(BOISE SAMARITAN VILLAGE) To remodel a portion of building known as "Building H" by modifing the nurses station and medical storage room per approved plans. Work to include, installation of two new openings in an existing CMU wall per engineering, new nurse station counters, new partition infill, installation of 20 minute rated doors and 45 minute rated window assemblies in an existing corridor that is to be maintained, installation of new accessible roll in shower, Miscellaneous related interior finishes. This building is fully fire sprinklered any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. (RMH)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (FNL)  9/11/2009 DONE
BLD-Final7/21/20097/21/20097/21/2009PPASS
DetailsTony Young
Dan--Please call at least one hour prior so he can meet ya there Phone #: ###-####
l o c issued
BLD-Final7/20/20097/21/20097/21/2009ACANC
DetailsTony Young
Dan--Please call at least one hour prior so he can meet ya there Phone #: ###-####
canc till pm
FIRE-Final Inspection7/20/20097/20/20097/20/2009PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Conference6/22/20096/22/20096/23/2009PPASS
DetailsTroy Cobbley
Jackie and I discussed getting this permit closed out. She is to follow up.
FIRE-Conference5/19/20095/20/20095/20/2009PDONE
DetailsTroy Cobbley
I spoke to Brian with CM Company and he stated that he would follow up on the status.
BLD-Other3/8/20073/8/20073/8/2007PPART
DetailsTony Young
Dan ceiling; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
ok pending trades, elec, sprinkler
BLD-Conference2/26/20072/26/20072/26/2007PPART
DetailsTony Young
dan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
conf. on location/height of overhead light fixture,, ok as installed
BLD-Framing/Rough-in2/15/20072/16/20072/16/2007APART
DetailsTony Young
DAN; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
pending trades,, ok to cover nurse station
BLD-Conference2/5/20072/5/20072/5/2007PPASS
DetailsTony Young
rob Note: please call 1/2 hr prior; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
sheet rock lid and wall backside in chaplins/ nurse station area
BLD-Framing/Rough-in1/11/20071/11/20071/11/2007PPART
DetailsTony Young
rob; Phone #: ###-#### Note: please call 40 min prior to inspection Internet Inspection Request from: Cathy Chiles
chaplins office ok
BLD-Framing/Rough-in12/21/200612/21/200612/21/2006PPART
DetailsTony Young
rob - please call 45 min. prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
ok to cover bathroom pending trades
BLD-Conference11/20/200611/21/200611/21/2006APART
DetailsTony Young
rob - please call 45 min. prior to conference ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
conf on room remodel,, if joists are bearing over a wall they removed,, told them to investigate and let me know,, if it is then get a fix from architect and I can look at it then.
Issue PAID IN FULL permit  10/23/2006 DONE
Inspection Record Card- Bld  10/18/2006 DONE
Telephone call  10/18/2006 DONE
lft ms with secretary ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  10/18/2006 DONE
Routing - PLAN CHECK9/12/2006 10/17/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/17/2006 DONE
Inspection Record Card- Bld  10/17/2006 DONE
Plan assigned to (R_H)7/31/2006 10/17/2006 PASS
10/17/2006 14:43:46 RMH - activity updated through activity BLDA022 from case BLD06-02169.
Plan resubmittals received  10/11/2006  
Received transmittal sheet, 1pg. response letter, 3 copies of page A2.2; taken to Ron Hill
1st review completed  9/12/2006 FAIL
Failed Plan Check.
Routing - FIRE9/8/2006 9/12/2006 PASS
Attached review comments to plans.
Case Summary (BLD)  9/8/2006 DONE
Routing - PLAN CHECK7/31/2006 9/8/2006 PASS
Faxed and mailed requirements to the architect, routed plans to fire on 9/8/06
Plan resubmittals received  8/8/2006  
Received 1 copy of cover transmittal, 2 copies of structure calcs and taken to Ron Hill
Recd Pcfee & Taken To Pln CK  7/28/2006 DONE
Per Ron Hill ok to accept plans.
Plans ACCEPTED BY PLAN TECH  7/28/2006  
Application received  7/26/2006