Permit Information
Permit NumberBLD06-02322
StatusFinaled
Name CRESCENT RIM OWNERS ASSOC INC
Site Address 3075 W CRESCENT RIM DR
Project NameCrescent Rim Condos Bldg #1
Customer Number 
ePlanReviewYes
Description
(CRESCENT RIM RESIDENTIAL CONDOMINIUM BUILDING #1 – THREE STORIES ABOVE EXISTING GARAGE – DRH18-00199, DRH05-00397, AND CUP05-00015) ""A SMOKE DETECTOR TIED INTO THE ALARM SYSTEM WILL BE ADDED TO THE BOILER ROOM WITH NO SMOKE DAMPER BEING REQUIRED IN THE PARKING GARAGE CDM 1/21/20"" The NFPA 13-R fire sprinkler system is used for occupancy. This project description replaces all previous descriptions. The work is required to comply with all applicable codes and ordinances in effect on August 14, 2006, the date of the original permit application (Two-way communication at the elevators was not required by the 2003 IBC, water-resistant gypsum board was allowed by the 2003 IBC as a base for tile in showers, and smoke dampers were not required by the 2003 IBC at transfer grilles in incidential use separation enclosures where the fire sprinkler system substitutes for fire barriers. Since the 2003 IBC governs, these conclusions are valid regardless of what the plan review report says.). To construct a 3 story, 50,036 square foot residential apartment building (20,052 square feet 1st story, 18,917 square feet 2nd story, and 11,067 square feet 3rd story) on top of an existing 17,731 square foot basement parking garage (S-2 Occupancy with an occupant load of 77). The basement, footings, stem walls, piers, and concrete slabs were constructed under permit BLD06-02316. There will be 19 dwelling units within this building. There will be one Type A dwelling unit and 18 Type B dwelling units. The work is to include exterior wood stud bearing walls, interior wood stud bearing walls, wood beams, wood columns, steel beams, steel columns, wood shear walls with hold downs, wood joist floor systems, wood truss roof systems, wood trellises, synthetic slate roof shingles, mechanically fastened single ply roofing at flat roof areas, roof drains and overflow drains or scuppers at flat roofs, exterior portland cement stucco, exterior manufactured stone veneer, interior 1-hr corridors, interior 1-hr stairway enclosures, interior 2-hr stairway enclosure, a 2-hr elevator shaft, a 1-hr trash chute shaft enclosure with 1-hr trash room, interior doors, exterior doors, exterior windows, gas fireplaces, millwork, and finishes. Exterior fences, concrete stairways, sidewalks, and guards will also be constructed. Special Inspection is required for welding, bolting, wind resistance, seismic resistance, wood diaphragms, post installed anchors in hardened concrete, and fire-resistance-rated coatings. Before any holes are drilled through or into the post tensioned concrete deck, the deck is required to be scanned (e.g. ground penetrating radar) to precisely determine the location of concrete reinforcement. No concrete reinforcement is allowed to be cut, including post tensioned cables. This requirement applies to holes for anchor bolts, plumbing pipes, electrical conduit, etc. The design for engineered wood trusses is a deferred submittal item. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R (NFPA 13 for the basement parking garage) and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  2/13/2020 DONE
Uploaded Special Inspection and Structural Observation letters
FIRE-Final Inspection2/12/20202/12/20202/12/2020PPASS
DetailsTroy Cobbley
Life safety passed.

Lee Phone #: ###-####
BLD-Final2/12/20202/12/20202/12/2020PPASS
DetailsJim Storey
Lee Scott Phone #: ###-####
Permanent Occupancy  2/12/2020 DONE
Zoning Approval2/7/20202/7/20202/7/2020 PASS
DetailsJosh Wilson
Final ok JGW 2-7-20
BLD-Final1/30/20201/31/20202/3/2020PNR
DetailsJim Storey
lee Phone #: ###-####
BLD-Final2/3/20202/3/20202/3/2020PNR
DetailsJim Storey
Lee Phone #: ###-####
BLD-Final1/30/20201/30/20201/30/2020PPART
DetailsJim Storey
lee Phone #: ###-####
BLD-Other1/27/20201/28/20201/28/2020APASS
DetailsDave Hannah
fire culking in garage // Lee Scott Phone #: ###-#### ok to insulate garage
FIRE-Final Inspection1/24/20201/27/20201/27/2020PPART
DetailsTroy Cobbley
A temporary for life safety for Building A (south building) is ok. Need door hardware as discussed and fire alarm permit addressed.

Lee Phone #: ###-####
BLD-Final1/23/20201/24/20201/24/2020PPASS
DetailsJim Storey
Lee Phone #: ###-#### area b exit sys per jblais and arch plan on file.
FIRE-Final Inspection1/23/20201/24/20201/24/2020APART
DetailsTroy Cobbley
Life safety is ok for a temp for Building A (north building). Lee Phone #: ###-####
Temporary Occupancy1/24/20204/23/20201/24/2020 DONE
DetailsBrittany Hill
Print Occupancy Form  1/24/2020 DONE
BLD-Final1/22/20201/23/20201/23/2020PNR
DetailsJim Storey
Lee Scott Phone #: ###-####
BLD-Final1/21/20201/22/20201/22/2020ADEFR
DetailsJim Storey
Lee Scott Phone #: ###-####
FIRE-Final Inspection1/21/20201/22/20201/22/2020ACANC
DetailsTroy Cobbley
Still waiting on the fire alarm addressing issue.

Lee Phone #: ###-####
Zoning Approval Temp1/22/20201/22/20201/22/2020 PASS
DetailsJosh Wilson
60-day temp occ ok for Area A and Area B
BLD-Final1/17/20201/21/20201/21/2020PDEFR
DetailsJim Storey
Lee Scott Phone #: ###-####
FIRE-Final Inspection1/17/20201/21/20201/21/2020AFAIL
DetailsTroy Cobbley
For a temp on life safety for Building A the project related fire alram permit needs the addressing corrected as discussed and as-built eventually submitted. All sprinkler work and life safety items as addressed in the review comments have been done. As per plan review the requirements for stand pipes has been deleted. Lee Scott Phone #: ###-####
Print Occupancy Form  1/21/2020 DONE
FIRE-Conference1/17/20201/17/20201/17/2020PDONE
DetailsTroy Cobbley
I verified functionality of the basement, second and third floor exit signs and emergency lights. First floor was not ready. I noted a missing exit sign at the center basement stairs. Fire extinguishers are in place except for one that is missing. Door hardware appears ok. This inspection was for the north building and the associated exit paths only. Building B is not ready yet. The exit signs/emergency lights/fire extinguishers and door hardware are the only items inspected today. The fire alarm and fire sprinkler permits stil need addressed. I spoke to plan review about note 35 on the life safety comments and will need to follow up. Emergency evac plan needs to be addressed as well.
BLD-Final1/17/20201/17/20201/17/2020PNR
DetailsJim Storey
Lee Phone #: ###-####
BLD-Other1/9/20201/9/20201/9/2020PPART
DetailsJim Storey
fire caulking // Lee Phone #: ###-#### 5 locations need gyp boxes 2hr to instal pipe collors.
PubWorks Occupancy Approval1/8/20201/8/20201/8/2020 DONE
DetailsTiffany Lowery
BLD-Other1/6/20201/7/20201/7/2020AFAIL
DetailsJim Storey
Lee - fire caulking Phone #: ###-#### basement floor
BLD-Ceiling Grid Inspection1/6/20201/7/20201/7/2020APASS
DetailsJim Storey
Lee Phone #: ###-####
BLD-Other12/2/201912/2/201912/2/2019PPASS
DetailsJim Storey
Fire caulking - Lee Phone #: ###-#### 1st floor ok
BLD-Other11/18/201911/18/201911/18/2019PPART
DetailsJim Storey
fire culking // Lee Scott Phone #: ###-#### 2nd floor soffits ok pending missing s/d at common area rfi pending.
BLD-Other11/15/201911/15/201911/15/2019PPASS
DetailsJim Storey
LEE- FIRE CALKING INSPECTION Phone #: ###-#### third floor common space
BLD-Other11/12/201911/12/201911/12/2019PPART
DetailsJim Storey
Lee- inspection for fire calking on 3rd floor on hallway Phone #: ###-#### gasline two locations/ holes thurout// damper ul listing.
BLD-Wall cover11/7/201911/7/201911/7/2019PPASS
DetailsJim Storey
drywall fire protection // Lee Phone #: ###-#### wood beam ok/ colums framing ok to cover.
BLD-Card not on site to sign10/25/201910/25/201910/25/2019PPASS
DetailsJim Storey
Leee-fire caulking- AREA "B" 1ST FLOOR Phone #: ###-####
FIRE-Conference10/8/201910/8/201910/8/2019PNR
DetailsJim Storey
caulking - Area B, 2nd floor // Lee Phone #: ###-####
BLD-Other9/26/20199/27/20199/27/2019APASS
DetailsBrandon Shaw
fire culking area B 2nd fl- 3 of 5...
BLD-Other9/13/20199/16/20199/16/2019APASS
DetailsJim Storey
fire culking... area B third fl // Lee Scott Phone #: ###-####
BLD-Other9/10/20199/10/20199/10/2019PPASS
DetailsJim Storey
Lee-fire caulking-area B 3rd floor unit 301 Phone #: ###-####
BLD-Energy code compliance9/4/20199/5/20199/5/2019APASS
DetailsJim Storey
Area B, first floor // Lee Phone #: ###-####
BLD-Other8/26/20198/27/20198/27/2019APASS
DetailsJim Storey
Lee-fire caulking-area A first floor Phone #: ###-####
BLD-Other8/22/20198/23/20198/23/2019AFAIL
DetailsJim Storey
Lee- Area A 1st floor- inspection for fire caulking Phone #: ###-#### plm not fire stopped to listed uses of fire chalk
BLD-Framing/Rough-in8/19/20198/20/20198/21/2019APASS
DetailsBrandon Shaw
area B, first floor // Lee Phone #: ###-####
BLD-Energy code compliance8/16/20198/19/20198/19/2019APASS
DetailsDave Hannah
Lee-area B 2nd floor Phone #: ###-#### fire stopping shoewer and tolit flanges ok
BLD-Other8/13/20198/13/20198/13/2019PPASS
DetailsBrandon Shaw
area A second floor sofits- units K and P...
BLD-Energy code compliance8/12/20198/12/20198/12/2019PFAIL
DetailsJim Storey
Lee- Area B 2nd floor Phone #: ###-#### all rated floor penatrations not done at framing.
BLD-Other8/8/20198/9/20198/9/2019APASS
DetailsJim Storey
area A second floor unit B- fire caulking - Lee Phone #: ###-#### 205 unit #
BLD-Framing/Rough-in7/29/20197/30/20197/30/2019APASS
DetailsBrandon Shaw
2nd floor, Area B
BLD-Energy code compliance7/22/20197/22/20197/22/2019PPASS
DetailsJim Storey
Area B 3rd floor- Lee Phone #: ###-####
BLD-Framing/Rough-in7/22/20197/22/20197/22/2019PPASS
DetailsJim Storey
Area B framing on stairs - Lee Phone #: ###-####
BLD-Framing/Rough-in7/16/20197/16/20197/16/2019PPASS
DetailsJim Storey
area B 3rd floor - Lee Phone #: ###-####
BLD-Framing/Rough-in7/15/20197/16/20197/16/2019ADEFR
DetailsJim Storey
area B 3rd floor - Lee Phone #: ###-#### pm 2:30 appt
BLD-Framing/Rough-in6/27/20196/28/20196/28/2019APASS
DetailsMike Jordan
second floor corridor, area B // Lee Phone #: ###-####. 2nd. floor corridors area B ok to rock lid.
BLD-Framing/Rough-in6/14/20196/17/20196/17/2019APART
DetailsBrandon Shaw
3rd floor corridor above ceiling grid...
BLD-Energy code compliance6/14/20196/17/20196/17/2019APART
DetailsBrandon Shaw
1st floor area A- Lee Phone #: ###-####
BLD-Other6/5/20196/5/20196/5/2019PPASS
DetailsJim Storey
roof nailing // Lee Scott Phone #: ###-#### area b thirdfloor rpoof ok to cover.
BLD-Energy code compliance5/29/20195/30/20195/30/2019APASS
DetailsJim Sly
area A 2nd floor - Lee Phone #: ###-####
BLD-Framing/Rough-in5/29/20195/30/20195/30/2019APASS
DetailsJim Sly
area Afirst floor - Lee Phone #: ###-####
BLD-Framing/Rough-in5/20/20195/20/20195/21/2019PPART
DetailsJim Sly
Area A second fl // Lee Scott Phone #: ###-####..........Nail hangers ....Firestopping....
BLD-Other5/20/20195/20/20195/20/2019PPART
DetailsJim Sly
Area B second fl // Lee Scott Phone #: ###-####
roof nailing....OK
BLD-Other5/16/20195/16/20195/16/2019PPART
DetailsJim Storey
roof nailing // Lee Scot Phone #: ###-#### need 1/8 inch gap inlue of clip spacers/short nailled some areas.
BLD-Framing/Rough-in5/16/20195/16/20195/16/2019PNR
DetailsJim Storey
2nd flr area a. and roof area b // Lee Scot Phone #: ###-####
BLD-Framing/Rough-in5/13/20195/14/20195/14/2019APASS
DetailsJim Sly
at elevator shaft // Lee Phone #: ###-####
BLD-Energy code compliance5/9/20195/10/20195/10/2019APART
DetailsBrandon Shaw
BLDG A, third floor, OK to cover...
BLD-Framing/Rough-in5/3/20195/3/20195/3/2019PPART
DetailsJim Sly
area A 3 rd flr // Lee Scott Phone #: ###-####
Area A 3rd floor....OK
CHANGE STATUS TO (ISS)  12/27/2018 DONE
Plan assigned to (CJW)10/2/201810/2/201812/20/2018 PASS
DetailsCarl Westfall
(2nd done) 11/05/18 (new - 25 days) (ePlan - 259 sheets) Plan Mod - Crescent Rim
Plan Reviewer's activity  12/20/2018 PASS
The plan mod review was approved
Permit Ready to Issue  12/20/2018 DONE
all met-
do not re issue plan mod approved
Need-met
Verfiy GC (might need a new GC Form filled out)

met- ESC06-01306 fees due (change back to issued status after fees are paid)

Delete condition hold when BLD and ESC are changed back to issued
Routing PW Sewer Design12/18/2018 12/19/2018 PASS
DetailsDeAnn Brown
Routing - MECHANICAL12/18/2018 12/19/2018 PASS
DetailsTroy James
Routing - FIRE12/18/201812/18/201812/18/2018 PASS
DetailsErika Akin
Attached revised comments to case
Routing PW Street Lights12/18/2018 12/18/2018 PASS
DetailsTom Marshall
Plan resubmittals received  12/18/2018 DONE
Routing - PLAN CHECK12/18/2018 12/18/2018 PASS
DetailsCarl Westfall
Plan resubmittals requested  12/13/2018 DONE
Routing - PLAN CHECK10/9/2018 12/13/2018 PASS
DetailsCarl Westfall
IBC plan review approved with referenced code sections
Routing - FIRE10/9/2018 11/19/2018 FAIL
DetailsErika Akin
Attached comments case and emailed architect
Routing Off Site - STRUCTURAL10/9/2018 10/23/2018 PASS
DetailsCarl Westfall
Chris Merrill (Stapley)
Routing - PLANNING Land Div10/9/2018 10/12/2018 PASS
DetailsCody Riddle
Routing - MECHANICAL10/9/2018 10/12/2018 FAIL
DetailsTroy James
Routing - Design Review10/9/2018 10/11/2018 PASS
DetailsAndrea Tuning
Routing PW Street Lights10/9/2018 10/10/2018 FAIL
DetailsTom Marshall
The electrical service for the street lights needs to be corrected. The service wasn't installed correctly and needs to be fixed.
Routing PW Sewer Design10/9/2018 10/10/2018 FAIL
DetailsDeAnn Brown
Please submit civil site/utility plans that show building connection to publicly owned wet-line sewer.
Routing PW Solid Waste10/9/2018 10/10/2018 PASS
DetailsEvan Carpenter
Routing PW Drainage10/9/2018 10/10/2018 PASS
DetailsBrian Murphy
APPROVED 2006
Routing PW Sewer Design10/9/2018 10/10/2018 FAIL
DetailsDeAnn Brown
Please submit civil site/utility plans that show building connection to publicly owned wet-line sewer.
Routing PW Solid Waste10/9/2018 10/10/2018 PASS
DetailsEvan Carpenter
Plan Reviewer's activity  10/9/2018 DONE
Routed the drawings
Routing - Addressing10/9/2018 10/9/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/9/2018 10/9/2018 PASS
DetailsMorgan Webb
Routing - PLUMBING10/9/2018 10/9/2018 PASS
DetailsDaryl Spivey
Provide DCVA for water service protection and install per plan and ISPC.
Plan Modification Accepted  10/2/2018 DONE
Plan Mod - Adjustments to BLD design
BLD-Footing3/21/20163/22/20163/22/2016PCANC
DetailsPhil Shearer
Strata will look at the footings as well. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Aging Inspection11/18/201511/18/201511/18/2015 PEND
DetailsPhil Shearer
BLD-Aging Inspection8/18/20158/18/20158/18/2015 PEND
DetailsPhil Shearer
BLD-Aging Inspection5/19/20155/19/20155/19/2015 PEND
DetailsPhil Shearer
BLD-Aging Inspection2/17/20152/17/20152/18/2015 PEND
DetailsPhil Shearer
BLD-Aging Inspection11/18/201411/18/201411/18/2014 PEND
DetailsPhil Shearer
CHANGE STATUS TO (ISS)  11/14/2014 DONE
DetailsRita DeYoung
Per Jason Blais
BLD-Aging Inspection7/28/20147/28/20147/28/2014 DONE
DetailsPhil Shearer
EXP
DOC - Permit Expired7/28/20147/28/20147/28/2014PPASS
DetailsPhil Shearer
BLD-Aging Inspection4/18/20144/18/20144/18/2014 PEND
DetailsTom Arcoraci
BLD-Aging Inspection1/17/20141/17/20141/21/2014 PEND
DetailsTom Arcoraci
BLD-Aging Inspection10/9/201310/9/201310/9/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection7/10/20137/10/20137/10/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection4/10/20134/10/20134/10/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection1/9/20131/9/20131/9/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection10/10/201210/10/201210/10/2012 PEND
DetailsTom Arcoraci
BLD-Aging Inspection7/11/20127/11/20127/11/2012 PEND
DetailsTom Arcoraci
BLD-Aging Inspection4/11/20124/11/20124/11/2012 PEND
DetailsTom Arcoraci
BLD-Aging Inspection1/11/20121/11/20121/11/2012 PASS
DetailsTom Arcoraci
BLD-Aging Inspection10/12/201110/12/201110/12/2011 PASS
DetailsTom Arcoraci
BLD-Aging Inspection7/13/20117/13/20117/13/2011 PASS
DetailsTom Arcoraci
BLD-Aging Inspection4/11/20114/11/20114/11/2011 PASS
DetailsTom Arcoraci
BLD-Aging Inspection2/9/20112/9/20112/9/2011 CANC
DetailsTom Arcoraci
BLD-Aging Inspection12/10/201012/10/201012/10/2010 PART
DetailsTom Arcoraci
Override - Parcel Holds  12/9/2010  
Override - Parcel Holds  12/9/2010  
Permit Ready to Issue  12/9/2010  
CHANGE STATUS TO (ISS)  12/9/2010 DONE
DetailsChristina Prado
Plan modification issued
(F) Reprint permit  12/9/2010 DONE
DetailsChristina Prado
Plan assigned to (DRS)11/29/2010 12/7/2010 PASS
DetailsDan Stuart
Routing - PLAN CHECK12/6/2010 12/7/2010 PASS
DetailsDan Stuart
Signed and dated copy of Plan Mod Alternate Request letter attached to plans. To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  12/7/2010 PASS
Print Occupancy Form  12/7/2010 DONE
Telephone call  12/7/2010 DONE
12-7-10 called Richard Honsinger permit ready and fee given ///dld
Routing - FIRE12/1/2010 12/6/2010 PASS
DetailsScott Arellano
Attached updated Fire Plan Review comments to Permit Case.
Routing - PLAN CHECK11/30/2010 12/1/2010 PEND
DetailsDan Stuart
Pending receiving a signed & dated copy of approved plan mod alternate for use of portion of basement parking garage.Routing to fire code analyst for review.
Routing - Design Review11/29/2010 11/30/2010 PASS
DetailsSarah Schafer
Sarah Schafer
CHANGE STATUS TO (REV)  11/29/2010 DONE
DetailsJason Blais
Plan Modification Accepted  11/23/2010  
plan modification excepted for BLD06-02322 to add partition and exit door from lower level mechanical space to allow temoprary occupancy of building 4 mechanical.routed to Sam Z for review. sheet affected A200.
BLD-Aging Inspection10/4/201010/4/201010/4/2010 PART
DetailsTom Arcoraci
BLD-Aging Inspection8/2/20108/2/20108/2/2010 PART
DetailsTom Arcoraci
BLD-Aging Inspection5/31/20105/31/20106/2/2010 PASS
DetailsTom Arcoraci
BLD-Aging Inspection3/30/20103/30/20103/30/2010 PASS
DetailsTom Arcoraci
Case Summary (BLD)  3/15/2010  
Case Summary (BLD)  3/15/2010 DONE
BLD-Aging Inspection1/27/20101/27/20101/27/2010 PASS
DetailsTom Arcoraci
BLD-Conference11/24/200911/24/200911/24/2009APASS
DetailsTom Arcoraci
BLD-Aging Inspection11/24/200911/24/200911/24/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection9/23/20099/23/20099/23/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection7/21/20097/21/20097/21/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection5/18/20095/18/20095/18/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection3/16/20093/16/20093/16/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection1/13/20091/13/20091/13/2009 NR
DetailsTom Arcoraci
CHANGE STATUS TO (ISS)  12/23/2008  
DetailsBarbara Stitt
Re-open permit per Jason-permit was finaled in error by inspector Vertical construction has not occurred to date///12-23-08 BAS
BLD-Aging Inspection11/11/200811/11/200811/12/2008 CANC
DetailsTom Arcoraci
DOC - Permit Finaled11/12/200811/12/200811/12/2008PPASS
DetailsTom Arcoraci
Additional plans submitted  9/9/2008 DONE
DetailsBarbara Stitt
Received 4 copies of a letter to Dave Hanneman & George Slane dated 9-8-08 (2 pgs) from Andy Erstad, 1 to Jenifer Gilliland, 1 George Slane, 1 to Sam Rogers, 1 to Dan Stuart///9-9-08 BAS
BLD-Aging Inspection7/15/20087/15/20087/15/2008 PASS
DetailsTom Arcoraci
cresent condo wip
BLD-Aging Inspection5/13/20085/13/20085/12/2008 NR
DetailsTom Arcoraci
Plan resubmittals received  1/23/2008  
Received 1 cover transmittal, 1 letter from Rishard Honsinger dated 1-22-08, 1 copy of sheet SK1/A900 and taken to Marlene Southard's desk///1-23-08 @ 2:30pm BAS
Permit Ready to Issue  12/27/2007 DONE
Print Occupancy Form  12/27/2007 DONE
Issue PAID IN FULL permit  12/27/2007 DONE
Plan assigned to (M_P)8/15/20068/15/200612/26/2007 PASS
12/26/2007 09:51:15 MYS - activity updated through activity BLDA022 from case BLD06-02322.
PLANS/APPL TAKEN TO FRONT DESK  12/26/2007 DONE
Routing Off Site - STRUCTURAL12/11/2007 12/17/2007 PASS
12/11/07 -Routed resubmittals to outside engineer for review.
12/17/2007 - Review completed. All items adequately addressed.
Plan resubmittals received  12/11/2007 DONE
Received transmittal, and five copies of response letter and structural calculations; taken to Marlene S.//per Marlene called Action Couriers to send one copy to outside engineering
Routing - FIRE12/3/2007 12/4/2007 PASS
Attached updated IFC review comments to plan sets. Approved per revised sheets A200, A201, A202, A203, A217, A218, A219, A220. (received on 11/29/07)
Routing Off Site - STRUCTURAL11/27/2007 12/4/2007 FAIL
11/27/2007 - Routing structural resubmittals to outside engineer for review. (msouthard)
12/4/2007 - Received review by outside engineer. Additional submittals are required. Sent comments to architect and construction manager.
Plan resubmittals received  11/29/2007  
Received letter and three copies of pages A200, A201, A202, A203, A217, A218, A219, A220; taken to Marlene
Routing - PLANNING11/27/2007 11/27/2007 PASS
Approved per DRH07-00548 and per the Conditional Use Permit as reviewed by Schafer and Riddle.
Telephone call  11/27/2007 DONE
Called Action Couriers for pick up
Routing - PLAN CHECK10/22/2007 11/27/2007 PEND
10/23/2007 - On hold waiting for resubmittals.
11/27/2007 - Resbumittals received and routing to others for rereview.
Plan resubmittals received  11/26/2007  
Received transmittal, response letter, one copy of supplemental calcs, and three copies of pages S1.01, S2.01W, S2.02, S2.03, S2.04, S2.04A, S2.04B, S2.18W, S2.19, S2.20, S2.21, S2.21A(6 copies total of S2.21A only), S2.21B, S5.00, S5.04, S5.05, S5.06; taken to Marlene S.
Routing Off Site - STRUCTURAL10/18/2007 11/2/2007 FAIL
10/18/07 - Routed to outside structural review copies of resubmittal structural plan sheets and calculations. (msouthard)
Called Action Courier for pick up 10/18/07 @ 9:49am BAS
11/2/07 - Received structural review comments from outside engineer and sent via e-mail to architect, structural engr., and construction manager. (msouthard)
Routing - FIRE10/18/2007 10/22/2007 FAIL
Faxed resubmittal items to architect. Attached revised IFC review comments to plans.
Routing - PLAN CHECK3/30/2007 10/18/2007 ----
Routing on to Fire while Dan S. is preparing plan review follow up report and waiting for structural review comments.
Routing - PLUMBING10/17/2007 10/17/2007 PASS
secondary drainage will be required for roof and deck areas with wall enclosures.
Plan resubmittals received  10/15/2007  
Received 1 cover transmittal, 1 responce letter from Tikker Engineering with supplemental calcs, 1 responce letter from Kieffer Design Group, 1 responce letter from Driscoll Architecs and the following sheets-A201, A202, A203, A204, 205, A206, A207, A208, A209, A210, A211, A212, A213, A214, A215, A216, A217, A218, A219, A220, A221, A230, A237, A238, A239, A240, A241, A242, A244, A253, A305, A704, A800, A801, A802, A803, A810, A811, ID.19, M500,M501, M514, M515, E1.1 are at Barb's desk for insertion///10/15/07 @ 4:45pm
A structural supplemental calcs book and the following sheets-S1.00, S1.01, S2.00, S2.01F, S2.01R, S2.01W, S2.02, S2.03, S2.04, S2.04A, S2.04B, S2.05, S2.06F, S2.06R, S2.06W, S2.07, S2.08, S2.09, S2.10, S2.10A, S2.11, S2.12F, S2.12R, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.16A, S2.17, S2.18F, S2.18R, S2.18W, S2.19, S2.20, S2.21, S2.21A, S2.21B, S3.00, S3.01, S3.02, S3.03, S4.00, S4.01, S4.02, S5.00, S5.01, S5.02, S5.03, S5.04, S5.05, S5.06, S6.00 for Marlene at Barb's desk 10/15/07 @ 4:45pm
Plan resubmittals received  10/12/2007  
Matt Siegenthaler inserted the following pages in to plans--Cov, A001, A002, A003, A012, A013, A200, A201, A202, A203, A204, A205, A206, A207, A208, A209, A210, A211, A212, A216, A217, A218, A219, A220, A221, A230, A231, A232, A233, A234, A235, A236, A243, A244, A245, A246, A247, A248, A249, A250, A251, A252, A253, A254, A260, A261, A262, A270, A271, A272, A300, A301, A302, A303, A304, A310, A325, A360, A361, A362, A363, A364, A365, A500, A700, A701, A702, A703, A704, A705, A706, A707, A710, A800, A801, A802, A803, A804, A810, A811, A813, A822, A900, A902, WP-000, WP-001, WP-002, WP-003, WP-004, WP-005, WP-006, WP-007, ID.01, ID.01A, ID.02, ID.02A, ID.13, ID.14, ID.15, ID.19A, S1.00, S1.01, S2.01W, S2.02, S2.03, S2.04, S2.04A, S2.04B, S2.06W, S2.07, S2.08, S2.09, S2.10, S2.10A, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.16A, S2.18W, S2.19, S2.20, S2.21, S2.21A, S2.21B, S5.00, S5.01, S5.03, S5.04, S5.05, S5.06, S6.00, M100, M101, M102, M103, M104, M200, M201, M202, M203, M204, M300, M301, M302, M303, M314, M315, M316, M317, M400, M401, M402, M403, M405, M410, M414, M415, M416, M417, M500, M501, M502, M503, M504, M505, M508, M509, M510, M513, M514, M515, M516, M517, FP100, FP101, FP102, FP103, FP104, FP105, FP106, FP107, FP108, FP109, FP110, E0.0, E1.0, E1.2, E1.3, E1.4, E1.5, E1.6, E1.7, E1.8, E1.9, E2.0, E2.1.0L, E2.1.0P, E2.1.1L, E2.1.1P, E2.1.3L, E2.1.3P, E2.1.4, E2.10, E2.14, E2.16, E2.17, E2.18, E2.19, E2.2.1L, E2.2.1P, E2.21, E2.3.1L, E2.3.1P, E2.4.0L, E2.4.0P, E2.4.1L, E2.4.1P, E2.4.2L, E2.4.2P, E2.4.3L, E2.4.3P, E2.4.4, E2.5, E2.6, E2.8, E2.9, E3.0, C1.0, C2.0, C3.0, C3.1, C3.2, C3.3, C3.4, C3.5, C3.6, C3.7, C3.8, C4.0, C4.1, C4.2, C4.3, C4.4, C4.5, C5.0, C6.0, C7.0, C8.0, Letters from Driscoll Architects for responce comments, info from Creighton Engineers regarding Fire Suppression, Info from Kieffer Design Group regarding interior, info from Tikker for MEC & PLM, Info from Musgrove regarding ELE, info from Yu & Trochalakis regarding structural, Responce & supplemental calcs
Routing - FIRE3/29/2007 3/30/2007 FAIL
Emailed resubmittal items for Building #1 to architect. Inserted review comments with plan documents.
1st review completed  3/30/2007 FAIL
Routing - PLAN CHECK1/29/2007 3/29/2007 FAIL
Plan review completed, sent correction report to the architect requesting additional informaiton to be submitted for further review prior to issuing permit.
Routing - PLUMBING1/29/2007 1/29/2007 FAIL
no corrections
Routing - PLAN CHECK9/25/2006 1/29/2007 ----
Plans routed back to Plumbing for review. Building code items not reviewed at this time.
Plan resubmittals received  12/8/2006  
Received 4 copies of pages M100, M200, M201, M202, M203; taken to Mike Phillips
Routing - PLANNING Land Div12/8/2006 12/8/2006 PASS
Routing - FIRE9/21/2006 9/25/2006 FAIL
Faxed resubmittal items to architect. Reviewed for water supply and access only.
Routing - PLAN CHECK9/6/2006 9/21/2006 ----
PLANS ROUTED TO FIRE FOR ACCESS & WATER REQUIREMENTS ONLY. Review for all building code requirements not completed at this time.
Routing - PLANNING9/5/2006 9/6/2006 FAIL
Failed both DR and CU. Letter to be issued. DRH05-00397 and CUP05-00015.
Routing - PLUMBING8/30/2006 9/5/2006 FAIL
plans are incomplete, please address the above listed items
Routing - Erosion and Sediment8/29/2006 8/30/2006 PASS
Routing - PUBLIC WORKS8/22/2006 8/29/2006 PASS
Routing Off Site - STRUCTURAL8/15/2006 8/28/2006 FAIL
8/15/06 - Called Action Courrier for pick up 8/15/06 @ 12:30pm BAS. Original submittal includes structural for concrete package only.
8/28 - Concrete package review received. Review failed.
Routing - Addressing8/24/2006 8/24/2006 PASS
Routing - PLANNING Land Div8/14/2006 8/22/2006 FAIL
parcels not combined
(F) Reprint permit  8/15/2006 DONE
Application received  8/14/2006  
Plans ACCEPTED BY PLAN TECH  8/14/2006  
Plan routing begun/NEW & ADDTN  8/14/2006  
First Notice 2/22/2020   
FIRE-Final Inspection2/5/20202/6/2020 A 
DetailsGreg Ruxton
lee Phone #: ###-####