Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD06-02321
StatusIssued
Name CRB LLC
Site Address 51 S PEASLEY ST
Project NameCRESCENT RIM #4-PARKING
Customer Number 
ePlanReviewNo
Description
(RCE 19740 CRB LLC) (CRESCENT RIM PARKING GARAGE BLDG # 4) To construct a new 18,955 square feet, enclosed, basement parking garage, below a three hour horizontal assembly per IBC Section 508.2, the installation of a NFPA 13 fire sprinkler system is required through out this structure. NOTE: This permit is for a shell only and includes under floor plumbing, electrical refer to BLD06-02901 for grading permit. All additional work which includes: interior finishes, electrical, plumbing and mechanical shall be completed under BLD 06-02322. MJP CUP 05-00015 * DRH 05-00397
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection12/6/201712/7/201712/7/2017ACANC
DetailsTroy Cobbley
Come anytime. Call when you head our way Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
BLD-Ceiling Grid Inspection9/6/20179/7/20179/7/2017APASS
DetailsJim Sly
3rd floor ceiling grid Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Conference9/6/20179/6/20179/6/2017PDONE
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Other6/9/20166/10/20166/10/2016APART
DetailsJim Sly
Call me when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
Exterior and select interior shear nailing ........Straps and Hold downs OK on North wing.....1st floor only.
BLD-Aging Inspection10/22/201510/22/201510/22/2015 PEND
DetailsPhil Shearer
BLD-Aging Inspection7/23/20157/23/20157/23/2015 PEND
DetailsPhil Shearer
BLD-Aging Inspection4/22/20154/22/20154/22/2015 PEND
DetailsPhil Shearer
BLD-Aging Inspection1/21/20151/21/20151/21/2015 PEND
DetailsPhil Shearer
BLD-Aging Inspection10/22/201410/22/201410/22/2014 PART
DetailsPhil Shearer
Work in progress
BLD-Aging Inspection4/18/20144/18/20144/18/2014 PEND
DetailsTom Arcoraci
BLD-Aging Inspection1/17/20141/17/20141/21/2014 PEND
DetailsTom Arcoraci
BLD-Aging Inspection10/9/201310/9/201310/9/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection7/10/20137/10/20137/10/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection4/10/20134/10/20134/10/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection1/9/20131/9/20131/9/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection10/10/201210/10/201210/10/2012 PEND
DetailsTom Arcoraci
BLD-Aging Inspection7/11/20127/11/20127/11/2012 PEND
DetailsTom Arcoraci
BLD-Aging Inspection4/11/20124/11/20124/11/2012 PEND
DetailsTom Arcoraci
BLD-Aging Inspection1/11/20121/11/20121/11/2012 PASS
DetailsTom Arcoraci
Inspection Record Card- Bld  1/11/2012 DONE
BLD-Aging Inspection10/12/201110/12/201110/12/2011 PASS
DetailsTom Arcoraci
BLD-Aging Inspection7/13/20117/13/20117/13/2011 PASS
DetailsTom Arcoraci
BLD-Aging Inspection4/11/20114/11/20114/11/2011 PASS
DetailsTom Arcoraci
BLD-Aging Inspection2/7/20112/7/20112/7/2011 PEND
DetailsTom Arcoraci
BLD-Aging Inspection12/6/201012/6/201012/6/2010 PART
DetailsTom Arcoraci
BLD-Aging Inspection10/4/201010/4/201010/4/2010 PART
DetailsTom Arcoraci
BLD-Aging Inspection8/2/20108/2/20108/2/2010 PART
DetailsTom Arcoraci
BLD-Aging Inspection5/31/20105/31/20106/2/2010 PASS
DetailsTom Arcoraci
BLD-Aging Inspection3/29/20103/29/20103/29/2010 PASS
DetailsTom Arcoraci
Case Summary (BLD)  3/15/2010 DONE
BLD-Aging Inspection1/26/20101/26/20101/26/2010 PASS
DetailsTom Arcoraci
BLD-Conference11/24/200911/24/200911/24/2009PPASS
DetailsTom Arcoraci
BLD-Aging Inspection11/24/200911/24/200911/24/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection9/22/20099/22/20099/22/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection7/20/20097/20/20097/20/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection5/18/20095/18/20095/18/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection3/16/20093/16/20093/16/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection1/12/20091/12/20091/12/2009 NR
DetailsTom Arcoraci
BLD-Aging Inspection11/11/200811/11/200811/12/2008 PASS
DetailsTom Arcoraci
BLD-Aging Inspection6/10/20086/10/20086/10/2008 PASS
DetailsTom Arcoraci
BLD-Aging Inspection3/3/20083/3/20083/3/2008 PASS
DetailsTom Arcoraci
BLD-Footing1/2/20081/2/20081/2/2008PPASS
DetailsTom Arcoraci
Special inspection by Strata Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Aging Inspection11/5/200711/5/200711/5/2007 NR
DetailsTom Arcoraci
BLD-Aging Inspection9/3/20079/3/20079/4/2007 NR
DetailsTom Arcoraci
BLD-Aging Inspection6/4/20076/4/20076/4/2007 NR
DetailsTom Arcoraci
BLD-Aging Inspection4/4/20074/4/20074/4/2007 PASS
DetailsTom Arcoraci
not ready
(F) Reprint permit  12/21/2006  
Plan assigned to (M_P)8/14/20068/14/200612/20/2006 PASS
12/20/2006 09:59:19 M_P - activity updated through activity BLDA022 from case BLD06-02321.
Routing - PLAN CHECK12/20/2006 12/20/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/20/2006 DONE
Inspection Record Card- Bld  12/20/2006 DONE
Telephone call  12/20/2006  
called ###-#### and left message for Dave Holm that permit is ready
Permit Ready to Issue  12/20/2006 DONE
Issue PAID IN FULL permit  12/20/2006 DONE
Routing - PLANNING12/18/2006 12/19/2006 PASS
Approved per the DR and the CUP.
Routing - PLAN CHECK12/15/2006 12/18/2006  
Routing to Planning.
Routing Off Site - STRUCTURAL12/4/2006 12/18/2006 PASS
8-1/2" x 11" resubmittals received 12/4/06 sent to outside engineer via Action Couriers.
Routing - PLAN CHECK12/12/2006 12/15/2006 PEND
Waiting for others to approve prior toissuing permit.
Routing Off Site - STRUCTURAL12/14/2006 12/15/2006 PASS
Called action Courier for pick up of 1 structural calcs book volume 2///12/14/06 @ 3:55
Routing - FIRE12/15/2006 12/15/2006 PASS
Attached updated review comments to plans.
Routing - PLUMBING12/11/2006 12/12/2006 PASS
Resubmittals from Bob Tikker. garage only. see bld06-02316 for review comments.
Plan resubmittals received  12/11/2006  
Received three copies of the following pages: A300, A310, A320, A321. Received 4 copies of the following pages: C3.1, C5.0; taken to Mike Phillips
Plan resubmittals received  12/8/2006  
Received 4 copies of pages M100, M200, M201, M202, M203; taken to Mike Phillips
Plan resubmittals received  12/8/2006  
Received 2 copies of structural calcs for wood permit submittal- volumes 1 & 2, 3 copies of the following sheets--S2.07, S2.08, S2.09, S2.10, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.18W, S2.19, S2.20, S2.21, S5.00, S5.01, S5.02, S5.03, S5.04, S6.00, S1.00, S1.01, S2.01W, S2.02, S2.03, S2.04, S2.06W and 1 set of everything sent to outside Structural engineer and the rest taken to Mike Phillips
Routing - PLANNING12/4/2006 12/8/2006 FAIL
Sarah Schafer
Failed DR and CUP review. Letter being sent to applicant with explination. Still needs drainage easement shown on plans, elevations that match DR approved, pork chop in Peasly Dr.
Routing - PLANNING Land Div12/8/2006 12/8/2006 PASS
Approved.
Plan resubmittals received  12/7/2006  
Received 4 copies of sheets A001, A200, A201, A205, A206, A211, A212, A217, A218 and taken to Mike Phillips
Plan resubmittals received  12/6/2006  
Received 3 sets of DR meeting of floor plan & elevations and taken tot Mike Phillips
Plan resubmittals received  12/4/2006 DONE
Received Structural Engineer resubmittals in the form of 1 cover letter; 1 copy of responses to building review comments w/additional structural calculations; 1 copy of geotechnical addendum dated 7/7/06. Copy given to Mike Phillips and sent to outside engineer for review.
Routing - PLUMBING12/4/2006 12/4/2006 FAIL
no plans
Routing - PLAN CHECK10/16/2006 12/4/2006  
Routing resubmittals to plumbing, planning, land division and fire.
Plan resubmittals received  11/24/2006  
Inserted new sheet into the plans on 11/28/06/ Received transmittal sheet, three copies of 12pg. letter of response, three copies of application for Project Start Up for Special Inspections, 2pg. repsonse letter from Tikker Eng., 11pg. electrical response, 17pgs. on Fire Suppression, two copies of the following pages: FP100, FP101, FP102, FP103, FP104, FP105, FP106, FP107, FP108, FP109, FP110; four copies of the following pages: L101, M500, M504, M509, M514, E1.9, E2.1.1L, E2.2.0L, E2.2.1L, E2.3.0L, E2.3.1L, E2.4.1L; five copies of the following pages: A001, A002, A003, A010, A011, A012, A013, A014, A100, A101, A102, A110, A111, A112, A113, A114, A115, A200, A201, A202, A203, A204, A205, A206, AA207, A208, A209, A210, A211, A212, A213, A214, A215, A216, A217, A218, A219, A220, A221, A230, A231, A232, A233, A234, A235, A236, A237, A238, A239, A240, A241, A242, A243, A244, A245, A246, A247, A248, A249, A260, A261, A262, A270, A271, A272, A300, A301, A302, A303, A304, A305, A330, A360, A361, A362, A363, A364, A365, A500, A700, A701, A702, A703, A704, A705, A706, A707, A710, A800, A801, A802, A803, A804, A810, A821, A900, A902; taken to Mike Phillips
Routing - FIRE10/12/2006 10/16/2006 FAIL
Faxed review comments to architect. Attached review comments to plans.
Routing - PLAN CHECK10/10/2006 10/12/2006  
Routing to fire
Routing - PLAN CHECK9/25/2006 10/10/2006 FAIL
Plan review completed, sent correction report to the architect requesting additional information to be submitted for further review prior to issuing permit.
1st review completed  10/10/2006 FAIL
DetailsMike Phillips
Routing - FIRE9/21/2006 9/25/2006 FAIL
Faxed resubmittal items to architect. Reviewed for water supply and access only.
Routing - PLAN CHECK9/6/2006 9/21/2006 PEND
PLANS ROUTED TO FIRE FOR ACCESS & WATER REQUIREMENTS ONLY. Review for all building code requirements not completed at this time.
Routing - PLANNING9/5/2006 9/6/2006 FAIL
Failed both DR and CU. Letter to be issued. DRH05-00397 and CUP05-00015.
Routing - PLUMBING8/30/2006 9/5/2006 FAIL
plans are incomplete, please address the above listed items.
Routing - Erosion and Sediment8/29/2006 8/30/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS8/22/2006 8/29/2006 PASS
Routing Off Site - STRUCTURAL8/15/2006 8/28/2006 FAIL
8/15/06 - Called Action Courrier for pick up 8/15/06 @ 12:30pm BAS. Original submittal includes structural for concrete package only.
8/28 - Concrete package review received. Review failed.
Routing - Addressing8/24/2006 8/24/2006 PASS
Routing - PLANNING Land Div8/14/2006 8/22/2006 FAIL
Failed because parcels not combined.
Plan routing begun/NEW & ADDTN  8/14/2006  
Plans ACCEPTED BY PLAN TECH  8/14/2006  
Application received  8/11/2006