Permit Information
Permit NumberBLD06-02135
StatusFinaled
Name JMR CONTRACTING
Site Address 951 E RUBICON DR
Project Name4486 S FEDERAL WAY
Customer Number 
ePlanReviewNo
Description
Promontory Ridge Neighborhood Community Center - To construct a new 1,300 square foot, one story, wood framed neighborhood community center and related site improvements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/5/2011  
Case Summary (BLD)  12/5/2011  
Meeting  2/27/2009 DONE
Details
no final cert of value ever received - signed off per RAD
Third Notice BLD10/1/200710/1/200710/30/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD9/13/20079/13/200710/1/2007 DONE
First Notice has not been responded to.
First Notice 8/22/20079/13/2007 DONE
Permanent Occupancy  8/22/2007 DONE
BLD-Final8/13/20078/13/20078/13/2007PPASS
DetailsJim Storey
joe Phone #: ###-#### final ok
BLD-Final7/18/20077/19/20077/19/2007AFAIL
DetailsJim Storey
jedd; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang c/n on site.
PubWorks Occupancy Approval7/19/20077/19/20077/19/2007 DONE
Received engineer required letter 07/18/07.
BLD-Final6/29/20076/29/20076/29/2007PNR
DetailsJim Sly
Jill Note: please call prior to inspection - he wants to see in person Phone #: ###-####
Mike had Temp glazing on corr notice, .......But noticed that ACHD and Public Works had not signed off yet......Called Contr and notified.
BLD-Final6/28/20076/28/20076/28/2007PPART
DetailsMike Jordan
joe; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. ok for temp occ. Needs to provide safety glazing at window by back door.
FIRE-Final Inspection6/28/20076/28/20076/28/2007PPASS
DetailsForrest France
Corrections complete, noted signage above the main entry/exit "door to remain unlocked while building is occupied" to be installed prior to structural final, per contractor this is to be done today.
BLD-Final6/22/20076/25/20076/25/2007ACANC
DetailsJim Storey
joe; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
FIRE-Final Inspection6/25/20076/25/20076/25/2007PFAIL
DetailsForrest France
Provide approved hardware at the marked exits-manual thumbturns are not allowed, lower the provided fire extinguisher to 48" max AFF, provide approved hardware at both restroom doors, noted no city stamped plans or plan review notes on site.
FIRE-Final Inspection6/22/20076/22/20076/22/2007PFAIL
DetailsForrest France
Missing the required fire extinguisher.
BLD-Final6/14/20076/14/20076/14/2007PNR
DetailsJim Storey
joe; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Aging Inspection6/1/20076/1/20076/1/2007 NR
DetailsJim Storey
pending other trades and bld final.
BLD-Aging Inspection1/5/20071/5/20071/5/2007 PASS
DetailsJim Storey
BLD-Framing/Rough-in11/1/200611/1/200611/1/2006PPASS
DetailsJim Storey
joe ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith c/n made ok by engineering/ insulation ok.
BLD-Framing/Rough-in10/23/200610/24/200610/24/2006APART
DetailsJim Storey
10:00 appointment w/301 ok to insulate front hip ridge reverced and need engineering to justfy drag strut.
BLD-Framing/Rough-in10/23/200610/23/200610/23/2006PDEFR
DetailsJim Storey
joe - note: call 1/2 hr prior to going out ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith tue. 10:00 apointment
BLD-Foundation8/25/20068/28/20068/28/2006APASS
DetailsJim Sly
evans; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing8/24/20068/25/20068/25/2006APASS
DetailsJim Storey
cal - late morning; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
(F) Reprint permit  8/24/2006  
Issue PAID IN FULL permit  8/23/2006  
Telephone call  8/22/2006 DONE
tlk to wes edwards ###-#### that permit and fees are ready to be picked up but needs ACHD- Wes said that ACHD said that they dont pay for fees but will check on it
Permit Ready to Issue  8/22/2006 DONE
Plan assigned to (JCM)7/26/2006 8/21/2006 PASS
8/21/2006 10:03:42 JCM - activity updated through activity BLDA022 from case BLD06-02135.
Routing - PLAN CHECK8/17/2006 8/21/2006 PASS
Plan Reviewer's activity  8/21/2006 PASS
Reviewed and approved resubmiited plan sheets. JCM
PLANS/APPL TAKEN TO FRONT DESK  8/21/2006 DONE
Print Occupancy Form  8/21/2006 DONE
Routing - FIRE8/14/2006 8/17/2006 PASS
Attached review comments to plans.
1st review completed  8/17/2006 FAIL
Failed plan check.
Plan resubmittals received  8/15/2006  
Received 1 pg. response, 3 copies of Envelope Compliance Certificate, 3 copies of pg. A5.1; taken to John Menard
Routing - PLAN CHECK8/8/2006 8/14/2006 FAIL
John M.
Plan resubmittals requested  8/14/2006 DONE
E-mailed the arhcitect a copy of the plan review requesting revisions. JCM
Routing - PLANNING8/7/2006 8/8/2006 PASS
Plans redlined to include a 4-foot asphalt or concrete pathway that was required as a part of CUP04-00077 and DRH06-00125.
Routing - PLUMBING8/7/2006 8/7/2006 PASS
plumbing plan shows an 1 1/4" water service, civil shows a 3/4", install per plumbing plans. if sewer service is to be relocated to existing stub, resubmit prior to final inspection.
Routing - Erosion and Sediment8/4/2006 8/7/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS7/28/2006 8/4/2006 PASS
Routing - PLANNING Land Div7/26/2006 7/28/2006 PASS
Plans ACCEPTED BY PLAN TECH  7/26/2006  
Plan routing begun/NEW & ADDTN  7/26/2006  
Application received  7/25/2006