FIRE-Final Inspection | 7/8/2012 | 7/9/2012 | 7/12/2012 | A | PART |
Forrest France
|
|
|
Call prior to going Phone #: 6318646 >> Inspection requested via mobile web by Gil
|
DOC - Permit Finaled | | | 7/11/2012 | | DONE |
Christina Prado
|
|
|
Per Bob & Jason -- ok to final permit for garage only at crescent rim condos
|
BLD-Final | 7/9/2012 | 7/10/2012 | 7/10/2012 | A | CANC |
Tom Arcoraci
|
|
|
Call prior to going Phone #: 6318646 >> Inspection requested via mobile web by Gil
|
FIRE-Conference | 4/25/2012 | 4/25/2012 | 4/26/2012 | A | CANC |
Troy Cobbley
|
|
|
Bob phone #: ###-####
|
BLD-Aging Inspection | 2/7/2012 | 2/7/2012 | 2/7/2012 | | PEND |
Tom Arcoraci
|
|
|
|
Inspection Record Card- Bld | | | 1/11/2012 | | DONE |
|
|
|
|
BLD-Wall cover | 11/8/2011 | 11/8/2011 | 11/8/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/8/2011 | 11/8/2011 | 11/8/2011 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 8/9/2011 | 8/9/2011 | 8/9/2011 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 5/10/2011 | 5/11/2011 | 5/10/2011 | P | CANC |
Tom Arcoraci
|
|
|
We would like to meet with you and the fire inspector about egress from the pool area. Is it possible to get you both here at the same time? Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
|
BLD-Conference | 5/5/2011 | 5/6/2011 | 5/6/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 5/5/2011 | 5/6/2011 | 5/6/2011 | A | CANC |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 5/4/2011 | 5/5/2011 | 5/5/2011 | A | PASS |
Tom Arcoraci
|
|
|
2nd floor bldg 3 insulation. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Wall cover | 4/27/2011 | 4/28/2011 | 4/28/2011 | A | PASS |
Tom Arcoraci
|
|
|
Framing inspection for bldg 3 level 2. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Energy code compliance | 4/25/2011 | 4/26/2011 | 4/26/2011 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Framing/Rough-in | 4/22/2011 | 4/25/2011 | 4/25/2011 | A | PASS |
Tom Arcoraci
|
|
|
We are ready to cover the changes in the models. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Conference | 4/13/2011 | 4/14/2011 | 4/14/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 4/12/2011 | 4/14/2011 | 4/13/2011 | A | CANC |
Tom Arcoraci
|
|
|
|
BLD-Conference | 4/1/2011 | 4/11/2011 | 4/12/2011 | A | PASS |
Tom Arcoraci
|
|
|
talked on final issues
|
BLD-Conference | 4/1/2011 | 4/1/2011 | 4/1/2011 | P | PASS |
Tom Arcoraci
|
|
|
Tom, Call me when you head this way. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Aging Inspection | 2/28/2011 | 2/28/2011 | 2/28/2011 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 12/27/2010 | 12/27/2010 | 12/27/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/25/2010 | 10/25/2010 | 10/25/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 8/23/2010 | 8/23/2010 | 8/23/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 6/22/2010 | 6/23/2010 | 6/23/2010 | P | CANC |
Tom Arcoraci
|
|
|
Building 2 fourth floor insulation inspection. Please call to coordinate Inspection requested from web by: Bob Thornton Phone #: ###-#### should 06-02323
|
BLD-Aging Inspection | 5/31/2010 | 5/31/2010 | 6/2/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 3/29/2010 | 3/29/2010 | 3/29/2010 | | PASS |
Tom Arcoraci
|
|
|
|
Case Summary (BLD) | | | 3/15/2010 | | DONE |
|
|
|
|
BLD-Aging Inspection | 1/26/2010 | 1/26/2010 | 1/26/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 11/23/2009 | 11/23/2009 | 11/23/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/23/2009 | 11/23/2009 | 11/23/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/22/2009 | 9/22/2009 | 9/22/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 6/24/2009 | 6/25/2009 | 6/25/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 6/1/2009 | 6/1/2009 | 6/1/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 3/30/2009 | 3/30/2009 | 3/30/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/26/2009 | 1/26/2009 | 1/26/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/24/2008 | 11/24/2008 | 11/24/2008 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 9/24/2008 | 9/24/2008 | 9/24/2008 | P | PASS |
Jim Sly
|
|
|
Bob ###-####
|
BLD-Energy code compliance | 9/23/2008 | 9/24/2008 | 9/23/2008 | P | PART |
Jim Sly
|
|
|
If you have issues call Zac @ ###-####. Dennis from Johnson Drywall is ###-####. Phone #: ###-#### Internet Inspection Request from: Bob Thornton 4 units ...1st floor OK
|
BLD-Conference | 9/22/2008 | 9/24/2008 | 9/23/2008 | P | CANC |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Conference | 9/22/2008 | 9/24/2008 | 9/23/2008 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Conference | 9/22/2008 | 9/23/2008 | 9/23/2008 | P | PART |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Thornton OK to insulate 4 units ....main floor Bldg 3....OK to rock 4th floor ceilings.
|
BLD-Conference | 9/22/2008 | 9/23/2008 | 9/23/2008 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Conference | 9/22/2008 | 9/22/2008 | 9/22/2008 | P | DONE |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Conference | 9/19/2008 | 9/19/2008 | 9/19/2008 | P | DONE |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Thornton C/N Talked about maintaining integrety of 1hr walls where ducts or vents run through.
|
BLD-Wall cover | 9/17/2008 | 9/18/2008 | 9/18/2008 | A | FAIL |
Jim Sly
|
|
|
I would like to inspect 1st floor bldg 3 units to insulate and sheetrock. Phone #: ###-#### Internet Inspection Request from: Bob Thornton Looked at 4 unit in Bldg #3.....Need all UL listings for all trade.... ceiling and wall penitrations...... Need listing for protection pads on plumbing washer boxes.....Dryer box and ducting in 1hr wall....Architect to address......OK to insulate and add channel to ceiling only......Check for fireblocking at double walls (at ceiling line).
|
BLD-Framing/Rough-in | 9/10/2008 | 9/10/2008 | 9/10/2008 | P | PART |
Mike Jordan
|
|
|
ok to prerock 2nd floor corridor lids.
|
BLD-Framing/Rough-in | 9/9/2008 | 9/10/2008 | 9/10/2008 | A | CANC |
Mike Jordan
|
|
|
Re-inspect the 2nd floor corridor ceiling for pre-rock on bldg 3. Phone #: ###-#### Internet Inspection Request from: Bob Thornton. reshduled for this afternoon.
|
BLD-Conference | 9/4/2008 | 9/5/2008 | 9/5/2008 | A | PASS |
Jim Storey
|
|
|
Inspect bldg 3 corridors for pre-rock on 2nd and 3rd floor. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Conference | 9/1/2008 | 9/2/2008 | 9/2/2008 | A | PART |
Jim Sly
|
|
|
Inspect roof trusses. Call me when you are on your way. Phone #: ###-#### Internet Inspection Request from: Bob Thornton Preliminary truss inspection prior to pre-rock and frame inspection....Trusses appear OK in Bldg #2 & #3.
|
BLD-Conference | 8/28/2008 | 8/29/2008 | 8/29/2008 | A | DONE |
Mike Jordan
|
|
|
Look at the 4th floor ceiling in bldg 3 for pre-rock. Phone #: ###-#### Internet Inspection Request from: Bob Thornton. Contractor wants to change termination piont of refuse chute. Wants to terminate at 4th floor ceiling instead of continueing thru roof deck. Noted to contractor to have architect submit new detail to plan review for approval.
|
BLD-Framing/Rough-in | 8/29/2008 | 8/29/2008 | 8/29/2008 | A | PART |
Mike Jordan
|
|
|
Look at the 4th floor ceiling in bldg 3 for pre-rock. Phone #: ###-#### Internet Inspection Request from: Bob Thornton. ok to pre rock 4th floor corridor flat ceiling areas only.
|
BLD-Conference | 8/22/2008 | 8/22/2008 | 8/22/2008 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Thornton.. On site to review opening protection for can lights in floor ceiling assemblies, a second layer of 5/8 type X needs added for box outs, firecaulk seems. Also inspected lid on 4thfloor corridor for pre rock, some areas still need to be firecaulked, and some additional straps need to be added at roof drain penetrations through top plates.
|
BLD-Framing/Rough-in | 8/4/2008 | 8/5/2008 | 8/5/2008 | A | PART |
Mike Jordan
|
|
|
Let look at 4th floor areas to pre rock and review the can lights Phone #: ###-#### Internet Inspection Request from: Bob Thornton. Talk to contractor about can lights in floor ceiling assembly and required protection.
|
BLD-Conference | 7/17/2008 | 7/17/2008 | 7/17/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 7/9/2008 | 7/9/2008 | 7/9/2008 | A | PART |
Tom Arcoraci
|
|
|
Covering the 1st floor corridor ceiling Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok
|
BLD-Conference | 6/26/2008 | 6/30/2008 | 6/30/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 6/26/2008 | 6/27/2008 | 6/27/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 6/25/2008 | 6/26/2008 | 6/26/2008 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
Meeting | | | 5/15/2008 | | DONE |
|
|
|
Meeting with Dave Hanneman, Mark Senteno, Treasure Valley Fire Protection, Bryan Johnson and Sam Rogers regarding FDC and standpipe issues.
The Fire Marshal, Dave Hanneman, has agreed to allow the dry standpipe throughout the parking garage and respective stairwells within buildings #2 & #3. The location of the FDC for the fire sprinkler system serving building 2 & 3 will be located at the southeast portion of building #3 at grade level, within 100 feet of the approved fire department vehicle access roadway, accessed from the northeast property entrance, along Crescent Rim Drive. Approved signage shall be installed along Crescent Rim Drive at this northeast driveway entrance directing FD personnel to the FDC location to the South of building #3. An additional FD approved sign shall be located at the southeast corner of building #3, directing FD personnel to the FDC location south of building #3.
|
BLD-Framing/Rough-in | 5/8/2008 | 5/8/2008 | 5/8/2008 | P | PART |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Framing/Rough-in | 5/7/2008 | 5/8/2008 | 5/8/2008 | A | PART |
Tom Arcoraci
|
|
|
Look at shear walls and framing progress. Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok
|
BLD-Framing/Rough-in | 4/25/2008 | 4/25/2008 | 4/25/2008 | P | PART |
Tom Arcoraci
|
|
|
wip ok shesr
|
BLD-Framing/Rough-in | 4/24/2008 | 4/25/2008 | 4/25/2008 | A | PART |
Tom Arcoraci
|
|
|
Look at shear walls and progress. Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok 408
|
BLD-Conference | 4/9/2008 | 4/11/2008 | 4/11/2008 | P | PASS |
Tom Arcoraci
|
|
|
The Architect would like to meet with us Friday, preferably after 1:30, to discuss the 2 hour assembly at the south stairs. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Conference | 4/9/2008 | 4/9/2008 | 4/9/2008 | P | PASS |
Tom Arcoraci
|
|
|
I need to talk to you about installation of the HM jam in the 2 hour shaft. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Conference | 3/27/2008 | 3/27/2008 | 3/27/2008 | P | PASS |
Tom Arcoraci
|
|
|
Lets talk about stair landings. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Conference | 3/25/2008 | 3/25/2008 | 3/25/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 3/24/2008 | 3/25/2008 | 3/25/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 3/14/2008 | 3/14/2008 | 3/14/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 3/12/2008 | 3/14/2008 | 3/14/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 3/13/2008 | 3/13/2008 | 3/13/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 3/10/2008 | 3/14/2008 | 3/13/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 3/10/2008 | 3/12/2008 | 3/12/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 3/7/2008 | 3/10/2008 | 3/10/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 3/6/2008 | 3/7/2008 | 3/7/2008 | A | PASS |
Tom Arcoraci
|
|
|
Will you meet with me and the framer to discuss shear wall etc. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Aging Inspection | 1/9/2008 | 1/9/2008 | 1/9/2008 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 9/28/2007 | 9/28/2007 | 9/28/2007 | P | PASS |
Tom Arcoraci
|
|
|
Lets talk about penetrations etc. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Aging Inspection | 8/30/2007 | 8/30/2007 | 8/30/2007 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 5/21/2007 | 5/21/2007 | 5/21/2007 | | PASS |
Tom Arcoraci
|
|
|
wip
|
Plan resubmittals received | | | 3/15/2007 | | |
|
|
|
received transmittal letter from erstad arch & "3" sets of plans including S3.01, S3.03, S3.04, S2.05, S2.06-F, S2.06-R, S2.11, S2.12-F, S2.12-R---plans taken to mike phillips
|
BLD-Foundation | 3/13/2007 | 3/14/2007 | 3/14/2007 | A | PASS |
Tom Arcoraci
|
|
|
Special inspection by Strata. Pour at noon Phone #: ###-#### wip ok
|
BLD-Foundation | 3/7/2007 | 3/9/2007 | 3/9/2007 | A | PASS |
Tom Arcoraci
|
|
|
Pouring walls at noon. Special inspection by Strata Phone #: ###-####
|
BLD-Footing | 2/5/2007 | 2/6/2007 | 2/6/2007 | A | PART |
Tom Arcoraci
|
|
|
Pouring at noon. Special inspection by Strata as always. Phone #: ###-#### spec insp
|
BLD-Footing | 1/30/2007 | 1/31/2007 | 1/31/2007 | P | PASS |
Tom Arcoraci
|
|
|
###-#### spec insp
|
BLD-Footing | 1/30/2007 | 1/31/2007 | 1/31/2007 | A | PASS |
Tom Arcoraci
|
|
|
###-#### Bob spec insp
|
BLD-Footing | 1/26/2007 | 1/29/2007 | 1/29/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/26/2007 at 3:29:54 PM. spec insp
|
Telephone call | | | 1/26/2007 | | |
|
|
|
spoke with Bob from CRC LLC (a general contractor) told him only Holm construction can schedule inspection on this permit
|
(F) Reprint permit | | | 12/21/2006 | | |
|
|
|
|
Plan assigned to (M_P) | 8/14/2006 | 8/14/2006 | 12/20/2006 | | PASS |
|
|
|
12/20/2006 09:56:24 M_P - activity updated through activity BLDA022 from case BLD06-02320.
|
Routing - PLANNING | 12/18/2006 | | 12/20/2006 | | PASS |
|
|
|
Approved per the DR and the CUP.
|
Routing - PLAN CHECK | 12/20/2006 | | 12/20/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/20/2006 | | |
|
|
|
|
Telephone call | | | 12/20/2006 | | DONE |
|
|
|
called ###-#### and left message for Dave Holm that permit is ready
|
Permit Ready to Issue | | | 12/20/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/20/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/15/2006 | | 12/18/2006 | | |
|
|
|
Routing to Planning.
|
Routing Off Site - STRUCTURAL | 12/8/2006 | | 12/18/2006 | | PASS |
|
|
|
Called Action Courier for pick up @8:52 on 12/8/06 BAS
|
Routing - PLAN CHECK | 12/12/2006 | | 12/15/2006 | | PEND |
|
|
|
Waiting for others to approve prior toissuing permit.
|
Routing Off Site - STRUCTURAL | 12/14/2006 | | 12/15/2006 | | PASS |
|
|
|
Called action Courier for pick up of 1 structural calcs book volume 2///12/14/06 @ 3:55
|
Routing - FIRE | 12/15/2006 | | 12/15/2006 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLUMBING | 12/11/2006 | | 12/12/2006 | | PASS |
|
|
|
Resubmittals from Bob Tikker. garage only. see bld06-02316 for review comments
|
Plan resubmittals received | | | 12/11/2006 | | |
|
|
|
Received three copies of the following pages: A300, A310, A320, A321. Received 4 copies of the following pages: C3.1, C5.0; taken to Mike Phillips
|
Routing - PLANNING | 12/4/2006 | | 12/8/2006 | | FAIL |
|
|
|
Sarah SchaferSarah Schafer
Failed DR and CUP review. Letter being sent to applicant with explination. Still needs drainage easement shown on plans, elevations that match DR approved, pork chop in Peasly Dr.
|
Routing - PLANNING Land Div | 12/8/2006 | | 12/8/2006 | | PASS |
|
|
|
Approved. Parcels are combined.
|
Plan resubmittals received | | | 12/8/2006 | | |
|
|
|
Received 4 copies of pages M100, M200, M201, M202, M203; taken to Mike Phillips
|
Plan resubmittals received | | | 12/8/2006 | | |
|
|
|
Received 2 copies of structural calcs for wood permit submittal- volumes 1 & 2, 3 copies of the following sheets--S2.07, S2.08, S2.09, S2.10, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.18W, S2.19, S2.20, S2.21, S5.00, S5.01, S5.02, S5.03, S5.04, S6.00, S1.00, S1.01, S2.01W, S2.02, S2.03, S2.04, S2.06W and 1 set of everything sent to outside Structural engineer and the rest taken to Mike Phillips
|
Plan resubmittals received | | | 12/7/2006 | | |
|
|
|
Received 4 copies of sheets A001, A200, A201, A205, A206, A211, A212, A217, A218 and taken to Mike Phillips
|
Plan resubmittals received | | | 12/6/2006 | | |
|
|
|
Received 3 sets of DR meeting of floor plan & elevations and taken tot Mike Phillips
|
Routing - PLUMBING | 12/4/2006 | | 12/4/2006 | | FAIL |
|
|
|
no plans
|
Plan resubmittals received | | | 12/4/2006 | | DONE |
|
|
|
Received Structural Engineer resubmittals in the form of 1 cover letter; 1 copy of responses to building review comments w/additional structural calculations; 1 copy of geotechnical addendum dated 7/7/06. Copy given to Mike Phillips and sent to outside engineer for review.
|
Routing - PLAN CHECK | 10/16/2006 | | 12/4/2006 | | |
|
|
|
Routing resubmittals to plumbing, planning, land division and fire.
|
Plan resubmittals received | | | 11/24/2006 | | |
|
|
|
Inserted new sheet into the plans on 11/28/06/ Received transmittal sheet, three copies of 12pg. letter of response, three copies of application for Project Start Up for Special Inspections, 2pg. repsonse letter from Tikker Eng., 11pg. electrical response, 17pgs. on Fire Suppression, two copies of the following pages: FP100, FP101, FP102, FP103, FP104, FP105, FP106, FP107, FP108, FP109, FP110; four copies of the following pages: L101, M500, M504, M509, M514, E1.9, E2.1.1L, E2.2.0L, E2.2.1L, E2.3.0L, E2.3.1L, E2.4.1L; five copies of the following pages: A001, A002, A003, A010, A011, A012, A013, A014, A100, A101, A102, A110, A111, A112, A113, A114, A115, A200, A201, A202, A203, A204, A205, A206, AA207, A208, A209, A210, A211, A212, A213, A214, A215, A216, A217, A218, A219, A220, A221, A230, A231, A232, A233, A234, A235, A236, A237, A238, A239, A240, A241, A242, A243, A244, A245, A246, A247, A248, A249, A260, A261, A262, A270, A271, A272, A300, A301, A302, A303, A304, A305, A330, A360, A361, A362, A363, A364, A365, A500, A700, A701, A702, A703, A704, A705, A706, A707, A710, A800, A801, A802, A803, A804, A810, A821, A900, A902; taken to Mike Phillips
|
Routing - FIRE | 10/12/2006 | | 10/16/2006 | | FAIL |
|
|
|
Faxed review / resubmittal items comments to architect.
|
1st review completed | | | 10/16/2006 | | FAIL |
Mike Phillips
|
|
|
|
Routing - PLAN CHECK | 9/25/2006 | | 10/12/2006 | | FAIL |
|
|
|
Plan review completed, sent correction report to the architect requesting additional information be submitted for further review prior to issuing permit.
|
Routing - FIRE | 9/21/2006 | | 9/25/2006 | | FAIL |
|
|
|
Faxed resubmittal items to architect. Reviewed for water supply and access only.
|
Routing - PLAN CHECK | 9/6/2006 | | 9/21/2006 | | PEND |
|
|
|
PLANS ROUTED TO FIRE FOR ACCESS & WATER REQUIREMENTS ONLY. Review for all building code requirements not completed at this time.
|
Routing - PLANNING | 9/5/2006 | | 9/6/2006 | | FAIL |
|
|
|
Failed both DR and CU. Letter to be issued. DRH05-00397 and CUP05-00015.
|
Routing - PLUMBING | 8/30/2006 | | 9/5/2006 | | FAIL |
|
|
|
plans are incomplete, please address the above listed items.
|
Routing - Erosion and Sediment | 8/29/2006 | | 8/30/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 8/22/2006 | | 8/29/2006 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/15/2006 | | 8/28/2006 | | FAIL |
|
|
|
8/15/06 - Called Action Courrier for pick up 8/15/06 @ 12:30pm BAS. Original submittal includes structural for concrete package only.
8/28 - Concrete package review received. Review failed.
|
Routing - Addressing | 8/24/2006 | | 8/24/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 8/14/2006 | | 8/22/2006 | | FAIL |
|
|
|
Failed because parcels not combined.
|
Plan routing begun/NEW & ADDTN | | | 8/14/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/14/2006 | | |
|
|
|
|
Application received | | | 8/11/2006 | | |
|
|
|
|