Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-02288
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 10524 BUSINESSPARK LN STE 101
Project NameBarton Investments
Customer Number 
ePlanReviewNo
Description
(SOUTHWIND BUSINESS PARK - BUILDING "L") This building is NOT fire sprinklered. To perform interior tenant improvement work within a 1,270 square foot building. The building shell was constructed under permit BLD06-01574. Work is to include interior nonbearing walls, a restroom accessible to the disabled, interior doors, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/6/20086/6/20082/27/2009 DONE
DetailsPatricia Smith
Second Notice has not been responded to.
Meeting  2/27/2009 DONE
Details
no final cert of value ever received - signed off per RAD
Second Notice BLD4/23/20084/23/20086/6/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 3/27/20084/23/2008 DONE
Permanent Occupancy  3/27/2008 DONE
BLD-Final4/23/20074/24/20074/24/2007APASS
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Bathroom mirror has been replaced. ok for perm occ.
BLD-Final4/20/20074/23/20074/23/2007ANR
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. wip.
BLD-Final4/23/20074/23/20074/23/2007PCANC
DetailsMike Jordan
jess; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
Temporary occupancy  4/19/2007 DONE
Temp. Occ. Cert. # 5567 issued 4-19-07 to Barton Investments.
BLD-Final4/17/20074/18/20074/18/2007APART
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Temp occ granted. Needs to mount mirror in bathroom as per approved plan to meet ADA standards.
FIRE-Final Inspection4/17/20074/17/20074/17/2007PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection4/16/20074/16/20074/16/2007PFAIL
DetailsTroy Cobbley
Provide suite number, tag fire extinguisher and repair the exit sign/emergency light
BLD-Conference3/5/20073/6/20073/6/2007APASS
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Visual reinspected horizontal assembly at previous locations were 5/8 type x was removed.
BLD-Energy code compliance3/2/20073/2/20073/2/2007PPASS
DetailsMike Jordan
Jeff; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in3/1/20073/1/20073/1/2007PPASS
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok to insul. wip on completinf firecasulking, all can lights have been boxed out. furout wall built for elec meter.
BLD-Conference1/26/20071/26/20071/29/2007PPART
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Darla Downs. 1hr ceiling assembly, 1st layer ok.
Issue PAID IN FULL permit  11/15/2006 DONE
Routing - PLAN CHECK9/6/2006 9/29/2006 PASS
Drawings approved after the resubmittal review.
Routing - PUBLIC WORKS9/29/2006 9/29/2006 PASS
Sent back for revised sewer assessment
Routing - PLAN CHECK9/29/2006 9/29/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/29/2006 DONE
Print Occupancy Form  9/29/2006  
Telephone call  9/29/2006 DONE
lft ms with terry teal ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  9/29/2006 DONE
Plan assigned to (CJW)8/18/2006 9/29/2006 PASS
9/29/2006 10:35:51 CJW - activity updated through activity BLDA022 from case BLD06-02288.
Plan resubmittals received  9/27/2006  
Received 1 review comment,1 transmittal & 2 copys of sheets A2-1,A2-2,A7-1,M-1,P-1,E-1 taken to Carl W.
1st review completed  9/6/2006 FAIL
Failed Plan Check.
Routing - FIRE9/5/2006 9/6/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK8/21/2006 9/5/2006 FAIL
The IBC plan review was started on August 31, 2006 and was finished on September 5, 2006. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS8/18/2006 8/21/2006 PASS
Routing - Addressing8/18/2006 8/18/2006 PASS
Recd Pcfee & Taken To Pln CK  8/8/2006 DONE
Plans ACCEPTED BY PLAN TECH  8/8/2006  
Application received  8/7/2006