Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-02230
StatusFinaled
Name COMMERCIAL REMODELING
Site Address 350 N MILWAUKEE ST Unit: 2150
Project NameBTS - #2150
Customer Number 
ePlanReviewNo
Description
(BOISE TOWNE SQUARE - SPACE 2150)To remove tenant demising wall and relocate mall bulk head and eliminate this 1432 sq ft tenant space, This space will become tenant space "2147" after being combined with spaces 2141, 2143, & 2150 and will be 4450 sq ft for future tenant space. Work to include modification to the smoke evacuation system, sprinkler system, bulk head to prepare for future tenant. NO OCCUPANCY UNDER THIS PERMIT. This building is fully fire sprinklerd any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. Rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  3/9/2007 DONE
lft ms with rance regarding the plm, mech ect not on permit just bld
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
First Notice10/20/200610/20/200612/27/2006 DONE
DetailsMike Jordan
BLD-Final10/19/200610/20/200610/20/2006APASS
DetailsMike Jordan
Rance, please call 1st; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
DOC - Permit Finaled10/20/200610/20/200610/20/2006PPASS
DetailsMike Jordan
FIRE-Final Inspection10/18/200610/19/200610/19/2006APASS
DetailsTroy Cobbley
life safety finaled
FIRE-Final Inspection10/17/200610/18/200610/18/2006AFAIL
DetailsTroy Cobbley
smoke evac system failed and fire sprinklers were not ready.
BLD-Energy code compliance10/17/200610/18/200610/17/2006ACANC
DetailsMike Jordan
rance - note: call ahead to get system on test ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Inspection cancelled from web by: Patricia Smith
FIRE-Final Inspection10/12/200610/13/200610/13/2006PFAIL
DetailsTroy Cobbley
Did not perform inspection since the fire sprinkler work for the common walkway was not done yet. The new bulkhead wall is causing sprinkler coverage issues on the walkway side.
BLD-Framing/Rough-in9/22/20069/25/20069/25/2006APART
DetailsMike Jordan
rance Note: is possible FIRST THING IN AM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Framing for smoke bulkhead.
Issue PAID IN FULL permit  8/17/2006 DONE
Inspection Record Card- Bld  8/16/2006 DONE
Telephone call  8/16/2006 DONE
lft vm with paul lawrence ###-#### that permit and fees are ready to be picked up but needs GC/RCE
Permit Ready to Issue  8/16/2006 DONE
Plan assigned to (R_H)8/2/20068/2/20068/15/2006 PASS
8/15/2006 14:37:26 RMH - activity updated through activity BLDA022 from case BLD06-02230.
Routing - PLAN CHECK8/12/2006 8/15/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/15/2006 DONE
Plan resubmittals received  8/14/2006 DONE
Received 1 fire code review & 3 copys of sheet A-2 taken to Ron H.
Routing - FIRE8/14/2006 8/14/2006 PASS
Attached review comments to plans.
1st review completed  8/12/2006 FAIL
Failed fire.
Routing - FIRE8/9/2006 8/12/2006 FAIL
Faxed resubmittal items to architect. Attached review comments to plans.
Case Summary (BLD)  8/10/2006 DONE
Routing - PLAN CHECK8/9/2006 8/10/2006 PEND
Case Summary (BLD)  8/9/2006 DONE
Override - Parcel Holds  8/2/2006  
Recd Pcfee & Taken To Pln CK  8/2/2006 DONE
Plans ACCEPTED BY PLAN TECH  8/2/2006  
Application received  8/1/2006  
Third Notice BLD1/8/20071/8/2007   
Second Notice has not been responded to.