Third Notice BLD | 6/21/2007 | 6/21/2007 | 7/13/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 5/25/2007 | 5/25/2007 | 6/21/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/2/2007 | 5/25/2007 | | DONE |
|
|
|
|
BLD-Final | 5/2/2007 | 5/2/2007 | 5/2/2007 | P | PASS |
Jim Sly
|
|
|
clint ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith OK for Perm Occ. :):):):):):):)
|
Permanent Occupancy | | 5/2/2007 | 5/2/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/2/2007 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 5/2/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11567 issued 5-2-07 to Harry's Car Wash for warehouse and offices.
|
BLD-Final | 4/10/2007 | 4/11/2007 | 4/11/2007 | A | PART |
Jim Sly
|
|
|
Clint ; Phone #: ###-#### Internet Inspection Request from: Darla Downs C/N Need (2) handrails at stairway. All signatures completed for final.......No Occ Request card ......OK for Temp Occ.
|
FIRE-Final Inspection | 4/10/2007 | 4/11/2007 | 4/11/2007 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 4/10/2007 | 4/10/2007 | 4/10/2007 | P | FAIL |
Troy Cobbley
|
|
|
Fire extinguishers have been provided but they are not tagged. Also the door hardware is not the approved type.
|
BLD-Final | 4/5/2007 | 4/6/2007 | 4/6/2007 | P | NR |
Tony Young
|
|
|
cindy ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith need trades
|
FIRE-Final Inspection | 4/5/2007 | 4/6/2007 | 4/6/2007 | A | FAIL |
Forrest France
|
|
|
Missing PFE's on level one and two as indicated on review notes and and stamped plans, door hardware at the second floor doors are not approved.
|
BLD-Energy code compliance | 1/25/2007 | 1/25/2007 | 1/25/2007 | P | PASS |
Jim Sly
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Framing/Rough-in | 1/24/2007 | 1/24/2007 | 1/25/2007 | P | PASS |
Jim Sly
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 1/16/2007 | 1/16/2007 | 1/16/2007 | P | PART |
Jim Sly
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles No appr plan.....partial by unapproved plan....called contr.....Need insp with appr plan......Note: stairs built per residential code in lieu of commercial ?
|
BLD-Aging Inspection | 1/5/2007 | 1/5/2007 | 1/9/2007 | | DONE |
Jim Sly
|
|
|
WIP
|
Print Occupancy Form | | | 10/6/2006 | | DONE |
|
|
|
|
Telephone call | | | 10/6/2006 | | |
|
|
|
tlk to dave messienger ###-#### that permit and fees are ready to be picked up
|
Override - Parcel Holds | | | 10/6/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 10/6/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 10/6/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/6/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/4/2006 | | 10/5/2006 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2006 | | DONE |
|
|
|
|
Plan assigned to (CJW) | | | 10/5/2006 | | PASS |
|
|
|
10/5/2006 13:02:51 CJW - activity updated through activity BLDA022 from case BLD06-02208.
|
Routing - PLUMBING | 9/26/2006 | | 10/4/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/4/2006 | | |
|
|
|
received letter of transmittal from george r blecha listing items submitted. also "3" sets of structural calcs (5 pages each) from ahj engineers p.c.. received "3" sets of plans including "3" sheets each of A-1.0, A-2.0, A-3.0, A-4.0, E-1.0, E-1.1, EN1.0, & M1.0 plans taken to carl westfall
|
Routing - PUBLIC WORKS | 9/25/2006 | | 9/26/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/31/2006 | | 9/25/2006 | | |
|
|
|
Sent back to PW.
|
1st review completed | | | 8/31/2006 | | FAIL |
|
|
|
Failed plan check, plumbing and public works.
|
Routing - FIRE | 8/28/2006 | | 8/31/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 8/14/2006 | | 8/28/2006 | | FAIL |
|
|
|
The IBC plan review was started on August 21, 2006 and was finished on August 28, 2006. Revised drawings were required. See the plan review report. Completion of the plan review report was delayed while a proposed alternate provision was considered.
|
Plan Reviewer's activity | | | 8/22/2006 | | DONE |
|
|
|
A draft alternate letter for 2nd story egress was prepared and given to George Slane for his consideration.
|
Routing - PLUMBING | 8/11/2006 | | 8/14/2006 | | FAIL |
|
|
|
provide plumbing plans and complete public works review prior to plumbing review. use boise city approved flammable liquids interceptor detail- attached.
|
Routing - PLANNING | 8/10/2006 | | 8/11/2006 | | PASS |
|
|
|
Sarah Schafer (additional square footage added by construction of proposed 2nd floor)
|
Routing - PUBLIC WORKS | 8/9/2006 | | 8/10/2006 | | FAIL |
|
|
|
3 floor dains in warehouse noted: Flammable liquides interceptor required. Contact Walt ###-####
|
Plan resubmittals received | | | 8/10/2006 | | |
|
|
|
Received 1 copy of cover transmittal letter, 3 copies of A-2.0 and taken over to add to plans which were with Sarah S.
|
Routing - PLANNING Land Div | 8/8/2006 | | 8/9/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/3/2006 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/1/2006 | | DONE |
|
|
|
|
Application received | | | 7/31/2006 | | |
|
|
|
|