Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD06-02258
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 312 S 9TH ST
Project NameFOSTER GARAGE
Customer Number 
ePlanReviewNo
Description
(RCE 764 Kreizenbeck Constructors)(IDAHO TRUST NATIONAL BANK ATM DRIVE THRU - IN THE FOSTER PARKING GARAGE COMMON AREA) To construct two lanes of drive-thru banking including ATM, night box, and teller unit per approved plans and CUP05-00160 in the existing parking garage building. Work to include two new concrete curb islands with bollards for the banking equipment to be supported on, listed assembly penetrations of the existing 4-hour and 2-hour rated walls for pneumatic tube system and conduits, and electrical work. A Letter of Completion is to be issued when done. (NOTE: This is located in Unit 4 of the Front Street Condominiums)(NOTE: The actual bank tenant is located in the adjacent building to the south - BODO BLDG. #4 and was done under BLD06-01589.) NOTE: This building is fully fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/8/20071/8/20079/25/2015 DONE
DetailsCathy Chiles
This permit finaled on the web by Brandon Byington
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
First Notice11/30/200611/30/200612/27/2006 DONE
DetailsDave Hannah
Letter of compliance  12/6/2006 DONE
Letter of Compliance issued 12-6-06
FIRE-Final Inspection12/1/200612/4/200612/4/2006APASS
DetailsForrest France
Fire life safety is satisfactory, inspection passed. Signature card for record of inspection not available on site.
BLD-Final11/29/200611/30/200611/30/2006PPASS
DetailsDave Hannah
jan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
DOC - Permit Finaled11/30/200611/30/200611/30/2006PPASS
DetailsDave Hannah
Issue PAID IN FULL permit  9/14/2006 DONE
Plan assigned to (JCB)8/11/2006 8/16/2006 PASS
8/16/2006 14:30:54 JCB - activity updated through activity BLDA022 from case BLD06-02258.
Routing - FIRE8/12/2006 8/16/2006 PASS
No review comments.
1st review completed  8/16/2006 PASS
Routing - PLAN CHECK8/16/2006 8/16/2006 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  8/16/2006 PASS
Inspection Record Card- Bld  8/16/2006 DONE
Telephone call  8/16/2006 DONE
tlk to barbara S regarding fees and permit is ready
Permit Ready to Issue  8/16/2006 DONE
Routing - PLAN CHECK8/11/2006 8/12/2006 PEND
No comments for project. Plans to route to Fire Dept. for review. When approved by the Fire Dept. the permit can then be issued.
Routing - PLANNING8/11/2006 8/11/2006 PASS
Cody Riddle CUP05-00160-Drawings indicate compliance with Conditional Use Permit.
Recd Pcfee & Taken To Pln CK  8/4/2006  
Application received  8/3/2006  
Plans ACCEPTED BY PLAN TECH  8/3/2006