Telephone call | | | 10/3/2007 | | DONE |
|
|
|
I talk to Mr. Rockwell (arch) about Capitol photo no response and he also said that they havent been paid either so I am giving it Rita 4:25 pm
|
Third Notice BLD | 4/18/2007 | 4/18/2007 | 6/1/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/5/2007 | 4/5/2007 | 4/18/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 3/23/2007 | 3/23/2007 | 4/5/2007 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 3/23/2007 | 3/23/2007 | 3/23/2007 | P | PASS |
Dave Hannah
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
DOC - Permit Finaled | 3/23/2007 | 3/23/2007 | 3/23/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/21/2007 | 3/21/2007 | 3/21/2007 | P | FAIL |
Dave Hannah
|
|
|
MATT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs to fix locks and door hardware and finish restroom
|
FIRE-Final Inspection | 3/15/2007 | 3/21/2007 | 3/21/2007 | A | PASS |
Forrest France
|
|
|
Life safety is acceptable, noted the existing building address numbers are to be relocated and the size increased as discussed, lever hardware at the restroom to be installed prior to structrual final.
|
BLD-Framing/Rough-in | 3/15/2007 | 3/15/2007 | 3/15/2007 | P | NR |
Jim Sly
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Need Fire inspection
|
BLD-Framing/Rough-in | 8/30/2006 | 8/31/2006 | 8/31/2006 | A | PASS |
Dave Hannah
|
|
|
matt ###-####
|
Issue PAID IN FULL permit | | | 8/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/10/2006 | | DONE |
|
|
|
tlk to matt cilley that permit and fees are ready to be picked up but needs GC/RCE #
|
Permit Ready to Issue | | | 8/10/2006 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 8/8/2006 | 8/8/2006 | 8/9/2006 | | PASS |
|
|
|
8/9/2006 13:12:08 RMH - activity updated through activity BLDA022 from case BLD06-02285.
|
Routing - PLAN CHECK | 8/9/2006 | | 8/9/2006 | | PASS |
|
|
|
|
Routing - FIRE | 8/9/2006 | | 8/9/2006 | | PASS |
|
|
|
Minor remodel / field verify
|
Case Summary (BLD) | | | 8/9/2006 | | DONE |
|
|
|
|
1st review completed | | | 8/9/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2006 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/8/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/8/2006 | | |
|
|
|
|
Application received | | | 8/7/2006 | | |
|
|
|
|