|
Received 2 copies of structural calcs for wood permit submittal- volumes 1 & 2, 3 copies of the following sheets--S2.07, S2.08, S2.09, S2.10, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.18W, S2.19, S2.20, S2.21, S5.00, S5.01, S5.02, S5.03, S5.04, S6.00, S1.00, S1.01, S2.01W, S2.02, S2.03, S2.04, S2.06W and 1 set of everything sent to outside Structural engineer and the rest taken to Mike Phillips
|
|
Inserted new sheet into the plans on 11/28/06/ Received transmittal sheet, three copies of 12pg. letter of response, three copies of application for Project Start Up for Special Inspections, 2pg. repsonse letter from Tikker Eng., 11pg. electrical response, 17pgs. on Fire Suppression, two copies of the following pages: FP100, FP101, FP102, FP103, FP104, FP105, FP106, FP107, FP108, FP109, FP110; four copies of the following pages: L101, M500, M504, M509, M514, E1.9, E2.1.1L, E2.2.0L, E2.2.1L, E2.3.0L, E2.3.1L, E2.4.1L; five copies of the following pages: A001, A002, A003, A010, A011, A012, A013, A014, A100, A101, A102, A110, A111, A112, A113, A114, A115, A200, A201, A202, A203, A204, A205, A206, AA207, A208, A209, A210, A211, A212, A213, A214, A215, A216, A217, A218, A219, A220, A221, A230, A231, A232, A233, A234, A235, A236, A237, A238, A239, A240, A241, A242, A243, A244, A245, A246, A247, A248, A249, A260, A261, A262, A270, A271, A272, A300, A301, A302, A303, A304, A305, A330, A360, A361, A362, A363, A364, A365, A500, A700, A701, A702, A703, A704, A705, A706, A707, A710, A800, A801, A802, A803, A804, A810, A821, A900, A902; taken to Mike Phillips
|