Permit Information
Permit NumberBLD06-02283
StatusFinaled
Name DATUM CONSTRUCTION MANAGEMENT INC
Site Address 600 N MILWAUKEE ST
Project NameTGI FRIDAY'S RESTAURANT
Customer Number 
ePlanReviewNo
Description
(RCE-702 DATUM CONSTRUCTION) (TGI FRIDAY'S - RESTAURANT REMODEL) This building is fire sprinklered for fire area and fire flow. To remodel the 3,917 square foot drinking and dining area within an existing 6,857 square foot restaurant building. Work is to include interior windows, interior nonbearing walls, suspended acoustical ceilings, suspended gypsum board ceilings, interior finishes, new entry doors, new exterior windows at the entry, new exterior awnings, and a new exterior parapet/façade structure. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. DRH06-00250 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD2/12/20072/12/20073/9/2007 DONE
Second Notice has not been responded to.
Third Notice BLD2/12/20072/12/20073/9/2007 DONE
Second Notice has not been responded to.
Third Notice BLD2/12/20072/12/20073/9/2007 DONE
Second Notice has not been responded to.
Third Notice BLD2/12/20072/12/20073/1/2007 DONE
Second Notice has not been responded to.
Second Notice BLD2/2/20072/2/20072/12/2007 DONE
First Notice has not been responded to.
Second Notice BLD2/2/20072/2/20072/12/2007 DONE
First Notice has not been responded to.
Telephone call  2/9/2007 DONE
per adam ford at ###-#### told him we had revised plans per Carl Westfall--said he didn't need plans. job is already done. throw away..
First Notice 12/28/20062/2/2007 DONE
Permanent occupancy UNPAID FEE  12/28/2006 DONE
Perm. Occ. Cert. # 11372 issued 12-28-06 to TGI Friday's.
BLD-Final12/27/200612/27/200612/27/2006PPASS
DetailsDave Hannah
jason ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
FIRE-Final Inspection12/22/200612/26/200612/27/2006APASS
DetailsTroy Cobbley
Per Forrest the life safety is finaled
BLD-Final12/22/200612/26/200612/26/2006ANR
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/22/2006 at 2:39:42 PM. Contact: ###-####.
Need Code Enforce and Fire sign off.
Code Occupancy Approval  12/26/2006 PASS
A SMAL METAL BAND IS MISSING BUT WILL BE PUT UP TODAY SO I SIGNED FINAL
Plan Reviewer's activity  10/19/2006 PASS
Reviewed resubmitted drawings and approved them. CJW
Telephone call  10/19/2006 DONE
per carl westfall no fees due-revised sheets -left mess for adam ford at 1-###-#### for pickup
Plan resubmittals received  10/18/2006 DONE
Received transmittal, & 2 copys of sheet A301 taken to Carl W. this permit issued 10-3-06
BLD-Framing/Rough-in10/10/200610/11/200610/11/2006APART
DetailsMike Jordan
Just the facade in the mezzanine area please///###-#### jim raines. Framing for new entry. an attic access is required and required to be vented. Noted to contractor to contact fire insp. regarding sprinklkerhead issue in new attic.
Issue PAID IN FULL permit  10/3/2006 DONE
Plan resubmittals received  10/3/2006  
received record of transmittal from the richardson design partnership, "2" sets of plans including 2 sheets each of A002, A100, A101, A102, A201, A202, A401, A402, & A403- plans taken to carl westfall
Print Occupancy Form  9/28/2006 DONE
Telephone call  9/28/2006 DONE
lft vm with adam ford ###-#### that permit and fees are ready to be picked up but needs RP
Permit Ready to Issue  9/28/2006 DONE
Routing - PLAN CHECK9/1/2006 9/18/2006 PASS
Drawings approved after resubmittal review
PLANS/APPL TAKEN TO FRONT DESK  9/18/2006 DONE
Plan assigned to (CJW)8/11/2006 9/18/2006 PASS
9/18/2006 14:54:49 CJW - activity updated through activity BLDA022 from case BLD06-02283.
Plan resubmittals received  9/14/2006 DONE
Received 1 record of transmittal,1 addendum, and 2 copys of sheets G001,A001,A002,A100,A101,A102,A202,A301,A401,A402,A403,A501,AE1.1,E2.1 taken to Carl W.
Routing - FIRE8/30/2006 9/1/2006 PASS
Attached review comments to plans.
1st review completed  9/1/2006 FAIL
Failed Plan Check.
Routing - PLAN CHECK8/14/2006 8/30/2006 FAIL
The IBC plan review was started on August 28, 2006 and was finished on August 30, 2006. Revised drawings were required. See the plan review report.
Routing - PLANNING8/14/2006 8/14/2006 PASS
Routing - PUBLIC WORKS8/11/2006 8/14/2006 PASS
Application received  8/7/2006  
Recd Pcfee & Taken To Pln CK  8/7/2006 DONE
Plans ACCEPTED BY PLAN TECH  8/7/2006