Permanent Occupancy | | | 1/23/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/23/2017 | | DONE |
|
|
|
|
Telephone call | | | 1/12/2017 | | DONE |
|
|
|
called Bill to let him know there will be a final ele tomorrow. Thats the last permit that needs finaled. Once that is done we can iss the perm c of o
|
Telephone call | | | 1/12/2017 | | DONE |
|
|
|
called Bill again to let know that i would just email him the C of O on Tuesday as long as the final ele was passed 1/13/17
|
Print Occupancy Form | | | 1/12/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/12/2017 | | DONE |
|
|
|
|
Telephone call | | | 1/3/2017 | | DONE |
|
|
|
emailed Andrea T, Sarah S, Bob A, Troy J & Tiffiany L to see if all inspections have been done so we can issue the perm c of o-everyone but Bob A have replied that they are good to sign off on the perm c of o
|
Telephone call | | | 1/3/2017 | | DONE |
|
|
|
called Bill Clark @###-#### ext 13-left message on his ext that I'd like him to call me in referrence to the perm C of O that is almost ready to be issued
|
BLD-Final | 12/7/2016 | 12/8/2016 | 12/8/2016 | P | PASS |
Dave Hannah
|
|
|
gil Phone #: ###-#### ste 201 bld 2
|
FIRE-Final Inspection | 12/6/2016 | 12/7/2016 | 12/7/2016 | A | PASS |
Troy Cobbley
|
|
|
bldg 2 suite 201 life safety passed
|
BLD-Final | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-#### bldg 3, ste 401
|
BLD-Final | 11/2/2016 | 11/3/2016 | 11/3/2016 | P | NR |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
FIRE-Final Inspection | 11/2/2016 | 11/3/2016 | 11/3/2016 | A | PART |
Troy Cobbley
|
|
|
BUILDING #3 – Suite #401 Life safety passed
|
BLD-Aging Inspection | 10/26/2016 | 10/26/2016 | 11/3/2016 | | PEND |
Dave Hannah
|
|
|
|
Telephone call | | | 10/18/2016 | | DONE |
|
|
|
Bill called and i sent him a temp c of o for bldg 3 unit 204
|
Temporary Occupancy | 9/16/2016 | 12/15/2016 | 9/16/2016 | | DONE |
Candy A. Nichols
|
|
|
As per Jason Blais-ok for temp c of o good for 6 months -all units that have temp c of o's are building 2 units 101, 102,103, 104, 202, 203, 204, 205, 206, 207, 301, 302, 303, 304, 305,401, 402, 403, 404 & 405 Building 3 units 101, 102, 103, 104, 201, 202, 203, 204, 205, 206, 207, 301, 302, 303, 304, 305, 402, 403,
404 (2-201 & 3-401 are the only two left to be done)
|
Temporary Occupancy | 8/18/2016 | 11/16/2016 | 8/18/2016 | | DONE |
Candy A. Nichols
|
|
|
****forgot to change conditions see next temp***Jason Blais ok'd extension for 6 months-bldg 2 unit 201 is the only unit left to complete with this permit-bldg 3 unit 401 is under permit # BLD16-02993
|
Telephone call | | | 8/18/2016 | | DONE |
|
|
|
called Gil to see if they could request a extension temp C of O. All units in both bldg 2 & 3 are complete but 2 units. Bldg#3-unit 401 has it's own permit see BLD16-02293. Bldg #2-unit 201 has not been completed and Gil thinks it'll need to be extended until the end of the year. Jason Blais ok'd an extension good for 6 months thru today. I called Bill Clark and asked him to send me a email requesting the extension
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 101-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 305-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 304-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 301-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 207-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 206-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 204-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 203-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 202-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 103-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 102-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 2 unit 403-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 2 unit 401-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 2 unit 305-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 2 unit 301-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 2 unit 104-ok for final C of O
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 2 unit 103-ok for final C of O
|
Case Summary (BLD) | | | 8/5/2016 | | DONE |
|
|
|
|
BLD-Final | 7/12/2016 | 7/13/2016 | 7/13/2016 | P | PEND |
Dave Hannah
|
|
|
Dave unit #2-101 Phone #: ###-#### ok for temp occ ok for perm after bldg gos perm
|
FIRE-Final Inspection | 7/12/2016 | 7/13/2016 | 7/13/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 6/17/2016 | 8/15/2012 | 6/17/2016 | A | PASS |
Tom Arcoraci
|
|
|
****notes from 8/15/12 inspection request***-call first -- units 207, 206, 203 -- Gill Phone #: ###-#### those units in bld 3 ok for occupancy-6/17/16 as per Bob A. ok to issue C of O's for Bldg 3-units 207, 206 & 203
|
Telephone call | | | 6/17/2016 | | DONE |
|
|
|
emailed Brooke Seidl a copy of the C of O for bld 3 unit 207 as per her request
|
Telephone call | | | 6/16/2016 | | DONE |
|
|
|
Brooke Seidl emailed a request for a C of O for bldg 3 unit 207 but there was no permit issued for that unit. I told her she would need to have the GC call in inspection.
|
Case Summary (BLD) | | | 6/15/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/15/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/15/2016 | | DONE |
|
|
|
|
BLD-Aging Inspection | 5/19/2016 | 5/19/2016 | 5/26/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 3/10/2016 | 3/11/2016 | 3/11/2016 | P | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### Bldg 3 ....unit 205 OK to occupy.
|
FIRE-Final Inspection | 3/10/2016 | 3/11/2016 | 3/11/2016 | A | PART |
Troy Cobbley
|
|
|
life safety for Building #3, Unit 205 passed
|
BLD-Aging Inspection | 1/22/2016 | 1/22/2016 | 1/27/2016 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 11/20/2015 | 2/18/2016 | 11/20/2015 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 11/3/2015 | 11/4/2015 | 11/4/2015 | A | PASS |
Jim Storey
|
|
|
Apartment 3-303 - Dave Phone #: ###-####
|
FIRE-Final Inspection | 11/3/2015 | 11/3/2015 | 11/3/2015 | P | PART |
Troy Cobbley
|
|
|
Apartment 3-303 - Life safety passed
|
BLD-Aging Inspection | 9/23/2015 | 9/23/2015 | 9/29/2015 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 7/24/2015 | 7/28/2015 | 7/28/2015 | P | PASS |
Jim Sly
|
|
|
Dave-bldg 2-102 Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 7/24/2015 | 7/28/2015 | 7/28/2015 | A | PASS |
Jim Page
|
|
|
Bldg 2-102 Life fire safety passed/complete
|
BLD-Aging Inspection | 6/17/2015 | 6/17/2015 | 6/23/2015 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 4/30/2015 | 7/29/2015 | 4/30/2015 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 4/6/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Dave Hannah
|
|
|
Building 3 403// Dave Phone #: ###-####
|
FIRE-Final Inspection | 4/6/2015 | 4/7/2015 | 4/7/2015 | A | PASS |
Scott Arellano
|
|
|
Approved.
|
BLD-Aging Inspection | 2/25/2015 | 2/25/2015 | 2/27/2015 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 12/15/2014 | 12/15/2014 | 12/22/2014 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 10/30/2014 | 1/28/2015 | 10/30/2014 | | DONE |
Candy A. Nichols
|
|
|
as per Jason B. extension granted today 10-30-14
|
BLD-Final | 10/15/2014 | 10/16/2014 | 10/16/2014 | A | PASS |
Dave Hannah
|
|
|
Dave-Bldg 2 unit 304 Phone #: ###-####
|
FIRE-Final Inspection | 10/13/2014 | 10/13/2014 | 10/13/2014 | P | PASS |
Craig D. Hanson
|
|
|
Bldg 2, unit 305 // Dave Phone #: ###-####
|
FIRE-Final Inspection | 8/27/2014 | 8/28/2014 | 8/28/2014 | A | PART |
Forrest France
|
|
|
Unit 205 building #2 passed fire life safety final inspection.
|
BLD-Final | 8/27/2014 | 8/28/2014 | 8/28/2014 | A | PASS |
Dave Hannah
|
|
|
Gil-please call 20 mintues prior Unit #2-205 Phone #: ###-####
|
BLD-Final | 8/8/2014 | 8/11/2014 | 8/11/2014 | P | PASS |
Dave Hannah
|
|
|
call before // for units 2-402 & 2-20 ... 4Gill Phone #: ###-####
|
FIRE-Final Inspection | 8/8/2014 | 8/11/2014 | 8/11/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection for units 204 and 402 building #2 passed inspection.
|
BLD-Final | 7/9/2014 | 7/11/2014 | 7/11/2014 | A | PASS |
Jim Storey
|
|
|
Gil Phone #: ###-#### final ok for unit 2-207
|
FIRE-Final Inspection | 7/9/2014 | 7/10/2014 | 7/10/2014 | A | PART |
Forrest France
|
|
|
Fire life safety inspection passed for unit 207 building #2.
|
FIRE-Final Inspection | 5/2/2014 | 5/2/2014 | 5/2/2014 | P | PART |
Forrest France
|
|
|
Building #2 unit 303 and building #3 unit 404 passed fire life safety inspection.
|
BLD-Final | 5/2/2014 | 5/2/2014 | 5/2/2014 | P | PASS |
Tom Arcoraci
|
|
|
gale - please call 20 minutes prior - bldt2-303 and bld 3-404 Phone #: ###-#### ok for occ
|
BLD-Final | 3/28/2014 | 3/31/2014 | 3/31/2014 | P | PASS |
Tom Arcoraci
|
|
|
bld2-202Gill Phone #: ###-#### ok for occ
|
FIRE-Final Inspection | 3/28/2014 | 3/31/2014 | 3/31/2014 | A | PART |
Forrest France
|
|
|
Fire life safety for building #2 unit 202 passed inspection.
|
FIRE-Final Inspection | 3/12/2014 | 3/13/2014 | 3/13/2014 | A | PART |
Forrest France
|
|
|
Building 2 unit 403 passed fire life safety inspection.
|
FIRE-Final Inspection | 3/12/2014 | 3/13/2014 | 3/13/2014 | A | PART |
Forrest France
|
|
|
Building 3 unit 305 passed fire life safety inspection.
|
BLD-Final | 3/12/2014 | 3/13/2014 | 3/13/2014 | A | PASS |
Tom Arcoraci
|
|
|
call before // (bldg 3- unit 305) //Gale Phone #: ###-#### ok for final
|
BLD-Final | 3/12/2014 | 3/13/2014 | 3/13/2014 | A | PASS |
Tom Arcoraci
|
|
|
call before // (bldg 2- unit 403) //Gale Phone #: ###-#### ok for final
|
Temporary Occupancy | 1/31/2014 | 5/1/2014 | 1/31/2014 | | DONE |
Barbara Stitt
|
|
|
Temorary Occupancy extension granted until 8/5/14 per Jason Blais-see scanned documents//1/31/14 BAS
|
BLD-Aging Inspection | 1/20/2014 | 1/20/2014 | 1/21/2014 | | PEND |
Tom Arcoraci
|
|
|
|
Temporary Occupancy | 11/22/2013 | 2/20/2014 | 11/22/2013 | | DONE |
Barbara Stitt
|
|
|
Approved temporary occupancy extension per Jason Blais from 11-5-13-see scanned documents//11-22-13 BAS
|
BLD-Aging Inspection | 11/18/2013 | 11/18/2013 | 11/18/2013 | | PEND |
Tom Arcoraci
|
|
|
wip
|
Change Expiration Date Only | | | 10/31/2013 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 9/18/2013 | 9/19/2013 | 9/19/2013 | A | PART |
Forrest France
|
|
|
Building #2 unit #405 passed fire life safety inspection.
|
BLD-Final | 9/18/2013 | 9/19/2013 | 9/19/2013 | A | PASS |
Tom Arcoraci
|
|
|
2405 gil please call 30 min before going out Phone #: ###-#### bld 2 unit 405 ok for temp
|
BLD-Final | 8/22/2013 | 8/23/2013 | 8/23/2013 | A | PASS |
Tom Arcoraci
|
|
|
gail - 3-304 Phone #: ###-#### bld 3 unit 304 ok
|
FIRE-Final Inspection | 8/22/2013 | 8/23/2013 | 8/23/2013 | A | PART |
Forrest France
|
|
|
Fire life safety inspection completed for unit 304 building #3. Contractor to relocate surface mounted light fixture in the utility room as discussed.
|
FIRE-Final Inspection | 8/19/2013 | 8/19/2013 | 8/19/2013 | P | PART |
Forrest France
|
|
|
Fire life safety inspection for unit # 305 building #2 completed acceptable.
|
BLD-Final | 8/19/2013 | 8/19/2013 | 8/19/2013 | P | PASS |
Tom Arcoraci
|
|
|
gail Phone #: ###-#### building 2 unit 305 ok for occ
|
BLD-Aging Inspection | 8/14/2013 | 8/14/2013 | 8/14/2013 | | PEND |
Tom Arcoraci
|
|
|
|
Temporary Occupancy | 8/5/2013 | 11/3/2013 | 8/5/2013 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 6/14/2013 | 6/17/2013 | 6/17/2013 | A | PART |
Forrest France
|
|
|
Building #2 unit 302 passed fire life safety inspection.
|
BLD-Final | 6/14/2013 | 6/17/2013 | 6/17/2013 | A | PEND |
Tony Young
|
|
|
call 20 min before to meet//bldg 2-302 //Gill Phone #: ###-####,, ok pending others
|
BLD-Final | 5/23/2013 | 5/24/2013 | 5/24/2013 | A | PASS |
Tom Arcoraci
|
|
|
GIL please call before going out Phone #: ###-#### bld 2 unit 206 ok for occ
|
FIRE-Final Inspection | 5/23/2013 | 5/23/2013 | 5/23/2013 | P | PART |
Forrest France
|
|
|
Building 2 unit 206 passed fire life safety inspection.
|
BLD-Final | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | PART |
Tom Arcoraci
|
|
|
Please call ahead - Unit 2-103 - Gil Phone #: ###-#### bld 2 unit 103 ok
|
BLD-Final | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | PART |
Tom Arcoraci
|
|
|
Please call ahead - Unit 3-301 - Gil Phone #: ###-#### bld 3 unit 301 ok
|
FIRE-Final Inspection | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | PART |
Forrest France
|
|
|
Please call ahead - Unit 3-301 - Gil Phone #: ###-#### * Unit 301 fire life safety okayed
|
FIRE-Final Inspection | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | PART |
Forrest France
|
|
|
Please call ahead - Unit 2-103 - Gil Phone #: ###-#### * Unit 103 fire life safety inspection passed
|
BLD-Final | 4/11/2013 | 4/12/2013 | 4/12/2013 | A | PASS |
Tom Arcoraci
|
|
|
gil - call 30 mins prior to meet Phone #: ###-#### bld 2 units 301 and 401 ok for occ
|
FIRE-Final Inspection | 4/11/2013 | 4/11/2013 | 4/12/2013 | P | PART |
Forrest France
|
|
|
Building #2 units 301 and 401 fire life safety okay pending removal of travel cap and ceiling repair at 301 mech closet, provide intermediate temp. head at one bedroom and install missing escutcheon.
|
FIRE-Final Inspection | 2/20/2013 | 2/21/2013 | 2/21/2013 | A | PART |
Forrest France
|
|
|
Building #2 suite 104 passed final fire life safety inspection.
|
BLD-Final | 2/20/2013 | 2/21/2013 | 2/21/2013 | A | PASS |
Tom Arcoraci
|
|
|
call before//suite 2-104 only//Gil Phone #: ###-#### bld 2 104 ok tma
|
Change Expiration Date Only | | | 2/12/2013 | | DONE |
Barbara Stitt
|
|
|
See scanned documents temp occupancy will expire 8-12-13//BAS
|
BLD-Final | 1/3/2013 | 1/4/2013 | 1/4/2013 | A | PASS |
Tom Arcoraci
|
|
|
Blg 2 unit 203 - gil Phone #: ###-#### ok
|
FIRE-Final Inspection | 1/3/2013 | 1/4/2013 | 1/4/2013 | A | PART |
Troy Cobbley
|
|
|
Blg 2 unit 203 life safety passed.
|
BLD-Final | 12/17/2012 | 12/18/2012 | 12/18/2012 | A | CANC |
Tom Arcoraci
|
|
|
Blg 3 unit 204 - Rich Phone #: ###-####
|
FIRE-Final Inspection | 12/6/2012 | 12/6/2012 | 12/7/2012 | A | PART |
Forrest France
|
|
|
Unit 204 building 3 life safety inspection completed. Fire alarm permit to include added horn at the extra bedroom pending.
|
BLD-Final | 12/3/2012 | 12/4/2012 | 12/4/2012 | A | CANC |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 12/3/2012 | 12/3/2012 | 12/3/2012 | P | FAIL |
Forrest France
|
|
|
Inspection for building 3 unit 204 failed due to overdue certifications on fire extinguishers at the common corrdior. Also need to test the new audible notification appliance at the second bedroom.
|
Extend Permit 90/180 days | 12/3/2012 | 12/3/2012 | 12/3/2012 | P | PART |
Tom Arcoraci
|
|
|
unit 204 bld 3 ok for temp occ after fire signs off
|
BLD-Final | 11/30/2012 | 12/3/2012 | 12/3/2012 | A | NR |
Tom Arcoraci
|
|
|
Bld 2 unit 204 - Rich Phone #: ###-#### needs fire insp
|
FIRE-Final Inspection | 11/13/2012 | 11/14/2012 | 11/14/2012 | A | PART |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory for building #3 unit 104.
|
BLD-Final | 11/13/2012 | 11/14/2012 | 11/14/2012 | P | PASS |
Tom Arcoraci
|
|
|
Call for access - Gayle Phone #: ###-#### building 3 unit 104 ok for temp occ
|
BLD-Final | 11/1/2012 | 11/2/2012 | 11/2/2012 | P | CANC |
Tom Arcoraci
|
|
|
Gill-Building #2 #402 Building #3 201, #302, #402 Please call prior to inspection Phone #: ###-####
|
FIRE-Final Inspection | 11/1/2012 | 11/2/2012 | 11/2/2012 | A | PASS |
Forrest France
|
|
|
Building #2 unit 404, building #3 units 201,302, and 402 completed fire life safety inspections. Occupant notification must meet min. dB per NFPA 72.
|
BLD-Final | 11/2/2012 | 11/2/2012 | 11/2/2012 | A | PASS |
Tom Arcoraci
|
|
|
Gill-Building #2 #402 Building #3 201, #302, #402 Please call prior to inspection Phone #: ###-#### ok for occ
|
Extend Permit 90/180 days | 11/2/2012 | 11/2/2012 | 11/2/2012 | P | CANC |
Tom Arcoraci
|
|
|
Gill-Building #2 #402 Building #3 201, #302, #402 Please call prior to inspection Phone #: ###-####
|
BLD-Final | 10/31/2012 | 11/1/2012 | 11/1/2012 | A | NR |
Tom Arcoraci
|
|
|
PLease call prior to inspection--Gill-Building #2 #402, Building #3 #201, #302, #402 Phone #: ###-####
|
BLD-Aging Inspection | 10/15/2012 | 10/15/2012 | 10/15/2012 | | PEND |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 8/14/2012 | 8/15/2012 | 8/15/2012 | A | PART |
Forrest France
|
|
|
Fire life safety inspection at units 203, 206 and 207 passed.
|
BLD-Final | 8/14/2012 | 8/15/2012 | 8/15/2012 | P | CANC |
Tom Arcoraci
|
|
|
call first -- units 207, 206, 203 -- Gill Phone #: ###-#### those units in bld 3 ok for occupancy
|
BLD-Final | 7/10/2012 | 7/10/2012 | 7/10/2012 | A | PART |
Tom Arcoraci
|
|
|
bld 3 unit 202 ok for occupanvy
|
Temporary Occupancy | 7/10/2012 | 10/8/2012 | 7/10/2012 | | DONE |
Christina Prado
|
|
|
|
Temporary Occupancy | 7/10/2012 | 10/8/2012 | 7/10/2012 | | DONE |
Christina Prado
|
|
|
|
BLD-Aging Inspection | 7/4/2012 | 7/4/2012 | 7/5/2012 | | PEND |
Tom Arcoraci
|
|
|
|
Temporary Occupancy | 6/12/2012 | 9/10/2012 | 6/12/2012 | | DONE |
Barbara Stitt
|
|
|
|
Change Expiration Date Only | | | 6/6/2012 | | DONE |
Barbara Stitt
|
|
|
Temp occupancy extension per Jason Blais (see scanned documents) for 180 days//6-6-12//BAS
|
BLD-Aging Inspection | 4/23/2012 | 4/23/2012 | 4/23/2012 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Other | 2/22/2012 | 2/22/2012 | 2/22/2012 | P | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 2/22/2012 | 2/22/2012 | 2/22/2012 | | PEND |
Tom Arcoraci
|
|
|
on temp
|
Temporary Occupancy | 12/30/2011 | 3/29/2012 | 12/30/2011 | | DONE |
Barbara Stitt
|
|
|
Changed expiration date per Jason Blais request to be 6-22-12 and emailed to him.
|
BLD-Final | 12/22/2011 | 12/23/2011 | 12/23/2011 | P | PART |
Tom Arcoraci
|
|
|
ok for temp occ
|
FIRE-Final Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | A | PASS |
Forrest France
|
|
|
Inspection passed. Fire life safety finaled.
|
FIRE-Final Inspection | 12/22/2011 | 12/22/2011 | 12/23/2011 | P | PART |
Forrest France
|
|
|
|
Temporary Occupancy | 12/23/2011 | 3/22/2012 | 12/23/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Conference | 12/22/2011 | 12/22/2011 | 12/22/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 12/21/2011 | 12/21/2011 | 12/22/2011 | P | PART |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 12/20/2011 | 12/21/2011 | 12/22/2011 | P | PART |
Forrest France
|
|
|
Verified additional emergency lighting at the parking garage levels for buildings 2 and 3.
|
BLD-Conference | 12/19/2011 | 12/21/2011 | 12/21/2011 | A | PART |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 12/19/2011 | 12/21/2011 | 12/20/2011 | A | CANC |
Forrest France
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
|
FIRE-Final Inspection | 12/19/2011 | 12/20/2011 | 12/20/2011 | P | PART |
Forrest France
|
|
|
Exit discharge lighting retested okay, completed testing at buildings 2 and 3 unit smoke alarms for location and interconnection- noted areas where SA need relocated per NFPA 72, 4th floor fire sprinkler work verified.
|
FIRE-Final Inspection | 12/17/2011 | 12/19/2011 | 12/19/2011 | A | PART |
Forrest France
|
|
|
Completed walkthrough of EM lighting and exit signage for functionality on emergency power. Noted exit discharge lighting at some locations is not operable. Discussed items on fire code review notes, schedule for final approvals.
|
BLD-Conference | 12/16/2011 | 12/19/2011 | 12/19/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 12/16/2011 | 12/16/2011 | 12/16/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 12/15/2011 | 12/16/2011 | 12/16/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 12/15/2011 | 12/15/2011 | 12/15/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 10/26/2011 | 10/27/2011 | 10/27/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 10/18/2011 | 10/26/2011 | 10/26/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 10/4/2011 | 10/18/2011 | 10/18/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 9/26/2011 | 10/4/2011 | 10/4/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Conference | 10/3/2011 | 10/4/2011 | 10/4/2011 | A | DONE |
Forrest France
|
|
|
Leonard would like to discuss fire lanes and signage. Please call when you are available. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Other | 9/27/2011 | 9/27/2011 | 9/27/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 9/26/2011 | 9/26/2011 | 9/26/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 9/23/2011 | 9/23/2011 | 9/26/2011 | P | PASS |
Tom Arcoraci
|
|
|
Grid ceilings are ready to look at. Call me. >> Inspection requested via web by Bob Thornton
|
CHANGE STATUS TO (ISS) | | | 9/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 9/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (DRS) | 8/24/2011 | 8/24/2011 | 9/2/2011 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 8/24/2011 | | 9/2/2011 | | PASS |
Dan Stuart
|
|
|
Removed extra 90 minute 'Total Door' assemblies at Level P1 (parking garage), door #45, indicated on original plans. Doors on elevator are rated 90 minute assemblies already. There is a lobby at the elevator that will remain in the parking garage at Parking Garage Elevators.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/2/2011 | | PASS |
|
|
|
|
Print Occupancy Form | | | 9/2/2011 | | DONE |
|
|
|
|
Telephone call | | | 9/2/2011 | | DONE |
Christina Prado
|
|
|
Left message with Megan--advised fees due and permit ready
|
Override - Parcel Holds | | | 9/2/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 9/2/2011 | | DONE |
Christina Prado
|
|
|
|
Plan Modification Accepted | | | 8/24/2011 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted for Bld06-02323 (Crescent Rim Bldgs #2 & #3 - Residential units) level P1 to remove door 45 between elevator 2 and elevator lobby and door 45 between elevator 3 and elevator lobby; as note by revision (delta 4) dated 8/23/11, on sheets A205, A211, A704; routed to Dan Stuart (per JCB).
|
BLD-Conference | 8/11/2011 | 8/19/2011 | 8/19/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 8/11/2011 | 8/17/2011 | 8/17/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 8/9/2011 | 8/17/2011 | 8/17/2011 | A | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Wall cover | 8/11/2011 | 8/15/2011 | 8/15/2011 | A | PART |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Wall cover | 8/11/2011 | 8/11/2011 | 8/11/2011 | P | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Wall cover | 8/3/2011 | 8/10/2011 | 8/9/2011 | A | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Wall cover | 7/27/2011 | 8/3/2011 | 8/3/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/19/2011 | 7/27/2011 | 7/27/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 7/25/2011 | 7/26/2011 | 7/26/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/25/2011 | 7/25/2011 | 7/25/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/12/2011 | 7/19/2011 | 7/19/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/12/2011 | 7/12/2011 | 7/12/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/8/2011 | 7/12/2011 | 7/12/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 7/6/2011 | 7/8/2011 | 7/8/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/6/2011 | 7/6/2011 | 7/6/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 6/27/2011 | 7/6/2011 | 7/6/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/1/2011 | 7/1/2011 | 7/5/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 6/23/2011 | 6/27/2011 | 6/27/2011 | A | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Other | 6/21/2011 | 6/23/2011 | 6/23/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 6/17/2011 | 6/21/2011 | 6/21/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/21/2011 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 6/21/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Wall cover | 6/14/2011 | 6/17/2011 | 6/17/2011 | A | PASS |
Tom Arcoraci
|
|
|
wip ok to cover
|
BLD-Energy code compliance | 6/13/2011 | 6/14/2011 | 6/14/2011 | A | PASS |
Tom Arcoraci
|
|
|
wip ok
|
Print Occupancy Form | | | 6/14/2011 | | DONE |
|
|
|
|
Telephone call | | | 6/14/2011 | | DONE |
Christina Prado
|
|
|
No answer or voicemail for given number, emailed Richard information instead 6-14-11 at 1 P.M.
|
Permit Ready to Issue | | | 6/14/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (DRS) | 6/1/2011 | 6/1/2011 | 6/13/2011 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 6/1/2011 | | 6/13/2011 | | PASS |
Dan Stuart
|
|
|
Approved based on plan resubmittals for area of refuge in existing stair enclosure with two-way communication system and use instructions at the existing weast stair enclosure serving the pool level area and new plan review clarification number .5 added to original reviews.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2011 | | |
|
|
|
|
Override - Parcel Holds | | | 6/13/2011 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/13/2011 | | |
|
|
|
|
Case Summary (BLD) | | | 6/13/2011 | | |
|
|
|
|
BLD-Energy code compliance | 6/10/2011 | 6/10/2011 | 6/10/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 6/8/2011 | 6/8/2011 | 6/8/2011 | P | PASS |
Tom Arcoraci
|
|
|
2nd floor wip ok
|
BLD-Energy code compliance | 6/8/2011 | 6/8/2011 | 6/8/2011 | P | PASS |
Tom Arcoraci
|
|
|
2nd floor wip ok
|
BLD-Wall cover | 6/3/2011 | 6/6/2011 | 6/6/2011 | A | PASS |
Tom Arcoraci
|
|
|
bld 2 4 units
|
BLD-Energy code compliance | 6/2/2011 | 6/3/2011 | 6/3/2011 | A | PASS |
Tom Arcoraci
|
|
|
Per Bob Thornton from CRB LLC this inspection has nothing to do with the plan modification that was turned in on 6-1-11 This inspection is for building 2 level 3
|
Override - Parcel Holds | | | 6/2/2011 | | |
|
|
|
|
Plan Modification Accepted | | | 6/1/2011 | | DONE |
Christina Prado
|
|
|
|
BLD-Energy code compliance | 5/23/2011 | 5/24/2011 | 5/24/2011 | A | PASS |
Tom Arcoraci
|
|
|
Bldg 2 level 3 unit 2/301 and 2/302. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Framing/Rough-in | 5/20/2011 | 5/23/2011 | 5/23/2011 | A | PASS |
Tom Arcoraci
|
|
|
Inspect 2/301 and 2/302. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Energy code compliance | 5/18/2011 | 5/18/2011 | 5/18/2011 | P | PASS |
Tom Arcoraci
|
|
|
Bldg 2 level 4 units 2/401 and 2/402 Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Wall cover | 5/16/2011 | 5/17/2011 | 5/17/2011 | A | PASS |
Tom Arcoraci
|
|
|
Bldg 2 units 2/401 and 2/402 Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Energy code compliance | 5/13/2011 | 5/16/2011 | 5/16/2011 | P | PASS |
Tom Arcoraci
|
|
|
Inspect bldg 2 units 403 404 and 405. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
Case Summary (BLD) | | | 5/13/2011 | | |
|
|
|
|
FIRE-Conference | 5/10/2011 | 5/12/2011 | 5/12/2011 | P | DONE |
Forrest France
|
|
|
On site conference with contractor and structural inspector regarding exiting at the pool enclosure.
|
BLD-Wall cover | 5/11/2011 | 5/12/2011 | 5/12/2011 | P | PASS |
Tom Arcoraci
|
|
|
Partial framing inspection bldg 2 level 4. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Conference | 5/10/2011 | 5/12/2011 | 5/12/2011 | P | PASS |
Tom Arcoraci
|
|
|
I would like to meet with you and Forest to discuss pool egress. Is it possible to get you both here at the same time? Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Wall cover | 5/11/2011 | 5/12/2011 | 5/12/2011 | A | PASS |
Tom Arcoraci
|
|
|
Look at bldg 3 corridors 2nd 3rd and 4th floors. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Conference | 5/10/2011 | 5/11/2011 | 5/10/2011 | P | CANC |
Tom Arcoraci
|
|
|
We want to meet with you and the fire inspector at the same time to discuss egress from the pool area. Is that possible? Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
|
BLD-Framing/Rough-in | 5/6/2011 | 5/6/2011 | 5/6/2011 | P | PASS |
Tom Arcoraci
|
|
|
Inspect Bldg 3 level 4 unit F Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Conference | 5/5/2011 | 5/6/2011 | 5/6/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 4/4/2011 | 4/4/2011 | 4/4/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 3/2/2011 | 3/3/2011 | 3/3/2011 | A | PASS |
Tom Arcoraci
|
|
|
Call me or meet there at 9:00 am. Thanks. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Aging Inspection | 2/28/2011 | 2/28/2011 | 2/28/2011 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 12/27/2010 | 12/27/2010 | 12/27/2010 | | PART |
Tom Arcoraci
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/9/2010 | | DONE |
Christina Prado
|
|
|
plan modification issued
|
(F) Reprint permit | | | 12/9/2010 | | DONE |
Christina Prado
|
|
|
|
Routing - FIRE | 12/7/2010 | 12/8/2010 | 12/8/2010 | | PASS |
Scott Arellano
|
|
|
Modified scope of original permit to include alternate & date change and attached original plan review comments as part of this alternate.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2010 | | |
|
|
|
|
Print Occupancy Form | | | 12/8/2010 | | DONE |
|
|
|
|
Telephone call | | | 12/8/2010 | | DONE |
Tisha Gallop
|
|
|
called and left message for Richard Honsinger that plan mod is ready and fees.
|
Override - Parcel Holds | | | 12/8/2010 | | |
|
|
|
|
Override - Parcel Holds | | | 12/8/2010 | | |
|
|
|
|
Permit Ready to Issue | | | 12/8/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (DRS) | 11/29/2010 | | 12/8/2010 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 11/29/2010 | | 12/7/2010 | | PASS |
Dan Stuart
|
|
|
Routing to fire code analyst for review.
|
CHANGE STATUS TO (REV) | | | 11/29/2010 | | DONE |
Jason Blais
|
|
|
|
Plan Modification Accepted | | | 11/24/2010 | | |
|
|
|
Plan modification excepted for BLD06-02323, To remove 2nd exits from level2 and 3e.1 and e.2 units-remodel master closets,remove 2 nd exits from level4 unit f-remodelmasterbedroom suites.remodel level4 unit d2,remove 2nd exits from level 2 and 3c units,remodeld units on levels 1 and 2 . remove 2nd exit requirement from level 1.add square footage on level 2. Add hallway between lobby and trash in building 3.routed to Sam Z fro review. Affected sheets are cov,a012,a013,a206,a206.2,a206.3,a207,a207.2,a207.4,a207.5,a208,a208.1,a208.3,a208.4,a2069,a209.2,a209.3,a209.4,a212,a212.2,a212.3,a213,a213.2,a213.4,a213.5,a214,a214.1,a214.3,a214.4,a215,a215.2,a215.3,a215.4,s2.06w,s2.07,s2.08,s2.09,s2.12w,s2.13,s2.14,s2.15,s5.08,m305,m306,m307,m308,m310,m311,m312,m313,m405,m406,m407,m408,m410,m411,m412,m413.
|
BLD-Aging Inspection | 10/25/2010 | 10/25/2010 | 10/25/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 8/23/2010 | 8/23/2010 | 8/23/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 6/23/2010 | 6/23/2010 | 6/23/2010 | P | PART |
Tom Arcoraci
|
|
|
partial fourth floor
|
BLD-Aging Inspection | 5/3/2010 | 5/3/2010 | 5/3/2010 | | PART |
Tom Arcoraci
|
|
|
|
Case Summary (BLD) | | | 3/15/2010 | | DONE |
|
|
|
|
BLD-Aging Inspection | 3/2/2010 | 3/2/2010 | 3/2/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 12/31/2009 | 12/31/2009 | 12/31/2009 | P | PART |
Tom Arcoraci
|
|
|
Tom, please call Bob Thornton. Internet Inspection Request from: Bob Thornton ext walls 4 th floor ok to insul
|
BLD-Conference | 11/20/2009 | 11/20/2009 | 11/20/2009 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok
|
Telephone call | | | 10/16/2009 | | DONE |
|
|
|
left vm for richard at ###-#### - permit (plan mod) ready and fees given
|
Override - Parcel Holds | | | 10/16/2009 | | |
|
|
|
|
Permit Ready to Issue | | | 10/16/2009 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/16/2009 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/16/2009 | | |
|
|
|
|
Plan assigned to (DRS) | 10/8/2009 | 10/8/2009 | 10/15/2009 | | PASS |
Dan Stuart
|
|
|
10/15/2009 15:55:31 DRS - activity updated through activity BLDA022 from case BLD06-02323.
|
Routing - PLAN CHECK | 10/15/2009 | | 10/15/2009 | | PASS |
Dan Stuart
|
|
|
No resubmittals required.
|
Routing - PUBLIC WORKS | 10/13/2009 | | 10/15/2009 | | PASS |
Beverly Hall
|
|
|
Plan mod 10-8-09 Added roof drains & downspouts to storm water system. Added transformer pad.
|
Routing PW Drainage | 10/13/2009 | | 10/15/2009 | | PASS |
Brian Murphy
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/15/2009 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 10/13/2009 | | |
|
|
|
|
Plan Modification Accepted | | | 10/8/2009 | | |
Dan Stuart
|
|
|
Plan mod rec'd to add roof drains and downspouts to the store water system and add transformer pad to back drive; three copies of sheet C3.0; C4.0; & C4.1
|
BLD-Aging Inspection | 9/25/2009 | 9/25/2009 | 9/25/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 6/11/2009 | 6/11/2009 | 6/11/2009 | P | PASS |
Tom Arcoraci
|
|
|
Look at the ceiling grid in the 1st floor corridor and lobby of bldg 3. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Aging Inspection | 4/13/2009 | 4/13/2009 | 4/13/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 1/19/2009 | 1/20/2009 | 1/20/2009 | A | PART |
Tom Arcoraci
|
|
|
Bldg 3 lobby soffit framing. Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok
|
BLD-Wall cover | 12/31/2008 | 12/31/2008 | 12/31/2008 | P | PASS |
Tom Arcoraci
|
|
|
Inspect the drop ceiling at bldg 3 carport. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Conference | 12/10/2008 | 12/11/2008 | 12/11/2008 | A | PART |
Tom Arcoraci
|
|
|
Inspect the bldg 3 lobby for cover. Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok
|
BLD-Framing/Rough-in | 11/4/2008 | 11/4/2008 | 11/4/2008 | P | PART |
Tom Arcoraci
|
|
|
Discuss SCR cable Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok
|
BLD-Conference | 11/4/2008 | 11/4/2008 | 11/4/2008 | P | DONE |
Jim Sly
|
|
|
Tom, Bring Jim Sly to discuss SCR cable. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Wall cover | 10/29/2008 | 10/29/2008 | 10/29/2008 | P | PASS |
Jim Sly
|
|
|
Inspect the 2nd floor of bldg 3. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Conference | 10/23/2008 | 10/23/2008 | 10/23/2008 | P | CANC |
Jim Sly
|
|
|
I will have some information on the flame spread and smoke development for the SCR cable. Phone #: ###-#### Internet Inspection Request from: Bob Thornton Canc by Contr...
|
BLD-Conference | 10/21/2008 | 10/22/2008 | 10/22/2008 | A | DONE |
Jim Sly
|
|
|
I''ll be out to a meeting from 10:00 to 1:00. Call me before or after. Phone #: ###-#### Internet Inspection Request from: Bob Thornton Met with Bob ... Gave him copy of Chapter 8 2003 IBC
|
BLD-Energy code compliance | 10/6/2008 | 10/7/2008 | 10/7/2008 | A | PASS |
Jim Sly
|
|
|
Inspect the 3rd floor of bldg 3 Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Energy code compliance | 10/3/2008 | 10/6/2008 | 10/6/2008 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Thornton 3rd and 4th floors
|
BLD-Framing/Rough-in | 10/1/2008 | 10/2/2008 | 10/2/2008 | A | PART |
Jim Sly
|
|
|
Inspect 4th floor, 3rd floor and misc mechanical rooms. Phone #: ###-#### Internet Inspection Request from: Bob Thornton OK to cover....Lounge Ceiling, all Mech Rooms (1 side), 3rd and 4th floors.
|
BLD-Energy code compliance | 9/24/2008 | 9/25/2008 | 9/25/2008 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Thornton 4 units in Bldg #3............. NOTE: All previous inspections were called in by contractor (by mistake) on Permit # BLD 06-02320 which was for Underground parking shell.
|
BLD-Aging Inspection | 7/16/2008 | 7/16/2008 | 7/16/2008 | | PASS |
Tom Arcoraci
|
|
|
|
Plan resubmittals received | | | 7/7/2008 | | |
George Slane
|
|
|
Received a cover transmittal, letter to George Slane dated 7-2-08 from Richard Honsinger, copy of 2007 supplement to the IBC (2 pages), 3 copies of sheets A013, A012 and taken to George Slane's desk///7-7-08 @ 10:25am BAS
|
Case Summary (BLD) | | | 5/15/2008 | | |
|
|
|
|
BLD-Aging Inspection | 5/13/2008 | 5/13/2008 | 5/12/2008 | | NR |
Tom Arcoraci
|
|
|
wip
|
Plan resubmittals received | | | 1/23/2008 | | |
|
|
|
Received 1 cover transmittal, 1 letter from Rishard Honsinger dated 1-22-08, 1 copy of sheet SK1/A900 and taken to Marlene Southard's desk///1-23-08 @ 2:30pm BAS
|
Issue PAID IN FULL permit | | | 12/27/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/11/2007 | | |
|
|
|
|
Telephone call | | | 12/11/2007 | | DONE |
|
|
|
Left message with Anna for Dave Holm that permit is ready-emailed break down of fees///12/11/07 @ 9:15am BAS
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/10/2007 | | DONE |
|
|
|
Plans reviewed and approved by Mike Phillips. Plans taken to permit desk to issue by MSouthard
|
Telephone call | | | 12/10/2007 | | DONE |
|
|
|
Left phone message and wrote an E-mail to Nan at ACHD regarding how to charge for the 2 guest suites without kitchens///12/10/07 @ 1:15pm BAS
|
Plan assigned to (M_P) | 8/14/2006 | | 12/10/2007 | | PASS |
|
|
|
12/10/2007 11:36:21 MYS - activity updated through activity BLDA022 from case BLD06-02323.
|
Routing - PLAN CHECK | 11/7/2007 | | 11/27/2007 | | PASS |
|
|
|
Plans have been approved by all reviewing agencies and approved per notes placed on plans and all attched plan review comments / conditions.
|
Routing - PLANNING | 11/27/2007 | | 11/27/2007 | | PASS |
|
|
|
Approved per DRH07-00548 and per the Conditional Use Permit as reviewed by Schafer and Riddle.
|
Routing - PLAN CHECK | 10/22/2007 | | 11/7/2007 | | ---- |
|
|
|
Routing to Fire
|
Telephone call | | | 11/7/2007 | | DONE |
|
|
|
Spoke with Richard honsinger. richard verifys that building 31 will have a remote PIV for the fire sprinkler system. Buildings 2 & 3 will have a WPIV for the fire sprinkler main control valve.
|
Routing - FIRE | 11/7/2007 | | 11/7/2007 | | PASS |
|
|
|
Spoke with Richard honsinger. richard verifys that building 1 will have a remote PIV for the fire sprinkler system. Buildings 2 & 3 will have a WPIV for the fire sprinkler main control valve.
|
Routing - FIRE | 10/18/2007 | | 10/22/2007 | | FAIL |
|
|
|
Faxed revised IFC review comments to architect. Attached IFC review comments to plans.
|
Routing Off Site - STRUCTURAL | 10/18/2007 | | 10/18/2007 | | DONE |
|
|
|
10/18/07 - Routed to outside structural review copies of resubmittal structural plan sheets for reference. (msouthard)
|
Routing - PLAN CHECK | 9/7/2007 | | 10/18/2007 | | PEND |
|
|
|
Routing on to Fire while Dan S. is preparing plan review follow up report and waiting for structural review comments.
|
Routing Off Site - STRUCTURAL | 10/16/2007 | | 10/18/2007 | | PASS |
|
|
|
10/16/07 - Sent pdf of resubmitted documents & calcs to outside engineer for review. Documents dated 9/7/07 and we received them on 10/11/07. (msouthard)
10/18/07 - Approved w/requirements for deferred submittals after the permit is issued. Structural engineer of record is to provide additional information on regarding holdowns and connections after the permit is issued. See structural plan review comments incorporated into the "building plan check" document attached to plans. (review comments from outside engineer also scanned into document section of this permit).
|
Routing - PLUMBING | 10/17/2007 | | 10/17/2007 | | PASS |
|
|
|
secondary drainage will be required for roof and deck areas with wall enclosures,
|
Plan resubmittals received | | | 10/15/2007 | | |
|
|
|
Received 1 cover transmittal, 1 responce letter from Tikker Engineering with supplemental calcs, 1 responce letter from Kieffer Design Group, 1 responce letter from Driscoll Architecs and the following sheets-A201, A202, A203, A204, 205, A206, A207, A208, A209, A210, A211, A212, A213, A214, A215, A216, A217, A218, A219, A220, A221, A230, A237, A238, A239, A240, A241, A242, A244, A253, A305, A704, A800, A801, A802, A803, A810, A811, ID.19, M500,M501, M514, M515, E1.1 are at Barb's desk for insertion///10/15/07 @ 4:45pm
A structural supplemental calcs book and the following sheets-S1.00, S1.01, S2.00, S2.01F, S2.01R, S2.01W, S2.02, S2.03, S2.04, S2.04A, S2.04B, S2.05, S2.06F, S2.06R, S2.06W, S2.07, S2.08, S2.09, S2.10, S2.10A, S2.11, S2.12F, S2.12R, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.16A, S2.17, S2.18F, S2.18R, S2.18W, S2.19, S2.20, S2.21, S2.21A, S2.21B, S3.00, S3.01, S3.02, S3.03, S4.00, S4.01, S4.02, S5.00, S5.01, S5.02, S5.03, S5.04, S5.05, S5.06, S6.00 for Marlene at Barb's desk 10/15/07 @ 4:45pm
|
Plan resubmittals received | | | 10/12/2007 | | |
|
|
|
Matt Siegenthaler inserted the following pages in to plans--Cov, A001, A002, A003, A012, A013, A200, A201, A202, A203, A204, A205, A206, A207, A208, A209, A210, A211, A212, A216, A217, A218, A219, A220, A221, A230, A231, A232, A233, A234, A235, A236, A243, A244, A245, A246, A247, A248, A249, A250, A251, A252, A253, A254, A260, A261, A262, A270, A271, A272, A300, A301, A302, A303, A304, A310, A325, A360, A361, A362, A363, A364, A365, A500, A700, A701, A702, A703, A704, A705, A706, A707, A710, A800, A801, A802, A803, A804, A810, A811, A813, A822, A900, A902, WP-000, WP-001, WP-002, WP-003, WP-004, WP-005, WP-006, WP-007, ID.01, ID.01A, ID.02, ID.02A, ID.13, ID.14, ID.15, ID.19A, S1.00, S1.01, S2.01W, S2.02, S2.03, S2.04, S2.04A, S2.04B, S2.06W, S2.07, S2.08, S2.09, S2.10, S2.10A, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.16A, S2.18W, S2.19, S2.20, S2.21, S2.21A, S2.21B, S5.00, S5.01, S5.03, S5.04, S5.05, S5.06, S6.00, M100, M101, M102, M103, M104, M200, M201, M202, M203, M204, M300, M301, M302, M303, M314, M315, M316, M317, M400, M401, M402, M403, M405, M410, M414, M415, M416, M417, M500, M501, M502, M503, M504, M505, M508, M509, M510, M513, M514, M515, M516, M517, FP100, FP101, FP102, FP103, FP104, FP105, FP106, FP107, FP108, FP109, FP110, E0.0, E1.0, E1.2, E1.3, E1.4, E1.5, E1.6, E1.7, E1.8, E1.9, E2.0, E2.1.0L, E2.1.0P, E2.1.1L, E2.1.1P, E2.1.3L, E2.1.3P, E2.1.4, E2.10, E2.14, E2.16, E2.17, E2.18, E2.19, E2.2.1L, E2.2.1P, E2.21, E2.3.1L, E2.3.1P, E2.4.0L, E2.4.0P, E2.4.1L, E2.4.1P, E2.4.2L, E2.4.2P, E2.4.3L, E2.4.3P, E2.4.4, E2.5, E2.6, E2.8, E2.9, E3.0, C1.0, C2.0, C3.0, C3.1, C3.2, C3.3, C3.4, C3.5, C3.6, C3.7, C3.8, C4.0, C4.1, C4.2, C4.3, C4.4, C4.5, C5.0, C6.0, C7.0, C8.0, Letters from Driscoll Architects for responce comments, info from Creighton Engineers regarding Fire Suppression, Info from Kieffer Design Group regarding interior, info from Tikker for MEC & PLM, Info from Musgrove regarding ELE, info from Yu & Trochalakis regarding structural, Responce & supplemental calcs
|
Routing - PLAN CHECK | 8/30/2007 | | 9/7/2007 | | FAIL |
|
|
|
Second ref=view failed. Sent correction report to the architect, additional informarmation is requried to be submitted for further review prior to issuing permit.
|
Routing Off Site - STRUCTURAL | 8/9/2007 | | 9/7/2007 | | FAIL |
|
|
|
Called Action Courier for pick up 8/9/07 @ 9:45 BAS
Second review failed. Sent correction report to the architect. Additional information is required to be submitted and review by the outside engineering firm prior to permit issuance.
|
Plan resubmittals received | | | 8/31/2007 | | |
|
|
|
Received FP100, FP101, FP102, FP103, FP104, FP105, FP106, FP107, FP108, FP109, FP110; taken to Mike Phillips
|
Routing - FIRE | 8/27/2007 | | 8/30/2007 | | FAIL |
|
|
|
Emailed and faxed resubmittal items to architect.
|
Routing - PLAN CHECK | 3/12/2007 | | 8/27/2007 | | ---- |
|
|
|
Routing to fire.
|
Plan resubmittals received | | | 8/10/2007 | | |
|
|
|
received 1 transmittal and 2 copys of sheets A201,A243 taken to Mike P
|
Plan resubmittals received | | | 8/8/2007 | | |
|
|
|
Received transmittal and one copy of pages A205, A206, A207, A208, A209, A210, A211, A212, A213, A214, A215, A216; taken to Mike Phillips
|
Plan resubmittals received | | | 8/6/2007 | | |
|
|
|
received 1 transmittal, 2 response,1 calc book and 2 copys of sheets a002,a003,a200,a201,a203,a204,a205,a206,a207,a208,a209,a210,a211,a212,a213,a214,a215,a216,a217,a218,a219,a220,a221,a232,a233,a234,a235,a236,a237,a238,a239,a240,a241a242,a243,a244a,a245,a246,a247,a248,a249,a250,a251a252,a217,id.19a,c1.0,c2.0,c3.0,c3.1,c3.2,c3.3,c3.4,c3.5,c3.6,c3.7,c.08,c4.0,c4.1,c4.2,c4.3,c4.4,c5.0,c6.0,c7.0,c8.0,s1.00,s1.01,s2.s2.06w,s2.07,s2.08,s2.09,s2.10,s2.10a,s2.12w,s2.13,s2.14,s2.15,s2.16a,s5.00,s5.01,s5.02,s5.03,s5.04,s5.05,s6.00,m1.00,m101,m102,m103,m104,m200,m202,m304,m305,m306,m307,m308,m309,m310,m311,m312,m313,m404,m405,m406,m407,m408,m409,m410,m411,m412,m413,m504,m505,m506,m507m508,m509,m510,m511,m512,m513,e0.0,e1.1,e1.2,e1.3,e1.4,e1.6,e1.7,e1.8,e1.9,e2.0,e2.11,e2.12,e2.13,e2.15,e2.18,e2.19,e2.20,e2.20l,e2.20p,e2.21l,e2.22,e2.2.2l,e2.2.2p,e2.23,e2.2.3L,e2.2.3p,e2.24,e2.2.4L,e2.2.4p,e2.2.5,e2.3.0L,e2.3.0p,e2.3.1L,E2.3.1p,e2.3.2L,e2.3.2p,e2.3.3L,e2.3.3p,e2.3.4;,e2.3.4p,e2.3.5,e2.7,e3.0 taken to Mike P.
|
Routing Off Site - STRUCTURAL | 3/19/2007 | | 3/26/2007 | | FAIL |
|
|
|
Called Action Couriers for pick up 9:52 3-19-07
|
Plan resubmittals received | | | 3/15/2007 | | |
|
|
|
received transmittal letter from erstad arch & "3" sets of plans including S1.OO, S1.O1, S2.06W, S2.07, S2.08, S2.09, S2.10, S2.12W, S2.13, S2.14, S2.15, S2.16, S5.00, S5.01, S5.02, S5.03, S5.04, S6.00, -plans taken to mike phillips
|
Plan resubmittals received | | | 3/15/2007 | | |
|
|
|
received transmittal letter from erstad arch & "1" set of plans including S1.00, S1.O1, S2.O5, S2.O6-F, S2.06-R, S2.O6W, S2.O7, S2.08, S2.09, S2.10, S2.11, S2.12-F, S2.12-R, S2.12W, S2.13, S2.14, S2.15, S2.16, S3.00, S3.01, S3.02, S3.03, S3.04, S4.00, S4.01, S4.02, S5.00, S5.01, S5.02, S5.03, S5.04, S6.00--plans taken to mike phillips
|
Routing - FIRE | 3/6/2007 | | 3/12/2007 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 1/29/2007 | | 3/6/2007 | | FAIL |
|
|
|
Plan review completed, sent correction report to the architect requesting additional informaiotn to be submitted for further review prior to issuing the building permit.
|
Routing - PLUMBING | 1/29/2007 | | 1/29/2007 | | FAIL |
|
|
|
no corrections made
|
Routing - PLAN CHECK | 9/25/2006 | | 1/29/2007 | | ---- |
|
|
|
Plans routed back to Plumbing for review. Building code items not reviewed at this time.
|
Plan resubmittals received | | | 12/8/2006 | | |
|
|
|
Received 4 copies of pages M100, M200, M201, M202, M203; taken to Mike Phillips
|
Routing - PLANNING Land Div | 12/8/2006 | | 12/8/2006 | | PASS |
|
|
|
|
Routing - FIRE | 9/21/2006 | | 9/25/2006 | | FAIL |
|
|
|
Faxed resubmittal items to architect. Reviewed for water supply and access only.
|
1st review completed | | | 9/25/2006 | | FAIL |
Mike Phillips
|
|
|
|
Routing - PLAN CHECK | 9/6/2006 | | 9/21/2006 | | |
|
|
|
PLANS ROUTED TO FIRE FOR ACCESS & WATER REQUIREMENTS ONLY. Review for all building code requirements not completed at this time.
|
Routing - PLANNING | 9/5/2006 | | 9/6/2006 | | FAIL |
|
|
|
Failed both DR and CU. Letter to be issued. DRH05-00397 and CUP05-00015.
|
Routing - PLUMBING | 8/30/2006 | | 9/5/2006 | | FAIL |
|
|
|
plans anr incomplete, please address the above listed items.
|
Routing - Erosion and Sediment | 8/29/2006 | | 8/30/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/22/2006 | | 8/29/2006 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/15/2006 | | 8/28/2006 | | FAIL |
|
|
|
8/15/06 - Called Action Courrier for pick up 8/15/06 @ 12:30pm BAS. Original submittal includes structural for concrete package only.
8/28 - Concrete package review received. Review failed.
|
Routing - Addressing | 8/24/2006 | | 8/24/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 8/14/2006 | | 8/22/2006 | | FAIL |
|
|
|
parcels not combined
|
Plan routing begun/NEW & ADDTN | | | 8/14/2006 | | |
|
|
|
|
Application received | | | 8/14/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/14/2006 | | |
|
|
|
|
First Notice | | 2/2/2017 | | | |
|
|
|
|
First Notice | | 2/2/2017 | | | |
|
|
|
|
First Notice | | 1/22/2017 | | | |
|
|
|
|