BLD-Final | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Jim Storey
|
|
|
|
Letter of compliance/Occupancy | | | 2/12/2020 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 2/12/2020 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 2/12/2020 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 2/12/2020 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 2/12/2020 | | DONE |
|
|
|
|
BLD-Final | 1/30/2020 | 1/31/2020 | 2/3/2020 | P | PASS |
Jim Storey
|
|
|
lee Phone #: ###-####
|
BLD-Aging Inspection | 1/24/2020 | 1/24/2020 | 1/30/2020 | | PASS |
Jim Storey
|
|
|
|
BLD-Other | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Jim Storey
|
|
|
fire culking // Lee Scott Phone #: ###-####
|
BLD-Aging Inspection | 9/12/2019 | 9/12/2019 | 9/12/2019 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 9/11/2019 | 9/11/2019 | 9/12/2019 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Framing/Rough-in | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | CANC |
Jim Sly
|
|
|
Lee- area A 3rd floor Phone #: ###-####
|
BLD-Framing/Rough-in | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | PART |
Jim Sly
|
|
|
inspection for area A 3rd floor- Lee Phone #: ###-#### 1st walk thru......Framing Generally appears OK. Need to complete all trade rough-in inspections Provide listings for all firestopping......complete firestopping per listings.
|
BLD-Other | 4/9/2019 | 4/10/2019 | 4/10/2019 | P | PART |
Jim Sly
|
|
|
roof nailing // Lee Phone #: ###-####
|
BLD-Wall Bracing | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PART |
Jim Sly
|
|
|
Lee Phone #: ###-#### North 1/2 of structure........OK.
|
BLD-Footing | 1/30/2019 | 1/31/2019 | 1/31/2019 | A | PART |
Dave Hannah
|
|
|
Lee Phone #: ###-#### ok after spec inspection oks
|
BLD-Footing | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PART |
Jim Storey
|
|
|
Lee Scott Phone #: ###-#### wip si pending grade beam and ft with colms south east coner 60 inch culvert.
|
BLD-Footing | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PART |
Brandon Shaw
|
|
|
OK pending STRATA special insp. tests and approvals.
|
BLD-Footing | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | PART |
Jim Sly
|
|
|
Lee Scott Phone #: ###-#### Southwest corner of Bldg....OK pending STRATA special insp. tests and approvals.
|
BLD-Foundation | 11/30/2018 | 12/3/2018 | 12/3/2018 | P | PART |
Jim Sly
|
|
|
Lee Phone #: ###-#### Select Walls OK pending STRATA special inspections, tests and approvals .........and cold weather provisions per ACI 318 standards.
|
BLD-Footing | 11/28/2018 | 11/29/2018 | 11/29/2018 | A | PART |
Jim Storey
|
|
|
Lee Phone #: ###-#### placed w s/i
|
OVERRIDE | | | 11/28/2018 | | |
|
|
|
|
OVERRIDE | | | 11/28/2018 | | |
|
|
|
|
Plan assigned to (CJW) | 10/16/2018 | 10/16/2018 | 11/28/2018 | | PASS |
Carl Westfall
|
|
|
Plan mod - Crescent Rim foundation - 11-27-18 routed to Consultant Structural Engineer
|
CHANGE STATUS TO (ISS) | | | 11/28/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/28/2018 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/27/2018 | | 11/28/2018 | | PASS |
Carl Westfall
|
|
|
Chris Merrill (Stapley)
|
Plan Reviewer's activity | | | 11/28/2018 | | PASS |
|
|
|
Plan mod approved
|
Permit Ready to Issue | | | 11/28/2018 | | DONE |
|
|
|
PLAN MOD ***need to also pay for ESC06-01306, reprint esc permit, have customer sign conditions, and they need site ESC sign.//see notes in esc permit activities***
|
Plan resubmittals requested | | | 11/27/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/27/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/27/2018 | | 11/27/2018 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals requested | | | 11/26/2018 | | DONE |
|
|
|
Thanksgiving week. Plans Examiner gone Wednesday through the end of the week. Routing finished on Monday.
|
Plan resubmittals received | | | 11/26/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/26/2018 | | 11/26/2018 | | PASS |
Carl Westfall
|
|
|
|
Routing Off Site - STRUCTURAL | 11/26/2018 | | 11/26/2018 | | FAIL |
Carl Westfall
|
|
|
Chris Merrill (Stapley)
|
BLD-Foundation | 11/20/2018 | 11/21/2018 | 11/21/2018 | A | PART |
Jim Storey
|
|
|
Lee Phone #: ###-#### placed with si pending reports
|
Routing Off Site - STRUCTURAL | 11/14/2018 | | 11/21/2018 | | FAIL |
Carl Westfall
|
|
|
Chris Merrill (Stapley)
|
Routing - PLAN CHECK | 11/13/2018 | | 11/14/2018 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 11/13/2018 | | DONE |
Carl Westfall
|
|
|
|
Plan resubmittals requested | | | 11/8/2018 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/23/2018 | | 11/7/2018 | | FAIL |
Carl Westfall
|
|
|
Chris Merrill (Stapley)
|
Routing - PLAN CHECK | 10/22/2018 | | 10/23/2018 | | PASS |
Carl Westfall
|
|
|
Back from the front desk
|
Plan Modification Accepted | | | 10/22/2018 | | DONE |
|
|
|
Finally got the needed information from the Architect to process the plan mod. Sheet A2.10 had been revised to show only one opening instead of 2.
|
Plan Modification Accepted | | | 10/17/2018 | | DONE |
Carl Westfall
|
|
|
Drawings uploaded
|
Plan Modification Accepted | | | 10/16/2018 | | DONE |
|
|
|
Plan Mod - Minor modifications to two column footings to accommodate existing conditions. Addition of
details to accommodate new exhaust fan opening in garage wall, and new garage air intake well.
|
CHANGE STATUS TO (ISS) | | | 10/9/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/5/2018 | | |
|
|
|
|
Plan assigned to (CJW) | 8/16/2018 | 8/16/2018 | 10/5/2018 | | PASS |
Carl Westfall
|
|
|
(2nd done) 09/05/18 (15 days) (ePlan - 22 sheets) - Plan Mod - Crescent Rim
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/5/2018 | | DONE |
|
|
|
Need
GC Form
Plan Mod Approved
Do not reissue (plan mod fee due)
|
Routing Off Site - STRUCTURAL | 9/27/2018 | | 10/4/2018 | | PASS |
Carl Westfall
|
|
|
Chris Merrill (Stapley)
|
Routing PW Solid Waste | 9/27/2018 | | 10/3/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PLAN CHECK | 9/26/2018 | | 9/27/2018 | | PASS |
Carl Westfall
|
|
|
Pending approval by Structural
|
Plan resubmittals received | | | 9/26/2018 | | DONE |
|
|
|
|
1st review completed | | | 9/25/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 9/25/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/4/2018 | | 9/25/2018 | | PASS |
Carl Westfall
|
|
|
Pending structural
|
Routing PW Environmental | 9/4/2018 | | 9/21/2018 | | PASS |
Terry Alber
|
|
|
Parking garage floor drains appear to go to sewer through oil/sediment interceptor.
|
Routing Off Site - STRUCTURAL | 9/4/2018 | | 9/18/2018 | | FAIL |
Carl Westfall
|
|
|
Chris Merrill (Stapley)
|
Routing - Erosion and Sediment | 9/4/2018 | | 9/13/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified PD and RP. Site preparation inspeciton required.
|
Routing PW Sewer Rating | 9/4/2018 | | 9/10/2018 | | PASS |
Morgan Webb
|
|
|
FUTURE PERMITS WILL HAVE FIXTURE COUNTS.
|
Routing - PUBLIC WORKS | 9/10/2018 | | 9/10/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 9/4/2018 | | 9/6/2018 | | PASS |
Josh Wilson
|
|
|
Parking garage/foundation only. Approval of above-grade improvements subject to original DR approval and subsequent modifications.
|
Routing - Addressing | 9/4/2018 | | 9/5/2018 | | PASS |
Doug Chausow
|
|
|
Address corrected to: 3075 W Crescent Rim Dr.
|
Routing PW Grading-Hillside | 9/5/2018 | | 9/5/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing PW Solid Waste | 9/4/2018 | | 9/4/2018 | | FAIL |
Evan Carpenter
|
|
|
The solid waste room must have a door opening at least 8 feet wide.
There must be an access ramp that allows the containers to be transported to a loading area for servicing within 15 feet of the solid waste room door; the pathway is currently blocked by parking spaces and landscaping.
|
Plan Reviewer's activity | | | 9/4/2018 | | DONE |
|
|
|
Carl Westfall routed the drawings
|
Routing - PLANNING | 9/4/2018 | | 9/4/2018 | | PASS |
Cody Riddle
|
|
|
Parking garage/foundation only. Approval of above-grade improvements subject to original DR approval and subsequent modifications.
|
Plan Reviewer's activity | | | 8/31/2018 | | PASS |
Carl Westfall
|
|
|
Plan intake review approved
|
Plan Modification Accepted | | | 8/31/2018 | | PASS |
|
|
|
Permit Desk completed their role after plan mod plan intake review was approved
|
Intake Approval | | | 8/29/2018 | | FAIL |
Carl Westfall
|
|
|
Please refer to the items noted on the plan intake checklist in the "documents" folder. Resolve each item as directed. JHB
|
Route to Impact Fee Review | 8/16/2018 | 8/19/2018 | 8/20/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan Modification Accepted | | | 8/16/2018 | | DONE |
|
|
|
Plan Modification workflow started for review as per CJW & Architects direction - Where foundations and footings occur beyond the already-built parking garage deck,
adjustments to overall building footprint (already approved in DRH18-00199) necessitate
adjustments to foundation conditions from the original 2006 permitted design.
|
BLD-Aging Inspection | 10/22/2015 | 10/22/2015 | 10/22/2015 | | PEND |
Phil Shearer
|
|
|
|
BLD-Aging Inspection | 7/23/2015 | 7/23/2015 | 7/23/2015 | | PEND |
Phil Shearer
|
|
|
|
BLD-Aging Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 | | PEND |
Phil Shearer
|
|
|
|
BLD-Aging Inspection | 1/21/2015 | 1/21/2015 | 1/21/2015 | | PART |
Phil Shearer
|
|
|
|
BLD-Aging Inspection | 10/22/2014 | 10/22/2014 | 10/22/2014 | | PART |
Phil Shearer
|
|
|
Work in progress
|
BLD-Aging Inspection | 4/17/2014 | 4/17/2014 | 4/17/2014 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/16/2014 | 1/16/2014 | 1/21/2014 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/8/2013 | 10/8/2013 | 10/8/2013 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 7/9/2013 | 7/9/2013 | 7/9/2013 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/9/2013 | 4/9/2013 | 4/9/2013 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/8/2013 | 1/8/2013 | 1/8/2013 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/9/2012 | 10/9/2012 | 10/9/2012 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 7/10/2012 | 7/10/2012 | 7/10/2012 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/10/2012 | 4/10/2012 | 4/10/2012 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/10/2012 | 1/10/2012 | 1/11/2012 | | PASS |
Tom Arcoraci
|
|
|
|
Inspection Record Card- Bld | | | 1/11/2012 | | DONE |
|
|
|
|
BLD-Aging Inspection | 10/11/2011 | 10/11/2011 | 10/11/2011 | | PASS |
Tom Arcoraci
|
|
|
|
PubWorks Occupancy Approval | 10/10/2011 | 10/10/2011 | 10/10/2011 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Aging Inspection | 7/12/2011 | 7/12/2011 | 7/12/2011 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/11/2011 | 4/11/2011 | 4/11/2011 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 2/7/2011 | 2/7/2011 | 2/7/2011 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 12/6/2010 | 12/6/2010 | 12/6/2010 | | PART |
Tom Arcoraci
|
|
|
no
|
BLD-Aging Inspection | 10/4/2010 | 10/4/2010 | 10/4/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 8/2/2010 | 8/2/2010 | 8/2/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 5/31/2010 | 5/31/2010 | 6/2/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 3/29/2010 | 3/29/2010 | 3/29/2010 | | PASS |
Tom Arcoraci
|
|
|
|
Case Summary (BLD) | | | 3/15/2010 | | DONE |
|
|
|
|
BLD-Aging Inspection | 1/26/2010 | 1/26/2010 | 1/26/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 11/23/2009 | 11/23/2009 | 11/23/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/23/2009 | 11/23/2009 | 11/23/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/22/2009 | 9/22/2009 | 9/22/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 7/20/2009 | 7/20/2009 | 7/20/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 5/18/2009 | 5/18/2009 | 5/18/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 3/16/2009 | 3/16/2009 | 3/16/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/12/2009 | 1/12/2009 | 1/12/2009 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/11/2008 | 11/11/2008 | 11/12/2008 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 11/12/2008 | 11/12/2008 | 11/12/2008 | P | CANC |
Tom Arcoraci
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
CHANGE STATUS TO (ISS) | | | 11/12/2008 | | |
|
|
|
per tom a. done in error
|
Meeting | | | 8/7/2008 | | DONE |
|
|
|
Meeting with Architect, Andy Erstad and the general contractor, Sam Rogers and George Slane, to discuss their proposal to allow the basement mechanical room to be approved for occupancy without installing sprinklers in the basement. Due to economic circumstances, they do not intend to build the upper portion of the building at this time. They do not intend to use the parking garage for vehicle parking, but they need occupancy approval for the mechanical room to provide HVAC for the detached Bldg 2/3. The basement requires sprinkler protection for occupancy (due to size); partial sprinklers within the Mechanical room itself would not provide protection for safe occupancy and egress via the 2 required exits. They proposed partial smoke detection as an alternative but an alarm is not equivalent to sprinkler protection. Sam Rogers proposed Fire would consider an alternative to fully sprinkler approximately one-half of the basement area, encompassing both access/egress ways, the Mechanical room, the electrical panel, the fire sprinkler riser and 20' beyond this area, with the condition that no combustibles would be allowed within the non-sprinklered area. They indicated they will discuss this option with the owners and decide a course of action. D. Hanneman subsequently confirmed he would consider that as an acceptable alternative, for temporary occupancy, if they choose to propose it.
|
BLD-Aging Inspection | 6/9/2008 | 6/9/2008 | 6/9/2008 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/9/2008 | 1/9/2008 | 1/9/2008 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/31/2007 | 10/31/2007 | 10/31/2007 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 8/30/2007 | 8/30/2007 | 8/30/2007 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 5/18/2007 | 5/21/2007 | 5/21/2007 | A | PART |
Tom Arcoraci
|
|
|
Special inspection by Strata. Pouring at noon. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Foundation | 3/23/2007 | 3/26/2007 | 3/26/2007 | A | PASS |
Mike Jordan
|
|
|
Pouring at noon Phone #: ###-####. Reviewed all special insp. reports to date. Everything ok, no non conformances noted.
|
Telephone call | | | 3/2/2007 | | DONE |
|
|
|
Review of emailed sketch and request from TVFP for approval of new spk FDC and Standpipe FDC locations; review of garage plans, emails to DH; reco'd we defer meeting until "real" plans are submittted.
|
(F) Reprint permit | | | 12/21/2006 | | |
|
|
|
|
Plan assigned to (M_P) | 8/14/2006 | 8/14/2006 | 12/20/2006 | | PASS |
|
|
|
12/20/2006 09:18:52 M_P - activity updated through activity BLDA022 from case BLD06-02316.
|
Routing - PLANNING | 12/18/2006 | | 12/20/2006 | | PASS |
|
|
|
Waiting for recorded easement.
Approved per the DR and the CUP
|
Routing - PLAN CHECK | 12/20/2006 | | 12/20/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/20/2006 | | DONE |
|
|
|
|
Telephone call | | | 12/20/2006 | | DONE |
|
|
|
called ###-#### and left message for Dave Holm that permit is ready
|
Permit Ready to Issue | | | 12/20/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/20/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/15/2006 | | 12/18/2006 | | |
|
|
|
Routing to Planning.
|
Routing Off Site - STRUCTURAL | 12/4/2006 | | 12/18/2006 | | PASS |
|
|
|
8-1/2" x 11" resubmittals received 12/4/06 sent to outside engineer via Action Couriers.
|
Routing - FIRE | 12/15/2006 | | 12/15/2006 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing Off Site - STRUCTURAL | 12/14/2006 | | 12/15/2006 | | PASS |
|
|
|
Called action Courier for pick up of 1 structural calcs book volume 2///12/14/06 @ 3:55
|
Routing - PLAN CHECK | 12/12/2006 | | 12/15/2006 | | PEND |
|
|
|
Waiting for others to approve prior toissuing permit.
|
Routing - PLUMBING | 12/11/2006 | | 12/12/2006 | | PASS |
|
|
|
Resubmittals from Bob Tikker included. garage only, venting of garage drainage must be per upc 910.3- vent upper terminal waste lines over 15'.
|
Plan resubmittals received | | | 12/11/2006 | | |
|
|
|
Received three copies of the following pages: A300, A310, A320, A321. Received 4 copies of the following pages: C3.1, C5.0; taken to Mike Phillips
|
Plan resubmittals received | | | 12/8/2006 | | |
|
|
|
Received 2 copies of structural calcs for wood permit submittal- volumes 1 & 2, 3 copies of the following sheets--S2.07, S2.08, S2.09, S2.10, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.18W, S2.19, S2.20, S2.21, S5.00, S5.01, S5.02, S5.03, S5.04, S6.00, S1.00, S1.01, S2.01W, S2.02, S2.03, S2.04, S2.06W and 1 set of everything sent to outside Structural engineer and the rest taken to Mike Phillips
|
Plan resubmittals received | | | 12/8/2006 | | |
|
|
|
Received 4 copies of sheets A001, A200, A201, A205, A206, A211, A212, A217, A218 and taken to Mike Phillips
|
Routing - PLANNING | 12/4/2006 | | 12/8/2006 | | FAIL |
|
|
|
Sarah Schafer
Failed DR and CUP review. Letter being sent to applicant with explination. Still needs drainage easement shown on plans, elevations that match DR approved, pork chop in Peasly Dr.
|
Routing - PLANNING Land Div | 12/8/2006 | | 12/8/2006 | | PASS |
|
|
|
Parcels combined into one parcel. Applicant submitted recorded Notice of Buildable Parcel, Deed and New Tax Parcel Number.
|
Plan resubmittals received | | | 12/7/2006 | | |
|
|
|
Received 1 copy of pages M100, M200, M201, M202, M203; taken to Mike Phillips
|
Plan resubmittals received | | | 12/6/2006 | | |
|
|
|
Received 3 sets of DR meeting of floor plan & elevations and taken tot Mike Phillips
|
Plan resubmittals received | | | 12/4/2006 | | DONE |
|
|
|
Received Structural Engineer resubmittals in the form of 1 cover letter; 1 copy of responses to building review comments w/additional structural calculations; 1 copy of geotechnical addendum dated 7/7/06. Copy given to Mike Phillips and sent to outside engineer for review.
|
Routing - PLUMBING | 12/4/2006 | | 12/4/2006 | | FAIL |
|
|
|
no plans
|
Routing - PLAN CHECK | 10/16/2006 | | 12/4/2006 | | |
|
|
|
Routing resubmittals to plumbing, planning, land division and fire.
|
Plan resubmittals received | | | 11/24/2006 | | |
|
|
|
Inserted new sheet into the plans on 11/28/06/ Received transmittal sheet, three copies of 12pg. letter of response, three copies of application for Project Start Up for Special Inspections, 2pg. repsonse letter from Tikker Eng., 11pg. electrical response, 17pgs. on Fire Suppression, two copies of the following pages: FP100, FP101, FP102, FP103, FP104, FP105, FP106, FP107, FP108, FP109, FP110; four copies of the following pages: L101, M500, M504, M509, M514, E1.9, E2.1.1L, E2.2.0L, E2.2.1L, E2.3.0L, E2.3.1L, E2.4.1L; five copies of the following pages: A001, A002, A003, A010, A011, A012, A013, A014, A100, A101, A102, A110, A111, A112, A113, A114, A115, A200, A201, A202, A203, A204, A205, A206, AA207, A208, A209, A210, A211, A212, A213, A214, A215, A216, A217, A218, A219, A220, A221, A230, A231, A232, A233, A234, A235, A236, A237, A238, A239, A240, A241, A242, A243, A244, A245, A246, A247, A248, A249, A260, A261, A262, A270, A271, A272, A300, A301, A302, A303, A304, A305, A330, A360, A361, A362, A363, A364, A365, A500, A700, A701, A702, A703, A704, A705, A706, A707, A710, A800, A801, A802, A803, A804, A810, A821, A900, A902; taken to Mike Phillips
|
Plan Reviewer's activity | | | 10/16/2006 | | DONE |
|
|
|
Faxed Modified review comments to architect.
|
Routing - FIRE | 10/12/2006 | | 10/13/2006 | | FAIL |
|
|
|
Faxed resubmittal items to architect. Attached review comments to plans.
|
Routing - PLAN CHECK | 10/9/2006 | | 10/12/2006 | | |
|
|
|
Routing to Fire
|
Routing - PLAN CHECK | 9/25/2006 | | 10/9/2006 | | FAIL |
|
|
|
Sent correction report to the architect, requesting additional information to be submitted for further review prior to issuing permit.
|
1st review completed | | | 10/9/2006 | | FAIL |
Mike Phillips
|
|
|
|
Routing - FIRE | 9/21/2006 | | 9/25/2006 | | FAIL |
|
|
|
Faxed resubmittal items to architect. Reviewed for water supply and access only.
|
Routing - PLAN CHECK | 9/6/2006 | | 9/21/2006 | | PEND |
|
|
|
PLANS ROUTED TO FIRE FOR ACCESS & WATER REQUIREMENTS ONLY. Review for all building code requirements not completed at this time.
|
Routing - PLANNING | 9/5/2006 | | 9/6/2006 | | FAIL |
|
|
|
Failed both DR and CU. Letter to be issued. DRH05-00397 and CUP05-00015.
|
Routing - PLUMBING | 8/30/2006 | | 9/5/2006 | | FAIL |
|
|
|
plans are incomplete, please address the above listed items.
|
Routing - Erosion and Sediment | 8/29/2006 | | 8/30/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 8/22/2006 | | 8/29/2006 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/15/2006 | | 8/28/2006 | | FAIL |
|
|
|
8/15/06 - Called Action Courrier for pick up 8/15/06 @ 12:30pm BAS. Original submittal includes structural for concrete package only.
8/28 - Concrete package review received. Review failed.
|
Routing - Addressing | 8/24/2006 | | 8/24/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 8/14/2006 | | 8/22/2006 | | FAIL |
|
|
|
Failed because parcels not combined
|
Plans ACCEPTED BY PLAN TECH | | | 8/14/2006 | | |
|
|
|
|
Application received | | | 8/11/2006 | | |
|
|
|
|
First Notice | 2/12/2020 | 2/12/2020 | | | |
Jim Storey
|
|
|
|
BLD-Footing | 11/16/2018 | 11/19/2018 | | A | |
Dave Hannah
|
|
|
per Lee has nothing to do with plan mod in review // Lee Phone #: ###-####
|