Third Notice BLD | 1/8/2007 | 1/8/2007 | 4/9/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/8/2006 | 12/27/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 12/8/2006 | | |
|
|
|
|
Permanent occupancy | | | 12/8/2006 | | DONE |
|
|
|
Perm. Occ. Cert. $# 11352 issued 12-8-06 to the Cheesecake Factory.
|
BLD-Final | 12/5/2006 | 12/5/2006 | 12/5/2006 | P | PASS |
Mike Jordan
|
|
|
neal; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Ok for perm occ.
|
Code Occupancy Approval | | | 12/5/2006 | | PASS |
|
|
|
landscape in, final signed off and release of bond.
|
BLD-Final | 11/24/2006 | 11/24/2006 | 11/24/2006 | P | PASS |
Jim Storey
|
|
|
NEIL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles temp ok pending all others
|
FIRE-Final Inspection | 11/24/2006 | 11/24/2006 | 11/24/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 11/22/2006 | 11/22/2006 | 11/24/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
Temporary occupancy | | | 11/24/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5479 issued 11-24-06 to the Cheesecake Factory at Boise Towne Square.
|
Code Occupancy Approval Temp | 11/21/2006 | 11/21/2006 | 11/21/2006 | P | DONE |
Scott M.Brown
|
|
|
NEEDS TO BOND FOR LANDSCAPE $33,000
|
FIRE-Conference | 11/16/2006 | 11/17/2006 | 11/17/2006 | A | PASS |
Troy Cobbley
|
|
|
Went over maximum occupant load signs and their location with the general contractor.
|
BLD-Other | 11/16/2006 | 11/16/2006 | 11/16/2006 | P | PASS |
Mike Jordan
|
|
|
neil Note: suspended ceiling t-Bars ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 11/3/2006 | 11/3/2006 | 11/3/2006 | P | PART |
Mike Jordan
|
|
|
neil - note: suspended ceiling ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. grid in back work areas only. pending other trades insp.
|
FIRE-Conference | 10/25/2006 | 10/26/2006 | 10/26/2006 | A | DONE |
Troy Cobbley
|
|
|
Discussed pull station placement for the hood systems. Where they want to place them does not meet code
|
BLD-Framing/Rough-in | 10/24/2006 | 10/24/2006 | 10/24/2006 | P | CANC |
Mike Jordan
|
|
|
neil ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 10/23/2006 | 10/23/2006 | 10/23/2006 | P | PASS |
Mike Jordan
|
|
|
neil ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Interior framed walls.
|
BLD-Energy code compliance | 10/23/2006 | 10/23/2006 | 10/23/2006 | P | PASS |
Mike Jordan
|
|
|
neil ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 10/19/2006 | 10/19/2006 | 10/20/2006 | P | PART |
Mike Jordan
|
|
|
neil; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Ok to rock Walls at existing cmu walls. Ok rock sides on walls at ceiling, will leave soffitt open.
|
BLD-Framing/Rough-in | 10/17/2006 | 10/17/2006 | 10/17/2006 | P | PART |
Mike Jordan
|
|
|
neil; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. ok to rock soffitt at service counter. May one interior walls.
|
BLD-Framing/Rough-in | 10/12/2006 | 10/13/2006 | 10/13/2006 | A | CANC |
Mike Jordan
|
|
|
john - note: insulation also - early as possible ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 10/11/2006 | 10/13/2006 | 10/13/2006 | A | CANC |
Mike Jordan
|
|
|
nell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Energy code compliance | 10/13/2006 | 10/13/2006 | 10/13/2006 | A | PART |
Mike Jordan
|
|
|
john - note: insulation also - early as possible ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. East wall behind cooler, north wall at existing cmu wall. Upper portions of east wall and at octagon.
|
BLD-Framing/Rough-in | 10/12/2006 | 10/12/2006 | 10/12/2006 | P | PASS |
Mike Jordan
|
|
|
neal; Phone #: ###-#### Internet Inspection Request from: Patricia Smith All clips were added, ok to insul.
|
BLD-Framing/Rough-in | 10/11/2006 | 10/12/2006 | 10/12/2006 | A | PART |
Mike Jordan
|
|
|
nell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. South wall ok, east wall, all clips not installed per plan at upper elev. Will remove insul and sheet rock to install clips. Needs to remove sheetrock from westwall to verify clips.
|
BLD-Energy code compliance | 10/12/2006 | 10/12/2006 | 10/12/2006 | A | PART |
Mike Jordan
|
|
|
nell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. South demissing wall at existing block wall. ok to cover.
|
BLD-Framing/Rough-in | 10/3/2006 | 10/4/2006 | 10/4/2006 | A | PART |
Mike Jordan
|
|
|
NEIL; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Exterior steel stud framing at east wall, upper tower and lower tower. Contractor to get rfi for sub of fillet welds to hilti shot pins at angle to bent plate connections.
|
BLD-Footing | 9/28/2006 | 9/29/2006 | 9/29/2006 | P | PART |
Mike Jordan
|
|
|
neal; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Perimeter footings and grade beams. wip. Wiil have special insp.
|
BLD-Footing | 9/15/2006 | 9/15/2006 | 9/15/2006 | P | PART |
Mike Jordan
|
|
|
neil ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Interior column pad footings.
|
Issue PAID IN FULL permit | | | 8/31/2006 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 8/8/2006 | | 8/30/2006 | | PASS |
|
|
|
8/30/2006 10:21:51 MLO - activity updated through activity BLDA022 from case BLD06-02108.
|
Routing Off Site - STRUCTURAL | 8/24/2006 | | 8/30/2006 | | PASS |
|
|
|
Called Action Couriers for pick up
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/30/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/30/2006 | | DONE |
|
|
|
left mess for douglas middleton at ###-#### ext 111 that permit is ready & need achd approval before picking up
|
1st review completed | | | 8/29/2006 | | DONE |
|
|
|
|
Routing - PLUMBING | 8/29/2006 | | 8/29/2006 | | PASS |
|
|
|
cross connection control per awwa cross connection control manual.
|
Routing - Erosion and Sediment | 8/29/2006 | | 8/29/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLAN CHECK | 8/29/2006 | | 8/29/2006 | | PASS |
|
|
|
|
Routing - FIRE | 8/23/2006 | | 8/29/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Plan resubmittals received | | | 8/24/2006 | | DONE |
|
|
|
Received 1 project start up special inspections,1 response,1 transmittal,1 review report, 1 memo GLP Engeering inc,4 copys of sheets E-4,E-12,TS,A2.1,A6.0,A6.1,A8.0,A8.5,ID-0.0,ID-0.1,ID-1.1,ID-2.1,ID-3.1,ID-3.2,ID-4.1,ID-4.2,ID-4.3,ID-4.4,ID-4.5,ID-4.6,ID-5.1,ID-5.2.0,ID-5.2.1,ID-5.3,ID-5.4,ID-6.1,ID-6.2.0,ID-6.2.1,ID-6.2.3,ID-6.2.4,ID-6.3,ID-6.4 taken to Mike Otto
|
Plan resubmittals requested | | | 8/23/2006 | | DONE |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 8/9/2006 | | 8/23/2006 | | FAIL |
|
|
|
corrections sent to architect. Note fax failed, corrections mailed. MLO
|
Plan resubmittals received | | | 8/22/2006 | | |
|
|
|
Received 1 copy of response letter, 3 copies of Structural calcs, 4 copies of S1.1 & S3 and taken to Mike Otto's desk
|
Plan resubmittals requested | | | 8/21/2006 | | DONE |
|
|
|
Faxed the applicant a copy of the second structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 8/11/2006 | | 8/18/2006 | | FAIL |
|
|
|
Sent revised structural to outside engineer for review.
|
Plan resubmittals received | | | 8/17/2006 | | |
|
|
|
received transmittal sheet from CSHQA & "4" sheets of A1.0-plans taken to marlene southard
|
Plan resubmittals received | | | 8/16/2006 | | FAIL |
|
|
|
received 4 copies of sheet A1.0 and taken to Marlene///Given back to Cathy with CSHQA as they were not dimensioned as requested by Marlene///8/16/06 @ 11:30am BAS
|
Telephone call | | | 8/16/2006 | | DONE |
|
|
|
Spoke with Craig Oka and faxed him information on what we require for a dimensioned site plan. Included a copy of the Record of Survey 7234 in the fax transmittal so he would have parcel line dimensions. He is preparing dimensioned site plans and will submit. (Marlene S.)
|
Plan resubmittals received | | | 8/11/2006 | | |
|
|
|
Received 1 copy of Review comments, 3 copies of revised calculations, 4 copies of sheet S1, S3, S7 and taken to Marlene
|
Plan resubmittals received | | | 8/10/2006 | | DONE |
|
|
|
Received 1 revision/change/comment & 4 copys of sheets P-1,P-2,P-3,P-4,P-5,P-6,P-7,P-8,P-9 taken to Mike Otto /care of Marlene S.
|
Plan resubmittals requested | | | 8/10/2006 | | DONE |
|
|
|
Faxed the applicant a copy of the comment list from the consulting structural engineer. JCM
|
Routing Off Site - STRUCTURAL | 7/24/2006 | | 8/10/2006 | | FAIL |
|
|
|
Called Action Courier 7/24/06 @ 3:10 for pick in the morning
|
Routing - PLANNING | 8/2/2006 | | 8/3/2006 | | PASS |
|
|
|
Approved per DRH04-00219 MOD #2--Greg Johnson
|
Routing - PLUMBING | 7/26/2006 | | 8/2/2006 | | FAIL |
|
|
|
(1)provide loading on existing 4" sewer. (2) pipe floor sinks to the conventionally vented waste line under the assembly area and vent to the wall behind the cook line, the floor sinks under the beverage area are ok on a combination waste and vent system. (3)an R.P. backflow preventor will be required upstream of any filter racks. (4) additional cross connection protection may be required. address items #1 and #2 and resubmit.
|
Routing - PUBLIC WORKS | 7/25/2006 | | 7/26/2006 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 7/26/2006 | | 7/26/2006 | | FAIL |
|
|
|
RP not certified; Informed contact with CSHQA--Cathy Duchek.
|
Plan resubmittals received | | | 7/26/2006 | | |
|
|
|
Received 2 copies of HVAC load calcs, 3 copies of structural calcs, 4 copies of sheets AC-1, AC-2, AC-3, AC-4AC-5, E-11, S1, S1.1, S2, S3, S4, S5, S6, S7, S8 and taken to John Menard
|
Routing - PLANNING Land Div | 7/24/2006 | | 7/25/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/24/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/24/2006 | | |
|
|
|
|
Application received | | | 7/21/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 7/21/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/21/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 7/21/2006 | | |
|
|
|
|