BLD-Final | 4/22/2008 | 4/22/2008 | 4/22/2008 | P | PASS |
Mike Jordan
|
|
|
david - please call for access Phone #: ###-####.
|
DOC - Permit Finaled | 4/22/2008 | 4/22/2008 | 4/22/2008 | P | PASS |
Mike Jordan
|
|
|
Letter of compliance issued. All issues resolved.
|
FIRE-Final Inspection | 4/21/2008 | 4/22/2008 | 4/22/2008 | A | DEFR |
Forrest France
|
|
|
Wrong inspection type called in, was intended for a structural final. Noted no fire inspection signatures are required per project details, notified contact by phone to reschedule as discussed.
|
BLD-Final | 1/10/2008 | 1/10/2008 | 1/10/2008 | P | FAIL |
Mike Jordan
|
|
|
corey - please call for access Phone #: ###-####. Provide adress. A guardail is required around driveway were grade below exceeds 30". Provide code compliant ramp or stairway at door to underfloor space.
|
BLD-Energy code compliance | 7/3/2007 | 7/3/2007 | 7/3/2007 | P | PASS |
Dave Hannah
|
|
|
david Phone #: ###-####
|
BLD-Energy code compliance | 7/2/2007 | 7/3/2007 | 7/3/2007 | A | NR |
Dave Hannah
|
|
|
david Phone #: ###-####
|
BLD-Framing/Rough-in | 6/29/2007 | 7/2/2007 | 7/2/2007 | A | DONE |
Dave Hannah
|
|
|
david Phone #: ###-####
|
BLD-Framing/Rough-in | 6/26/2007 | 6/26/2007 | 6/26/2007 | P | PASS |
Jim Storey
|
|
|
ian Phone #: ###-####
|
BLD-Other | 1/29/2007 | 1/30/2007 | 1/30/2007 | A | PASS |
Dave Hannah
|
|
|
logan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Foundation | 1/26/2007 | 1/26/2007 | 1/26/2007 | P | PASS |
Dave Hannah
|
|
|
logan; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Footing | 1/25/2007 | 1/25/2007 | 1/25/2007 | P | PART |
Dave Hannah
|
|
|
logan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Foundation | 12/22/2006 | 12/27/2006 | 12/27/2006 | A | PART |
Jim Storey
|
|
|
Logan; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
|
BLD-Other | 12/20/2006 | 12/20/2006 | 12/20/2006 | P | CANC |
Dave Hannah
|
|
|
logan - stem wall ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Other | 12/14/2006 | 12/15/2006 | 12/15/2006 | A | FAIL |
Dave Hannah
|
|
|
logan - stem wall ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith high wall not per plan need engineering
|
BLD-Other | 12/13/2006 | 12/14/2006 | 12/14/2006 | A | CANC |
Dave Hannah
|
|
|
logan - stem wall ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Foundation | 12/6/2006 | 12/6/2006 | 12/6/2006 | P | PART |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Perimeter and interior footings. wip. Noted no entry on permit stating that hillside ordinance applied.
|
Case Summary (BLD) | | | 11/30/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/9/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/27/2006 | | 8/7/2006 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 8/7/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/7/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/7/2006 | | DONE |
|
|
|
spoke to david@###-####/told permit was ready, permit#, address, lot & block, and fees
|
Permit Ready to Issue | | | 8/7/2006 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 7/25/2006 | 7/25/2006 | 7/31/2006 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 7/26/2006 | | 7/27/2006 | | PASS |
|
|
|
|
Routing - Addressing | 7/25/2006 | | 7/26/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 7/26/2006 | | 7/26/2006 | | PASS |
|
|
|
|
Application received | | | 7/25/2006 | | |
|
|
|
|
Pending Assignment by DJO | 7/31/2006 | | | | |
|
|
|
|