612/28/2006ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/27/2006 at 2:14:21 PM. Contact: ###-####. No one on site, no access to approved plans, job trailer locked. No insp. performed. c/n posted.
BLD-Conference12/20/200612/20/200612/20/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/20/2006 at 10:01:32 AM. Contact: ###-####. Contractor has started on the first offfice bldg. Needs letter from engineer to delete special insp. requirements. Also noted to contractor that cold weather requirements willl be inforced for concrete const.
(F) Reprint permit  10/25/2006  
Issue PAID IN FULL permit  10/24/2006 DONE
Telephone call  8/25/2006 DONE
tlk to receptionist of Auroresky deve ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  8/25/2006 DONE
Plan assigned to (JCM)8/1/2006 8/24/2006 PASS
8/24/2006 13:07:56 JCM - activity updated through activity BLDA022 from case BLD06-02105.
Routing - PLAN CHECK8/21/2006 8/24/2006 PASS
Plan Reviewer's activity  8/24/2006 PASS
Reviewed and approved resubmitted plans for structural and nonstructural items w/ redlines and attached comment list. JCM
PLANS/APPL TAKEN TO FRONT DESK  8/24/2006 DONE
Inspection Record Card- Bld  8/24/2006 DONE
Plan resubmittals received  8/23/2006  
Received 1 copy of plan reveiw response from Insight Architects, 1 copy of plan review response letter from Pinnacle Engineers, 2 copies of structural calcs for Building #1, #4, #5, #6, 2 copies of the following sheets for Building #1--A0.1, A2.1, A2.2, A5.1, A5.2, A6.1, S2.1, S2.2, M1.0, 2 copies of the following sheets for building #4--A0.1, A2.1, A2.2, A5.1, A5.2, A6.1, S2.1, S2.2, M1.0, 2 copies of the following sheets for building #5--A0.1, A2.1, A2.2, A5.1, A5.2, A6.1, S2.1, S2.2, M1.0, 2 copies of the following sheets for building #6--A0.1, A2.1, A2.2, A5.1, A5.2, A6.1, S2.1, S2.2, M1.0 and taken to John Menard
Routing - FIRE8/16/2006 8/21/2006 PASS
Attached review comments to plans
1st review completed  8/21/2006 FAIL
Failed plan check.
Routing - PLAN CHECK8/11/2006 8/16/2006 FAIL
John Menard
Plan resubmittals requested  8/16/2006 DONE
E-mailed the achitect a copy of the plan review requesting revisions. JCM
Routing - PLANNING8/10/2006 8/11/2006 PASS
DRH05-00227-Sarah S Approved per DRH06-00227
Routing - PLUMBING8/9/2006 8/10/2006 PASS
per plans and 2003 upc
Routing - PUBLIC WORKS8/7/2006 8/9/2006 PASS
Routing - Erosion and Sediment8/9/2006 8/9/2006 PASS
ESC plan approved with attached conditions.
Routing - PLANNING Land Div8/1/2006 8/7/2006 PASS
Individual units may not be sold until a condominium plat is recorded at the Ada County Recorders Office.
Plan routing begun/NEW & ADDTN  8/1/2006  
Recd Pcfee & Taken To Pln CK  7/31/2006 DONE
Plans ACCEPTED BY PLAN TECH  7/31/2006  
Application received  7/21/2006