Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-02317
StatusFinaled
Name JORDAN-WILCOMB CO
Site Address 121 N PHILLIPPI ST
Project NameJORDAN PROPERTIES WAREHOUSE
Customer Number 
ePlanReviewNo
Description
(INTERMOUNTAIN GAS WAREHOUSE) The addition and existing building is fully sprinklered for allowable area increase. To build-out & finish a 12,000 sq.ft. portion of a 20,644 sq. ft. shell addition added to a previously existing 14,500 sq. ft. occupied warehouse classified by architect as "S2" occupancy under BLD06-00051, for Intermountain Gas and install new loading dock per approved plans. Work includes construction of interior wood frame walls to create an office, breakroom, two (2) fully accessible restrooms, a warehouse and multiple work areas for repair & cleanup of IMG meters and parts; to install suspended accoustical grid and gypsum board ceilings in portions of building per plan; furr and insulate portions of exterior and interior walls per plans; construct mechanical equipment platforms in two locations; an accessible route into and within the building to all areas; construct a spray finishing area with specific exhaust system; hooded exhaust systems at designated work areas & above battery charger area; and upgrade electrical, mechanical, plumbing, sprinkler & alarm systems to meet tenant needs and comply with current adopted codes and ordinances. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/11/200712/11/20072/27/2009 DONE
DetailsPatricia Smith
Second Notice has not been responded to.
Meeting  2/27/2009 DONE
Details
no final cert of value ever received - signed off per RAD
Second Notice BLD11/19/200711/19/200712/11/2007 DONE
First Notice has not been responded to.
First Notice 11/8/200711/19/2007 DONE
Permanent Occupancy  11/8/2007 DONE
BLD-Final10/12/200710/15/200710/15/2007APASS
DetailsTom Arcoraci
russ Phone #: ###-#### ok for perm
BLD-Aging Inspection10/3/200710/3/200710/7/2007 FAIL
DetailsDena Gambrel
10-5-07 Failed.
BLD-Aging Inspection5/17/20075/17/20075/17/2007 FAIL
DetailsDena Gambrel
5-25-07 Site inspection shows that the landscaping is in but I have not been called for an inspection. I have Cathy looking to see if bond was ever received for this location.
Code Occupancy Approval1/24/20071/24/20071/24/2007AFAIL
DetailsDena Gambrel
1-24-07 Failed...landscape not completely done.
BLD-Final1/24/20071/24/20071/24/2007PCANC
DetailsTom Arcoraci
John ; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Temporary occupancy  12/19/2006 DONE
Temp. Occ. Cert. # 5492 issued 12-19-06 to the Intermountain Gas Warehouse.
BLD-Framing/Rough-in12/14/200612/15/200612/15/2006PPASS
DetailsTom Arcoraci
John; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
BLD-Final12/15/200612/15/200612/15/2006PPART
DetailsTom Arcoraci
John; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett ok for temp after zoning
FIRE-Final Inspection12/13/200612/14/200612/14/2006APASS
DetailsTroy Cobbley
Fire life safety finaled
FIRE-Alarm Testing12/13/200612/14/200612/14/2006APASS
DetailsTroy Cobbley
The access controled egress door functioned correctly
FIRE-Final Inspection12/11/200612/12/200612/12/2006AFAIL
DetailsTroy Cobbley
Need to repair the two emergency lights, the access controled egress door does not meet IFC chapter 10 and the second fire extinguisher for the warehouse needs to be hung
FIRE-Final Inspection12/11/200612/11/200612/11/2006PCANC
DetailsTroy Cobbley
Not ready for inspection until fire alarm is complete
BLD-Other12/8/200612/8/200612/8/2006PPASS
DetailsTom Arcoraci
john - ceiling grid ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in11/27/200611/27/200611/27/2006PPASS
DetailsTom Arcoraci
JOHN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance10/30/200610/31/200610/31/2006APASS
DetailsTom Arcoraci
john - note: insulation ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in10/27/200610/27/200610/27/2006APASS
DetailsTom Arcoraci
ok to rock except required insulation walls
BLD-Framing/Rough-in10/26/200610/27/200610/27/2006ADEFR
DetailsTom Arcoraci
jon; Phone #: ###-#### Internet Inspection Request from: Patricia Sm
Issue PAID IN FULL permit  10/16/2006 DONE
Print Occupancy Form  10/13/2006 DONE
Telephone call  10/13/2006  
lft vm with maxey art ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  10/13/2006  
Routing - PLAN CHECK10/11/2006 10/12/2006 PASS
Inserted new electrical sheets into plans. No further submittals required. All other agencies have approved. Routing to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  10/12/2006 PASS
Plan assigned to (DRS)8/18/2006 10/12/2006 PASS
10/12/2006 15:51:08 DRS - activity updated through activity BLDA022 from case BLD06-02317.
Routing - PUBLIC WORKS10/9/2006 10/11/2006 PASS
Plan resubmittals received  10/10/2006  
Received 2 copies of the following sheets--E-0, E-1, E-2 and taken to Dan Stuart
Routing - PLAN CHECK10/5/2006 10/9/2006 FAIL
Routing plans back to public works for re-review.
Telephone call  10/9/2006 DONE
Called Bob Maxey to let him know fire had passed plans & they were routing back to public works for re-review. Pamela Williams has signed off on trash enclosure but Catherine Chertrudi has not heard from applicant. She had talked with Brian Murphy. I told Bob he needed to follow up to make sure plans would pass public works. Bob Maxey said he had talked with Bob Edwards on electrical plan resubmittals and he was almost ready to submit.
Telephone call  10/9/2006 DONE
Tlked with Catherine Chertrudi, PW to see if she had the information she needed to approved the IMG plans, 121 S. Phillipi. She had not. She had talked with Brian Murphy about her concerns - maintenance of monitoring wells at site (result of large spills in the 80's at the Chevron tank farm adjacent to the Phillipi site. Also suggested routing surface drainage toward Phillip rather than toward Bethel. Called Bob Maxey to have him follow up with his people handling this item.
Routing - FIRE10/2/2006 10/5/2006 PASS
Attached updated review comments to plans.
Telephone call  10/2/2006 DONE
Called Bob Maxey to see if he received my e-mail on needed electrical plan items for the IMG Warehouse project. He was not in today so I left message with staff member to have him call me if there are questions. I also ask if he had responded to PW concerns on the size of the Trash Enclosure.
Plan resubmittals requested  10/2/2006 DONE
E-mailed Bob Maxey concerning electrical plan upgrades showing interconnection between the paint booth ventilation system and the spraying ability and the need for the Automatic Lighting Control per the IECC not provided in resubmittals.
Routing - PLAN CHECK9/26/2006 10/2/2006 FAIL
Inserted new plan submittals of 9/21 & 9/29 into original plans and attached copies of architect, mechanical engineer and structural engineers responses to the plans. Attached copy of Hazardous Materials Inventory Report from Jane Rosen, Assessment and Compliance Services, one of our approved haz mat techs.Information concerning electrical connection of ventilation system to paint booth were not submitted and plans showing the required automatic lighting controls oer the IECC were not provided. I red-lined the new 2nd required exit out of the east wall on the elevations to match approximate location shown on Sheet A-2 resubmitted architects plan. Routing to fire code analyst for re-review. Sent e-mail to Bob Maxey on items still needing resubmittal.
Plan resubmittals received  9/29/2006  
Received 2 copies of all the following: 1pg. response, 5pg. Proposed Hazardous Material Storage, page A-2; taken to Dan Stuart
1st review completed  9/26/2006 FAIL
Failed plan check, public works & fire.
Routing - FIRE9/20/2006 9/26/2006 FAIL
Faxed resubmittal items to architect.
Plan resubmittals received  9/21/2006  
Received 2 copies of plan review report, 2 copies of the following sheets--G-1, A-2, A-3, A-6, A-7 and taken to Dan Stuart
Plan Reviewer's activity  9/20/2006 DONE
After discussing hazardous materials sample form with Scott Arellano, fire code analyst, I faxed a copy of a sample hazardous materials form for Bob to review and a copy of approved Technical Consultants for Hazardous Materials, received from Scott.
Routing - PLUMBING9/13/2006 9/19/2006 PASS
noted that premise protection required if not alraedy installed and point of use may be required.
Routing - PLAN CHECK8/29/2006 9/13/2006 FAIL
Resubmittals required. Faxed and e-mailed copy of plan review conditions needing to be addressed to architect. Routing plan to plumbing for review.
Plan resubmittals requested  9/13/2006 DONE
Faxed and e-mailed copy of plan review conditions needing to be addressed by architect.
Plan resubmittals received  9/6/2006 DONE
Received 3 copys of sheets E-0,E-1,E-2 taken to Dan S.
Routing - PLANNING8/28/2006 8/29/2006 PASS
Greg Johnson CZC06-00085
Routing - Erosion and Sediment8/24/2006 8/28/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS8/18/2006 8/24/2006 FAIL
Possible site contamination per Catherine Chertudi Public Works Environmental contact Catherine ###-####: Trash enclosures too small, not directly accessible. Contact Pam Williams ###-####:TRASH HAS BEEN APPROVED PER PAM WILLIAMS
Routing - Addressing8/18/2006 8/18/2006 PASS
Recd Pcfee & Taken To Pln CK  8/15/2006 DONE
Plans ACCEPTED BY PLAN TECH  8/15/2006  
Application received  8/11/2006