Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-02197
StatusFinaled
Name TY TOMLIN
Site Address 6048 S TULIP PL
Project Name 
Customer Number 
ePlanReviewNo
Description
(NO CONTRACTOR REGISTRATION PROVIDED. APPLICANT CERTIFIES EXEMPTION PER IDAHO STATUTE 54-5205) This project is for a 2-story addition to an existing 1061s.f. 1-story single family dwelling. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." R-1C ok per Colleen Carroll. Separate electrical, plumbing, mechanical and ESC permits are required. All per the approved plans as marked REScheck and plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/28/20113/28/20113/29/2011 PASS
DetailsJim Storey
BLD-Conference3/28/20113/29/20113/29/2011APASS
DetailsJim Storey
BLD-Final3/29/20113/29/20113/29/2011APASS
DetailsJim Storey
DOC - Permit Finaled3/29/20113/29/20113/29/2011PPASS
DetailsJim Storey
BLD-Aging Inspection1/24/20111/24/20112/1/2011 PASS
DetailsJim Storey
BLD-Aging Inspection11/24/201011/24/201012/1/2010 PASS
DetailsJim Storey
BLD-Aging Inspection9/24/20109/24/20109/24/2010 PASS
DetailsJim Storey
BLD-Conference9/24/20109/24/20109/24/2010PPASS
DetailsJim Storey
reviewed idems required for final.
CHANGE STATUS TO (ISS)  9/23/2010 DONE
per jim storey
DOC - Permit Expired6/10/20106/10/20106/10/2010PPASS
DetailsJim Storey
R105.5 Expiration.
Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.

R105.8 Responsibility.
It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
BLD-Aging Inspection6/7/20106/7/20106/10/2010 PASS
DetailsJim Storey
R105.5 Expiration.
Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.

R105.8 Responsibility.
It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
BLD-Aging Inspection4/5/20104/5/20104/5/2010 PASS
DetailsJim Storey
BLD-Aging Inspection2/1/20102/1/20102/2/2010 PASS
DetailsJim Storey
work in progress talked to ty
BLD-Aging Inspection11/30/200911/30/200911/30/2009 PASS
DetailsJim Storey
BLD - Request for Extension8/5/20098/6/20098/6/2009APASS
DetailsJim Storey
Ty Phone #: ###-####wip
BLD-Energy code compliance2/4/20092/5/20092/5/2009PPASS
DetailsJim Storey
ty Phone #: ###-####
BLD-Conference2/4/20092/4/20092/4/2009PPASS
DetailsJim Storey
john Note: above ceiling Phone #: ###-####
BLD-Framing/Rough-in2/4/20092/4/20092/4/2009PPASS
DetailsJim Storey
john Note: above ceiling Phone #: ###-####
BLD-Framing/Rough-in1/6/20091/7/20091/7/2009PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/6/2009 at 3:20:18 PM. Contact: ###-####. ok to insulate upon ele and hvac aprovals.
BLD - Request for Extension9/8/20089/8/20089/8/2008 PASS
DetailsJim Storey
ty - ###-#### - Note: business is slow and my wife had surgery (low on cash) so working slowing to pay on this permit - I also need electric soon and HVAC wip
BLD - Request for Extension9/17/20079/18/20079/17/2007 PASS
DetailsJim Storey
###-#### - ty Note: just got plm permit but needs couple more months to finish 1/2 bath wip ok
BLD - Request for Extension3/21/20073/22/20073/22/2007 PASS
DetailsJim Storey
TY ###-####wip
Telephone call  1/29/2007 DONE
Ty called for extension, told him ok until March 22, if no progress between now and then to call for request for extension mid March
BLD-Footing9/21/20069/22/20069/22/2006APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/21/2006 at 9:21:27 AM. Contact: ###-####.
Issue PAID IN FULL permit  8/1/2006 DONE
(F) Reprint permit  8/1/2006  
(F) Reprint permit  8/1/2006 DONE
Routing Walk-In (Zoning)7/31/20067/31/20067/31/2006APASS
Routing Walk-In (BLD)7/31/20067/31/20067/31/2006ADONE
7/31/2006 10:15:08 PEP - activity updated through activity BLDA022 from case BLD06-02197.
Case Summary (BLD)  7/31/2006  
Inspection Record Card- Bld  7/31/2006  
PLANS/APPL TAKEN TO FRONT DESK  7/31/2006 DONE
Application received  7/31/2006