BLD-Conference | 5/18/2007 | 5/21/2007 | 5/21/2007 | P | PASS |
Dave Hannah
|
|
|
Please call Josh Baker 30 minutes prior to inspection so he can meet inspector at site. Thank you Phone #: ###-#### Internet Inspection Request from: Aaron Baker
|
DOC - Permit Finaled | 5/21/2007 | 5/21/2007 | 5/21/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/17/2007 | 5/18/2007 | 5/18/2007 | P | CANC |
Dave Hannah
|
|
|
Please call Josh 30 minutes before arriving. Thank you! Phone #: ###-#### Internet Inspection Request from: Aaron Baker Inspection cancelled from web by: Aaron Baker
|
BLD-Framing/Rough-in | 9/21/2006 | 9/22/2006 | 9/22/2006 | A | PASS |
Dave Hannah
|
|
|
preston; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Energy code compliance | 9/22/2006 | 9/22/2006 | 9/22/2006 | P | PASS |
Dave Hannah
|
|
|
preston; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Routing Walk-In (BLD) | 8/4/2006 | 8/4/2006 | 8/4/2006 | A | DONE |
|
|
|
8/4/2006 09:26:15 PEP - activity updated through activity BLDA022 from case BLD06-02252.
|
Routing Walk-In (BLD) | 8/3/2006 | 8/3/2006 | 8/4/2006 | A | DONE |
|
|
|
8/4/2006 08:02:13 B_S - activity updated through activity BLDI252 from case BLD06-02252.
|
Case Summary (BLD) | | | 8/4/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/4/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/4/2006 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 8/3/2006 | 8/3/2006 | 8/3/2006 | A | DONE |
|
|
|
8/3/2006 11:46:38 DEM - activity updated through activity BLDI252 from case BLD06-02252.
|
Application received | | | 8/3/2006 | | |
|
|
|
|
CHANGE STATUS TO (PND) | | | 8/3/2006 | | DONE |
|
|
|
proper floor plans as are required for the existing.
|