Second Notice BLD | 3/8/2007 | 3/8/2007 | 3/19/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/23/2007 | 3/8/2007 | | DONE |
|
|
|
|
BLD-Final | 2/22/2007 | 2/23/2007 | 2/23/2007 | A | PASS |
Dave Hannah
|
|
|
gordon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for perm occ
|
Permanent Occupancy | | 2/23/2007 | 2/23/2007 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 2/23/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11450 issued 2-23-07 to the Statehouse Inn.
|
BLD-Final | 2/20/2007 | 2/21/2007 | 2/21/2007 | A | FAIL |
Dave Hannah
|
|
|
gordon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall egress doors donot swing in the path of egress called contractor he will talked to building owner
|
BLD-Final | 2/16/2007 | 2/20/2007 | 2/20/2007 | A | PART |
Dave Hannah
|
|
|
gordon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for temp occ needs plumbing final
|
FIRE-Final Inspection | 2/15/2007 | 2/16/2007 | 2/16/2007 | P | PASS |
Forrest France
|
|
|
Items on previous c/n are completed with the exception of max. occupant load sign posting to be finished prior to structural final inspection. Fire life safety passed.
|
FIRE-Final Inspection | 1/26/2007 | 1/29/2007 | 1/29/2007 | A | FAIL |
Forrest France
|
|
|
Fire alarm modifications are necessary which will require a permit and inspection for approval prior to life safety final, also need to provide one PFE, repair emergency lights at the exercise room, provie approved door hardware at two locations, post max occupant load sign, provide signage above keyed locking doors.
|
BLD-Other | 1/2/2007 | 1/2/2007 | 1/2/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/2/2007 at 7:02:19 AM. Contact: ###-####. ceiling grid ok to cover in weight room
|
BLD-Framing/Rough-in | 11/22/2006 | 11/24/2006 | 11/24/2006 | A | PASS |
Dave Hannah
|
|
|
GORDON; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Issue PAID IN FULL permit | | | 11/13/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/18/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/18/2006 | | DONE |
|
|
|
lft vm with craig slocom ###-#### that permit and fees are ready to be picked up but needs GC/RCE #
|
Permit Ready to Issue | | | 9/18/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/6/2006 | | 9/16/2006 | | PASS |
|
|
|
Resubmittal received 9/15/06 were incerted into plans and review. No further resubmittals required. Routing to permit desk to issue.
|
Plan resubmittals received | | | 9/16/2006 | | DONE |
|
|
|
Received two full size copies of resubmittals sheets of G.01, A2.1, A6.1, A8.1, A10.1, & E1.1. Given to Dan Stuart.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2006 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 7/31/2006 | | 9/16/2006 | | PASS |
|
|
|
9/16/2006 07:57:23 DRS - activity updated through activity BLDA022 from case BLD06-02184.
|
Routing - FIRE | 9/2/2006 | | 9/6/2006 | | PASS |
|
|
|
Attached review comments to the plans.
|
1st review completed | | | 9/6/2006 | | FAIL |
|
|
|
Failed Plan Check.
|
Plan resubmittals requested | | | 9/2/2006 | | DONE |
|
|
|
Faxed and e-mailed copy of plan review correction needed to Craig Slocum.
|
Routing - PLAN CHECK | 8/3/2006 | | 9/2/2006 | | FAIL |
|
|
|
Copy of Plan review e-mailed and faxed to Craig Slocum, CSHQA. routing to fire code analyst for review.
|
Routing - PLANNING | 8/2/2006 | | 8/3/2006 | | PASS |
|
|
|
Approved per CZC06-00132
|
Routing - PLUMBING | 8/1/2006 | | 8/2/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 7/31/2006 | | 8/1/2006 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/31/2006 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/31/2006 | | DONE |
|
|
|
|
Application received | | | 7/27/2006 | | |
|
|
|
|