Permit Information
Permit NumberBLD06-02323
StatusFinaled
Name FALASH & ROSS CONSTRUCTION
Site Address 3005- 3059 W CRESCENT RIM DR
Project NameCRESCENT RIM #2 #3-CONDOS
Customer Number 
ePlanReviewNo
Description
(CRESCENT RIM BUILDINGS #2 & #3 - RESIDENTIAL UNITS) 8/24/11 Plan Mod deleting additional 90 minute fire rated door at entrance to elevator in the basement, floor P-1, as indicated on original plans. Elevator doors are fire-rated already and there is an elevator lobby on original plans at the basement elevator entry. drs 6/1/11 - Plan Modification - REMOVE EXIT SIGNS FROM DOORS (#39) BETWEEN MAIN LOBBYAND THE OUTSIDE POOL AREA TO ALLOW THEM TO BE SECURED DURING TIMES THE POOL AREA IS CLOSED; THERE ARE TWO EXISTING STAIR ENCLOSURES WHICH WILL SERVE AS THE REQUIRED EXITS (DOORS #25 & #50) FROM THE POOL AREA AND ARE AVAILABLE AT ALL TIMES FOR EGRESS; STAIR ENCLOSURE ACCESSED BY DOOR #25 WILL BE MODIFIED FOR COMPLIANCE AS AN AREA OF REFUGE w/TWO-WAY COMMUNICATION SYSTEM. SEE ADDED CODE CLARIFICATION PLAN REVIEW COMMENT .5, FOR THIS PLAN MOD THAT ARE APPLICABLE TO THIS PROJECT. ALL PREVIOUS PLAN REVIEW COMMENTS OR CONDITIONS NOT MODIFIED BY THIS PLAN MOD SHALL REMAIN IN EFFECT FOR THIS PROJECT. drs 11/23/10 - PLAN MOD and ALTERNATE REQUEST letter to allow use of Sec. 1014.3, 2006 IBC to increase maximum allowable travel distance to 125' and increase allowed occupant load to 20 per Sec. 1015.1, exception 1, 2009 IBC to allow reduction from 2 exits under 2003 IBC to only one required per noted code sections for Units E.1 & E.2 level 2 and remodel master closets; Unit F, level 4; Unit C, 2nd & 3rd levelsRemodel D Units, level 1 & 2, removing requirement for 2nd exit on level1 and adding square footage on level 2; remodel Unit D.2, level 4; and add hallway between Lobby & Trash in Building 3. Select structural changes of shear walls and floor support in remodeled units per engineering design calcs and structural plans. All other units / floor plans / structure to remain and be compliance with plans issued with the original permit and plan modifications. drs PLAN MOD 10-8-09. ADDED ROOF DRAINS AND DOWNSPOUTS TO THE STORM WATER SYSTEM. ADDED TRANSFORMER PAD TO BACK DRIVE. ALL OTHER PLANS AND PLAN REVIEW ITEMS REMAIN AS ORIGINALL APPROVED. drs To construct a new 115,017 sq. ft., four story, 41 dwelling units, residential condominium building with 2 guest suites (without kitchens), located above an enclosed basement parking garage. The first floor area is 31,807 sq.ft., includes the 2 guest suites, 3 multi-purpose rooms, a residential style common area kitchen, common area storage rooms, a pool equipment room, covered guest parking area and 8 dwelling units. The second floor is 31,689 sq.ft.and is divided between 14 dwelling units. The third floor is 26,233 sq.ft. and is divided between 10 dwelling units. The fourth floor is 25,288 sq.ft. and is divided between 9 dwelling units. The 2 guest suites are less than 800 sq.ft., the remaining units in Bldg 2 & 3, each of which exceed 800 sq.ft. of floor area. Note: The installation of a NFPA 13 fire sprinkler system is required throughout this building and is used for area increase. All construction shall be per the approved plans and attached comment lists. DEFERRED SUBMITTALS AFTER PERMIT ISSUANCE REQUIRED BY STRUCTURAL ENGINEER AND FIRE. Refer to BLD06-02320 for the construction of the parking garage. MJP DRH 05-00397 CUP 04-00107
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  1/23/2017 DONE
Permanent Occupancy  1/23/2017 DONE
Telephone call  1/12/2017 DONE
called Bill to let him know there will be a final ele tomorrow. Thats the last permit that needs finaled. Once that is done we can iss the perm c of o
Telephone call  1/12/2017 DONE
called Bill again to let know that i would just email him the C of O on Tuesday as long as the final ele was passed 1/13/17
Print Occupancy Form  1/12/2017 DONE
Permanent Occupancy  1/12/2017 DONE
Telephone call  1/3/2017 DONE
emailed Andrea T, Sarah S, Bob A, Troy J & Tiffiany L to see if all inspections have been done so we can issue the perm c of o-everyone but Bob A have replied that they are good to sign off on the perm c of o
Telephone call  1/3/2017 DONE
called Bill Clark @###-#### ext 13-left message on his ext that I'd like him to call me in referrence to the perm C of O that is almost ready to be issued
BLD-Final12/7/201612/8/201612/8/2016PPASS
DetailsDave Hannah
gil Phone #: ###-#### ste 201 bld 2
FIRE-Final Inspection12/6/201612/7/201612/7/2016APASS
DetailsTroy Cobbley
bldg 2 suite 201 life safety passed
BLD-Final11/4/201611/4/201611/4/2016PPASS
DetailsDave Hannah
Tim Phone #: ###-#### bldg 3, ste 401
BLD-Final11/2/201611/3/201611/3/2016PNR
DetailsJim Sly
Dave Phone #: ###-####
FIRE-Final Inspection11/2/201611/3/201611/3/2016APART
DetailsTroy Cobbley
BUILDING #3 – Suite #401 Life safety passed
BLD-Aging Inspection10/26/201610/26/201611/3/2016 PEND
DetailsDave Hannah
Telephone call  10/18/2016 DONE
Bill called and i sent him a temp c of o for bldg 3 unit 204
Temporary Occupancy9/16/201612/15/20169/16/2016 DONE
DetailsCandy A. Nichols
As per Jason Blais-ok for temp c of o good for 6 months -all units that have temp c of o's are building 2 units 101, 102,103, 104, 202, 203, 204, 205, 206, 207, 301, 302, 303, 304, 305,401, 402, 403, 404 & 405 Building 3 units 101, 102, 103, 104, 201, 202, 203, 204, 205, 206, 207, 301, 302, 303, 304, 305, 402, 403,
404 (2-201 & 3-401 are the only two left to be done)
Temporary Occupancy8/18/201611/16/20168/18/2016 DONE
DetailsCandy A. Nichols
****forgot to change conditions see next temp***Jason Blais ok'd extension for 6 months-bldg 2 unit 201 is the only unit left to complete with this permit-bldg 3 unit 401 is under permit # BLD16-02993
Telephone call  8/18/2016 DONE
called Gil to see if they could request a extension temp C of O. All units in both bldg 2 & 3 are complete but 2 units. Bldg#3-unit 401 has it's own permit see BLD16-02293. Bldg #2-unit 201 has not been completed and Gil thinks it'll need to be extended until the end of the year. Jason Blais ok'd an extension good for 6 months thru today. I called Bill Clark and asked him to send me a email requesting the extension
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 3 unit 101-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 3 unit 305-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 3 unit 304-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 3 unit 301-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 3 unit 207-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 3 unit 206-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 3 unit 204-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 3 unit 203-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 3 unit 202-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 3 unit 103-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 3 unit 102-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 2 unit 403-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 2 unit 401-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 2 unit 305-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 2 unit 301-ok for final C of O Phone #: ###-####
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 2 unit 104-ok for final C of O
BLD-Final8/17/20168/17/20168/17/2016PPASS
DetailsJim Sly
final on bldg 2 unit 103-ok for final C of O
Case Summary (BLD)  8/5/2016 DONE
BLD-Final7/12/20167/13/20167/13/2016PPEND
DetailsDave Hannah
Dave unit #2-101 Phone #: ###-#### ok for temp occ ok for perm after bldg gos perm
FIRE-Final Inspection7/12/20167/13/20167/13/2016APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final6/17/20168/15/20126/17/2016APASS
DetailsTom Arcoraci
****notes from 8/15/12 inspection request***-call first -- units 207, 206, 203 -- Gill Phone #: ###-#### those units in bld 3 ok for occupancy-6/17/16 as per Bob A. ok to issue C of O's for Bldg 3-units 207, 206 & 203
Telephone call  6/17/2016 DONE
emailed Brooke Seidl a copy of the C of O for bld 3 unit 207 as per her request
Telephone call  6/16/2016 DONE
Brooke Seidl emailed a request for a C of O for bldg 3 unit 207 but there was no permit issued for that unit. I told her she would need to have the GC call in inspection.
Case Summary (BLD)  6/15/2016 DONE
Case Summary (BLD)  6/15/2016 DONE
Case Summary (BLD)  6/15/2016 DONE
BLD-Aging Inspection5/19/20165/19/20165/26/2016 PEND
DetailsDave Hannah
BLD-Final3/10/20163/11/20163/11/2016PPART
DetailsJim Sly
Dave Phone #: ###-####
Bldg 3 ....unit 205 OK to occupy.
FIRE-Final Inspection3/10/20163/11/20163/11/2016APART
DetailsTroy Cobbley
life safety for Building #3, Unit 205 passed
BLD-Aging Inspection1/22/20161/22/20161/27/2016 PEND
DetailsDave Hannah
Temporary Occupancy11/20/20152/18/201611/20/2015 DONE
DetailsCandy A. Nichols
BLD-Final11/3/201511/4/201511/4/2015APASS
DetailsJim Storey
Apartment 3-303 - Dave Phone #: ###-####
FIRE-Final Inspection11/3/201511/3/201511/3/2015PPART
DetailsTroy Cobbley
Apartment 3-303 - Life safety passed
BLD-Aging Inspection9/23/20159/23/20159/29/2015 PASS
DetailsDave Hannah
BLD-Final7/24/20157/28/20157/28/2015PPASS
DetailsJim Sly
Dave-bldg 2-102 Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection7/24/20157/28/20157/28/2015APASS
DetailsJim Page
Bldg 2-102 Life fire safety passed/complete
BLD-Aging Inspection6/17/20156/17/20156/23/2015 PEND
DetailsDave Hannah
Temporary Occupancy4/30/20157/29/20154/30/2015 DONE
DetailsCandy A. Nichols
BLD-Final4/6/20154/7/20154/7/2015PPASS
DetailsDave Hannah
Building 3 403// Dave Phone #: ###-####
FIRE-Final Inspection4/6/20154/7/20154/7/2015APASS
DetailsScott Arellano
Approved.
BLD-Aging Inspection2/25/20152/25/20152/27/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection12/15/201412/15/201412/22/2014 PEND
DetailsDave Hannah
Temporary Occupancy10/30/20141/28/201510/30/2014 DONE
DetailsCandy A. Nichols
as per Jason B. extension granted today 10-30-14
BLD-Final10/15/201410/16/201410/16/2014APASS
DetailsDave Hannah
Dave-Bldg 2 unit 304 Phone #: ###-####
FIRE-Final Inspection10/13/201410/13/201410/13/2014PPASS
DetailsCraig D. Hanson
Bldg 2, unit 305 // Dave Phone #: ###-####
FIRE-Final Inspection8/27/20148/28/20148/28/2014APART
DetailsForrest France
Unit 205 building #2 passed fire life safety final inspection.
BLD-Final8/27/20148/28/20148/28/2014APASS
DetailsDave Hannah
Gil-please call 20 mintues prior Unit #2-205 Phone #: ###-####
BLD-Final8/8/20148/11/20148/11/2014PPASS
DetailsDave Hannah
call before // for units 2-402 & 2-20 ... 4Gill Phone #: ###-####
FIRE-Final Inspection8/8/20148/11/20148/11/2014APASS
DetailsForrest France
Fire life safety inspection for units 204 and 402 building #2 passed inspection.
BLD-Final7/9/20147/11/20147/11/2014APASS
DetailsJim Storey
Gil Phone #: ###-#### final ok for unit 2-207
FIRE-Final Inspection7/9/20147/10/20147/10/2014APART
DetailsForrest France
Fire life safety inspection passed for unit 207 building #2.
FIRE-Final Inspection5/2/20145/2/20145/2/2014PPART
DetailsForrest France
Building #2 unit 303 and building #3 unit 404 passed fire life safety inspection.
BLD-Final5/2/20145/2/20145/2/2014PPASS
DetailsTom Arcoraci
gale - please call 20 minutes prior - bldt2-303 and bld 3-404 Phone #: ###-#### ok for occ
BLD-Final3/28/20143/31/20143/31/2014PPASS
DetailsTom Arcoraci
bld2-202Gill Phone #: ###-#### ok for occ
FIRE-Final Inspection3/28/20143/31/20143/31/2014APART
DetailsForrest France
Fire life safety for building #2 unit 202 passed inspection.
FIRE-Final Inspection3/12/20143/13/20143/13/2014APART
DetailsForrest France
Building 2 unit 403 passed fire life safety inspection.
FIRE-Final Inspection3/12/20143/13/20143/13/2014APART
DetailsForrest France
Building 3 unit 305 passed fire life safety inspection.
BLD-Final3/12/20143/13/20143/13/2014APASS
DetailsTom Arcoraci
call before // (bldg 3- unit 305) //Gale Phone #: ###-#### ok for final
BLD-Final3/12/20143/13/20143/13/2014APASS
DetailsTom Arcoraci
call before // (bldg 2- unit 403) //Gale Phone #: ###-#### ok for final
Temporary Occupancy1/31/20145/1/20141/31/2014 DONE
DetailsBarbara Stitt
Temorary Occupancy extension granted until 8/5/14 per Jason Blais-see scanned documents//1/31/14 BAS
BLD-Aging Inspection1/20/20141/20/20141/21/2014 PEND
DetailsTom Arcoraci
Temporary Occupancy11/22/20132/20/201411/22/2013 DONE
DetailsBarbara Stitt
Approved temporary occupancy extension per Jason Blais from 11-5-13-see scanned documents//11-22-13 BAS
BLD-Aging Inspection11/18/201311/18/201311/18/2013 PEND
DetailsTom Arcoraci
wip
Change Expiration Date Only  10/31/2013 DONE
DetailsBarbara Stitt
FIRE-Final Inspection9/18/20139/19/20139/19/2013APART
DetailsForrest France
Building #2 unit #405 passed fire life safety inspection.
BLD-Final9/18/20139/19/20139/19/2013APASS
DetailsTom Arcoraci
2405 gil please call 30 min before going out Phone #: ###-#### bld 2 unit 405 ok for temp
BLD-Final8/22/20138/23/20138/23/2013APASS
DetailsTom Arcoraci
gail - 3-304 Phone #: ###-#### bld 3 unit 304 ok
FIRE-Final Inspection8/22/20138/23/20138/23/2013APART
DetailsForrest France
Fire life safety inspection completed for unit 304 building #3. Contractor to relocate surface mounted light fixture in the utility room as discussed.
FIRE-Final Inspection8/19/20138/19/20138/19/2013PPART
DetailsForrest France
Fire life safety inspection for unit # 305 building #2 completed acceptable.
BLD-Final8/19/20138/19/20138/19/2013PPASS
DetailsTom Arcoraci
gail Phone #: ###-#### building 2 unit 305 ok for occ
BLD-Aging Inspection8/14/20138/14/20138/14/2013 PEND
DetailsTom Arcoraci
Temporary Occupancy8/5/201311/3/20138/5/2013 DONE
DetailsBarbara Stitt
FIRE-Final Inspection6/14/20136/17/20136/17/2013APART
DetailsForrest France
Building #2 unit 302 passed fire life safety inspection.
BLD-Final6/14/20136/17/20136/17/2013APEND
DetailsTony Young
call 20 min before to meet//bldg 2-302 //Gill Phone #: ###-####,, ok pending others
BLD-Final5/23/20135/24/20135/24/2013APASS
DetailsTom Arcoraci
GIL please call before going out Phone #: ###-#### bld 2 unit 206 ok for occ
FIRE-Final Inspection5/23/20135/23/20135/23/2013PPART
DetailsForrest France
Building 2 unit 206 passed fire life safety inspection.
BLD-Final5/15/20135/16/20135/16/2013APART
DetailsTom Arcoraci
Please call ahead - Unit 2-103 - Gil Phone #: ###-#### bld 2 unit 103 ok
BLD-Final5/15/20135/16/20135/16/2013APART
DetailsTom Arcoraci
Please call ahead - Unit 3-301 - Gil Phone #: ###-#### bld 3 unit 301 ok
FIRE-Final Inspection5/15/20135/16/20135/16/2013APART
DetailsForrest France
Please call ahead - Unit 3-301 - Gil Phone #: ###-#### * Unit 301 fire life safety okayed
FIRE-Final Inspection5/15/20135/16/20135/16/2013APART
DetailsForrest France
Please call ahead - Unit 2-103 - Gil Phone #: ###-#### * Unit 103 fire life safety inspection passed
BLD-Final4/11/20134/12/20134/12/2013APASS
DetailsTom Arcoraci
gil - call 30 mins prior to meet Phone #: ###-#### bld 2 units 301 and 401 ok for occ
FIRE-Final Inspection4/11/20134/11/20134/12/2013PPART
DetailsForrest France
Building #2 units 301 and 401 fire life safety okay pending removal of travel cap and ceiling repair at 301 mech closet, provide intermediate temp. head at one bedroom and install missing escutcheon.
FIRE-Final Inspection2/20/20132/21/20132/21/2013APART
DetailsForrest France
Building #2 suite 104 passed final fire life safety inspection.
BLD-Final2/20/20132/21/20132/21/2013APASS
DetailsTom Arcoraci
call before//suite 2-104 only//Gil Phone #: ###-#### bld 2 104 ok tma
Change Expiration Date Only  2/12/2013 DONE
DetailsBarbara Stitt
See scanned documents temp occupancy will expire 8-12-13//BAS
BLD-Final1/3/20131/4/20131/4/2013APASS
DetailsTom Arcoraci
Blg 2 unit 203 - gil Phone #: ###-#### ok
FIRE-Final Inspection1/3/20131/4/20131/4/2013APART
DetailsTroy Cobbley
Blg 2 unit 203 life safety passed.
BLD-Final12/17/201212/18/201212/18/2012ACANC
DetailsTom Arcoraci
Blg 3 unit 204 - Rich Phone #: ###-####
FIRE-Final Inspection12/6/201212/6/201212/7/2012APART
DetailsForrest France
Unit 204 building 3 life safety inspection completed. Fire alarm permit to include added horn at the extra bedroom pending.
BLD-Final12/3/201212/4/201212/4/2012ACANC
DetailsTom Arcoraci
FIRE-Final Inspection12/3/201212/3/201212/3/2012PFAIL
DetailsForrest France
Inspection for building 3 unit 204 failed due to overdue certifications on fire extinguishers at the common corrdior. Also need to test the new audible notification appliance at the second bedroom.
Extend Permit 90/180 days12/3/201212/3/201212/3/2012PPART
DetailsTom Arcoraci
unit 204 bld 3 ok for temp occ after fire signs off
BLD-Final11/30/201212/3/201212/3/2012ANR
DetailsTom Arcoraci
Bld 2 unit 204 - Rich Phone #: ###-#### needs fire insp
FIRE-Final Inspection11/13/201211/14/201211/14/2012APART
DetailsForrest France
Fire life safety inspection completed satisfactory for building #3 unit 104.
BLD-Final11/13/201211/14/201211/14/2012PPASS
DetailsTom Arcoraci
Call for access - Gayle Phone #: ###-#### building 3 unit 104 ok for temp occ
BLD-Final11/1/201211/2/201211/2/2012PCANC
DetailsTom Arcoraci
Gill-Building #2 #402 Building #3 201, #302, #402 Please call prior to inspection Phone #: ###-####
FIRE-Final Inspection11/1/201211/2/201211/2/2012APASS
DetailsForrest France
Building #2 unit 404, building #3 units 201,302, and 402 completed fire life safety inspections. Occupant notification must meet min. dB per NFPA 72.
BLD-Final11/2/201211/2/201211/2/2012APASS
DetailsTom Arcoraci
Gill-Building #2 #402 Building #3 201, #302, #402 Please call prior to inspection Phone #: ###-#### ok for occ
Extend Permit 90/180 days11/2/201211/2/201211/2/2012PCANC
DetailsTom Arcoraci
Gill-Building #2 #402 Building #3 201, #302, #402 Please call prior to inspection Phone #: ###-####
BLD-Final10/31/201211/1/201211/1/2012ANR
DetailsTom Arcoraci
PLease call prior to inspection--Gill-Building #2 #402, Building #3 #201, #302, #402 Phone #: ###-####
BLD-Aging Inspection10/15/201210/15/201210/15/2012 PEND
DetailsTom Arcoraci
FIRE-Final Inspection8/14/20128/15/20128/15/2012APART
DetailsForrest France
Fire life safety inspection at units 203, 206 and 207 passed.
BLD-Final8/14/20128/15/20128/15/2012PCANC
DetailsTom Arcoraci
call first -- units 207, 206, 203 -- Gill Phone #: ###-#### those units in bld 3 ok for occupancy
BLD-Final7/10/20127/10/20127/10/2012APART
DetailsTom Arcoraci
bld 3 unit 202 ok for occupanvy
Temporary Occupancy7/10/201210/8/20127/10/2012 DONE
DetailsChristina Prado
Temporary Occupancy7/10/201210/8/20127/10/2012 DONE
DetailsChristina Prado
BLD-Aging Inspection7/4/20127/4/20127/5/2012 PEND
DetailsTom Arcoraci
Temporary Occupancy6/12/20129/10/20126/12/2012 DONE
DetailsBarbara Stitt
Change Expiration Date Only  6/6/2012 DONE
DetailsBarbara Stitt
Temp occupancy extension per Jason Blais (see scanned documents) for 180 days//6-6-12//BAS
BLD-Aging Inspection4/23/20124/23/20124/23/2012 PEND
DetailsTom Arcoraci
BLD-Other2/22/20122/22/20122/22/2012PPEND
DetailsTom Arcoraci
BLD-Aging Inspection2/22/20122/22/20122/22/2012 PEND
DetailsTom Arcoraci
on temp
Temporary Occupancy12/30/20113/29/201212/30/2011 DONE
DetailsBarbara Stitt
Changed expiration date per Jason Blais request to be 6-22-12 and emailed to him.
BLD-Final12/22/201112/23/201112/23/2011PPART
DetailsTom Arcoraci
ok for temp occ
FIRE-Final Inspection12/23/201112/23/201112/23/2011APASS
DetailsForrest France
Inspection passed. Fire life safety finaled.
FIRE-Final Inspection12/22/201112/22/201112/23/2011PPART
DetailsForrest France
Temporary Occupancy12/23/20113/22/201212/23/2011 DONE
DetailsTisha Gallop
BLD-Conference12/22/201112/22/201112/22/2011PPASS
DetailsTom Arcoraci
BLD-Conference12/21/201112/21/201112/22/2011PPART
DetailsTom Arcoraci
FIRE-Final Inspection12/20/201112/21/201112/22/2011PPART
DetailsForrest France
Verified additional emergency lighting at the parking garage levels for buildings 2 and 3.
BLD-Conference12/19/201112/21/201112/21/2011APART
DetailsTom Arcoraci
FIRE-Final Inspection12/19/201112/21/201112/20/2011ACANC
DetailsForrest France
Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
FIRE-Final Inspection12/19/201112/20/201112/20/2011PPART
DetailsForrest France
Exit discharge lighting retested okay, completed testing at buildings 2 and 3 unit smoke alarms for location and interconnection- noted areas where SA need relocated per NFPA 72, 4th floor fire sprinkler work verified.
FIRE-Final Inspection12/17/201112/19/201112/19/2011APART
DetailsForrest France
Completed walkthrough of EM lighting and exit signage for functionality on emergency power. Noted exit discharge lighting at some locations is not operable. Discussed items on fire code review notes, schedule for final approvals.
BLD-Conference12/16/201112/19/201112/19/2011APASS
DetailsTom Arcoraci
BLD-Conference12/16/201112/16/201112/16/2011PPASS
DetailsTom Arcoraci
BLD-Conference12/15/201112/16/201112/16/2011APASS
DetailsTom Arcoraci
BLD-Conference12/15/201112/15/201112/15/2011APASS
DetailsTom Arcoraci
BLD-Other10/26/201110/27/201110/27/2011PPASS
DetailsTom Arcoraci
BLD-Wall cover10/18/201110/26/201110/26/2011APASS
DetailsTom Arcoraci
BLD-Wall cover10/4/201110/18/201110/18/2011APASS
DetailsTom Arcoraci
BLD-Wall cover9/26/201110/4/201110/4/2011APASS
DetailsTom Arcoraci
FIRE-Conference10/3/201110/4/201110/4/2011ADONE
DetailsForrest France
Leonard would like to discuss fire lanes and signage. Please call when you are available. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
BLD-Other9/27/20119/27/20119/27/2011PPASS
DetailsTom Arcoraci
BLD-Wall cover9/26/20119/26/20119/26/2011APASS
DetailsTom Arcoraci
BLD-Other9/23/20119/23/20119/26/2011PPASS
DetailsTom Arcoraci
Grid ceilings are ready to look at. Call me. >> Inspection requested via web by Bob Thornton
CHANGE STATUS TO (ISS)  9/8/2011 DONE
DetailsBarbara Stitt
(F) Reprint permit  9/8/2011 DONE
DetailsBarbara Stitt
Plan assigned to (DRS)8/24/20118/24/20119/2/2011 PASS
DetailsDan Stuart
Routing - PLAN CHECK8/24/2011 9/2/2011 PASS
DetailsDan Stuart
Removed extra 90 minute 'Total Door' assemblies at Level P1 (parking garage), door #45, indicated on original plans. Doors on elevator are rated 90 minute assemblies already. There is a lobby at the elevator that will remain in the parking garage at Parking Garage Elevators.
PLANS/APPL TAKEN TO FRONT DESK  9/2/2011 PASS
Print Occupancy Form  9/2/2011 DONE
Telephone call  9/2/2011 DONE
DetailsChristina Prado
Left message with Megan--advised fees due and permit ready
Override - Parcel Holds  9/2/2011  
Permit Ready to Issue  9/2/2011 DONE
DetailsChristina Prado
Plan Modification Accepted  8/24/2011 DONE
DetailsTisha Gallop
Plan modification accepted for Bld06-02323 (Crescent Rim Bldgs #2 & #3 - Residential units) level P1 to remove door 45 between elevator 2 and elevator lobby and door 45 between elevator 3 and elevator lobby; as note by revision (delta 4) dated 8/23/11, on sheets A205, A211, A704; routed to Dan Stuart (per JCB).
BLD-Conference8/11/20118/19/20118/19/2011APASS
DetailsTom Arcoraci
BLD-Conference8/11/20118/17/20118/17/2011APASS
DetailsTom Arcoraci
BLD-Wall cover8/9/20118/17/20118/17/2011APASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover8/11/20118/15/20118/15/2011APART
DetailsTom Arcoraci
wip ok
BLD-Wall cover8/11/20118/11/20118/11/2011PPASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover8/3/20118/10/20118/9/2011APASS
DetailsTom Arcoraci
wip ok
BLD-Wall cover7/27/20118/3/20118/3/2011APASS
DetailsTom Arcoraci
BLD-Wall cover7/19/20117/27/20117/27/2011APASS
DetailsTom Arcoraci
BLD-Conference7/25/20117/26/20117/26/2011APASS
DetailsTom Arcoraci
BLD-Wall cover7/25/20117/25/20117/25/2011PPASS
DetailsTom Arcoraci
BLD-Wall cover7/12/20117/19/20117/19/2011APASS
DetailsTom Arcoraci
BLD-Wall cover7/12/20117/12/20117/12/2011PPASS
DetailsTom Arcoraci
BLD-Wall cover7/8/20117/12/20117/12/2011APASS
DetailsTom Arcoraci
BLD-Energy code compliance7/6/20117/8/20117/8/2011APASS
DetailsTom Arcoraci
BLD-Wall cover7/6/20117/6/20117/6/2011PPASS
DetailsTom Arcoraci
BLD-Other6/27/20117/6/20117/6/2011APASS
DetailsTom Arcoraci
BLD-Wall cover7/1/20117/1/20117/5/2011PPASS
DetailsTom Arcoraci
BLD-Other6/23/20116/27/20116/27/2011APASS
DetailsTom Arcoraci
wip ok
BLD-Other6/21/20116/23/20116/23/2011APASS
DetailsTom Arcoraci
BLD-Other6/17/20116/21/20116/21/2011APASS
DetailsTom Arcoraci
CHANGE STATUS TO (ISS)  6/21/2011 DONE
DetailsBarbara Stitt
(F) Reprint permit  6/21/2011 DONE
DetailsBarbara Stitt
BLD-Wall cover6/14/20116/17/20116/17/2011APASS
DetailsTom Arcoraci
wip ok to cover
BLD-Energy code compliance6/13/20116/14/20116/14/2011APASS
DetailsTom Arcoraci
wip ok
Print Occupancy Form  6/14/2011 DONE
Telephone call  6/14/2011 DONE
DetailsChristina Prado
No answer or voicemail for given number, emailed Richard information instead 6-14-11 at 1 P.M.
Permit Ready to Issue  6/14/2011 DONE
DetailsChristina Prado
Plan assigned to (DRS)6/1/20116/1/20116/13/2011 PASS
DetailsDan Stuart
Routing - PLAN CHECK6/1/2011 6/13/2011 PASS
DetailsDan Stuart
Approved based on plan resubmittals for area of refuge in existing stair enclosure with two-way communication system and use instructions at the existing weast stair enclosure serving the pool level area and new plan review clarification number .5 added to original reviews.
PLANS/APPL TAKEN TO FRONT DESK  6/13/2011  
Override - Parcel Holds  6/13/2011  
Print Pending Permit.LaserJet4  6/13/2011  
Case Summary (BLD)  6/13/2011  
BLD-Energy code compliance6/10/20116/10/20116/10/2011PPASS
DetailsTom Arcoraci
BLD-Wall cover6/8/20116/8/20116/8/2011PPASS
DetailsTom Arcoraci
2nd floor wip ok
BLD-Energy code compliance6/8/20116/8/20116/8/2011PPASS
DetailsTom Arcoraci
2nd floor wip ok
BLD-Wall cover6/3/20116/6/20116/6/2011APASS
DetailsTom Arcoraci
bld 2 4 units
BLD-Energy code compliance6/2/20116/3/20116/3/2011APASS
DetailsTom Arcoraci
Per Bob Thornton from CRB LLC this inspection has nothing to do with the plan modification that was turned in on 6-1-11 This inspection is for building 2 level 3
Override - Parcel Holds  6/2/2011  
Plan Modification Accepted  6/1/2011 DONE
DetailsChristina Prado
BLD-Energy code compliance5/23/20115/24/20115/24/2011APASS
DetailsTom Arcoraci
Bldg 2 level 3 unit 2/301 and 2/302. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
BLD-Framing/Rough-in5/20/20115/23/20115/23/2011APASS
DetailsTom Arcoraci
Inspect 2/301 and 2/302. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
BLD-Energy code compliance5/18/20115/18/20115/18/2011PPASS
DetailsTom Arcoraci
Bldg 2 level 4 units 2/401 and 2/402 Phone #: ###-#### >> Inspection requested via web by Bob Thornton
BLD-Wall cover5/16/20115/17/20115/17/2011APASS
DetailsTom Arcoraci
Bldg 2 units 2/401 and 2/402 Phone #: ###-#### >> Inspection requested via web by Bob Thornton
BLD-Energy code compliance5/13/20115/16/20115/16/2011PPASS
DetailsTom Arcoraci
Inspect bldg 2 units 403 404 and 405. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
Case Summary (BLD)  5/13/2011  
FIRE-Conference5/10/20115/12/20115/12/2011PDONE
DetailsForrest France
On site conference with contractor and structural inspector regarding exiting at the pool enclosure.
BLD-Wall cover5/11/20115/12/20115/12/2011PPASS
DetailsTom Arcoraci
Partial framing inspection bldg 2 level 4. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
BLD-Conference5/10/20115/12/20115/12/2011PPASS
DetailsTom Arcoraci
I would like to meet with you and Forest to discuss pool egress. Is it possible to get you both here at the same time? Phone #: ###-#### >> Inspection requested via web by Bob Thornton
BLD-Wall cover5/11/20115/12/20115/12/2011APASS
DetailsTom Arcoraci
Look at bldg 3 corridors 2nd 3rd and 4th floors. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
BLD-Conference5/10/20115/11/20115/10/2011PCANC
DetailsTom Arcoraci
We want to meet with you and the fire inspector at the same time to discuss egress from the pool area. Is that possible? Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
BLD-Framing/Rough-in5/6/20115/6/20115/6/2011PPASS
DetailsTom Arcoraci
Inspect Bldg 3 level 4 unit F Phone #: ###-#### >> Inspection requested via web by Bob Thornton
BLD-Conference5/5/20115/6/20115/6/2011PPASS
DetailsTom Arcoraci
BLD-Conference4/4/20114/4/20114/4/2011APASS
DetailsTom Arcoraci
BLD-Conference3/2/20113/3/20113/3/2011APASS
DetailsTom Arcoraci
Call me or meet there at 9:00 am. Thanks. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
BLD-Aging Inspection2/28/20112/28/20112/28/2011 NR
DetailsTom Arcoraci
BLD-Aging Inspection12/27/201012/27/201012/27/2010 PART
DetailsTom Arcoraci
CHANGE STATUS TO (ISS)  12/9/2010 DONE
DetailsChristina Prado
plan modification issued
(F) Reprint permit  12/9/2010 DONE
DetailsChristina Prado
Routing - FIRE12/7/201012/8/201012/8/2010 PASS
DetailsScott Arellano
Modified scope of original permit to include alternate & date change and attached original plan review comments as part of this alternate.
PLANS/APPL TAKEN TO FRONT DESK  12/8/2010  
Print Occupancy Form  12/8/2010 DONE
Telephone call  12/8/2010 DONE
DetailsTisha Gallop
called and left message for Richard Honsinger that plan mod is ready and fees.
Override - Parcel Holds  12/8/2010  
Override - Parcel Holds  12/8/2010  
Permit Ready to Issue  12/8/2010 DONE
DetailsTisha Gallop
Plan assigned to (DRS)11/29/2010 12/8/2010 PASS
DetailsDan Stuart
Routing - PLAN CHECK11/29/2010 12/7/2010 PASS
DetailsDan Stuart
Routing to fire code analyst for review.
CHANGE STATUS TO (REV)  11/29/2010 DONE
DetailsJason Blais
Plan Modification Accepted  11/24/2010  
Plan modification excepted for BLD06-02323, To remove 2nd exits from level2 and 3e.1 and e.2 units-remodel master closets,remove 2 nd exits from level4 unit f-remodelmasterbedroom suites.remodel level4 unit d2,remove 2nd exits from level 2 and 3c units,remodeld units on levels 1 and 2 . remove 2nd exit requirement from level 1.add square footage on level 2. Add hallway between lobby and trash in building 3.routed to Sam Z fro review. Affected sheets are cov,a012,a013,a206,a206.2,a206.3,a207,a207.2,a207.4,a207.5,a208,a208.1,a208.3,a208.4,a2069,a209.2,a209.3,a209.4,a212,a212.2,a212.3,a213,a213.2,a213.4,a213.5,a214,a214.1,a214.3,a214.4,a215,a215.2,a215.3,a215.4,s2.06w,s2.07,s2.08,s2.09,s2.12w,s2.13,s2.14,s2.15,s5.08,m305,m306,m307,m308,m310,m311,m312,m313,m405,m406,m407,m408,m410,m411,m412,m413.
BLD-Aging Inspection10/25/201010/25/201010/25/2010 PART
DetailsTom Arcoraci
BLD-Aging Inspection8/23/20108/23/20108/23/2010 PART
DetailsTom Arcoraci
BLD-Energy code compliance6/23/20106/23/20106/23/2010PPART
DetailsTom Arcoraci
partial fourth floor
BLD-Aging Inspection5/3/20105/3/20105/3/2010 PART
DetailsTom Arcoraci
Case Summary (BLD)  3/15/2010 DONE
BLD-Aging Inspection3/2/20103/2/20103/2/2010 PART
DetailsTom Arcoraci
BLD-Framing/Rough-in12/31/200912/31/200912/31/2009PPART
DetailsTom Arcoraci
Tom, please call Bob Thornton. Internet Inspection Request from: Bob Thornton ext walls 4 th floor ok to insul
BLD-Conference11/20/200911/20/200911/20/2009PPASS
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok
Telephone call  10/16/2009 DONE
Details
left vm for richard at ###-#### - permit (plan mod) ready and fees given
Override - Parcel Holds  10/16/2009  
Permit Ready to Issue  10/16/2009 DONE
Details
CHANGE STATUS TO (ISS)  10/16/2009 DONE
(F) Reprint permit  10/16/2009  
Plan assigned to (DRS)10/8/200910/8/200910/15/2009 PASS
DetailsDan Stuart
10/15/2009 15:55:31 DRS - activity updated through activity BLDA022 from case BLD06-02323.
Routing - PLAN CHECK10/15/2009 10/15/2009 PASS
DetailsDan Stuart
No resubmittals required.
Routing - PUBLIC WORKS10/13/2009 10/15/2009 PASS
DetailsBeverly Hall
Plan mod 10-8-09 Added roof drains & downspouts to storm water system. Added transformer pad.
Routing PW Drainage10/13/2009 10/15/2009 PASS
DetailsBrian Murphy
PLANS/APPL TAKEN TO FRONT DESK  10/15/2009 PASS
Override - Parcel Holds  10/13/2009  
Plan Modification Accepted  10/8/2009  
DetailsDan Stuart
Plan mod rec'd to add roof drains and downspouts to the store water system and add transformer pad to back drive; three copies of sheet C3.0; C4.0; & C4.1
BLD-Aging Inspection9/25/20099/25/20099/25/2009 PASS
DetailsTom Arcoraci
BLD-Other6/11/20096/11/20096/11/2009PPASS
DetailsTom Arcoraci
Look at the ceiling grid in the 1st floor corridor and lobby of bldg 3. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Aging Inspection4/13/20094/13/20094/13/2009 PASS
DetailsTom Arcoraci
BLD-Conference2/10/20092/10/20092/10/2009PPASS
DetailsTom Arcoraci
BLD-Wall cover1/19/20091/20/20091/20/2009APART
DetailsTom Arcoraci
Bldg 3 lobby soffit framing. Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok
BLD-Wall cover12/31/200812/31/200812/31/2008PPASS
DetailsTom Arcoraci
Inspect the drop ceiling at bldg 3 carport. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Conference12/10/200812/11/200812/11/2008APART
DetailsTom Arcoraci
Inspect the bldg 3 lobby for cover. Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok
BLD-Framing/Rough-in11/4/200811/4/200811/4/2008PPART
DetailsTom Arcoraci
Discuss SCR cable Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok
BLD-Conference11/4/200811/4/200811/4/2008PDONE
DetailsJim Sly
Tom, Bring Jim Sly to discuss SCR cable. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Wall cover10/29/200810/29/200810/29/2008PPASS
DetailsJim Sly
Inspect the 2nd floor of bldg 3. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Conference10/23/200810/23/200810/23/2008PCANC
DetailsJim Sly
I will have some information on the flame spread and smoke development for the SCR cable. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
Canc by Contr...
BLD-Conference10/21/200810/22/200810/22/2008ADONE
DetailsJim Sly
I''ll be out to a meeting from 10:00 to 1:00.
Call me before or after. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
Met with Bob ... Gave him copy of Chapter 8 2003 IBC
BLD-Energy code compliance10/6/200810/7/200810/7/2008APASS
DetailsJim Sly
Inspect the 3rd floor of bldg 3 Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Energy code compliance10/3/200810/6/200810/6/2008APART
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Bob Thornton
3rd and 4th floors
BLD-Framing/Rough-in10/1/200810/2/200810/2/2008APART
DetailsJim Sly
Inspect 4th floor, 3rd floor and misc mechanical rooms. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
OK to cover....Lounge Ceiling, all Mech Rooms (1 side), 3rd and 4th floors.
BLD-Energy code compliance9/24/20089/25/20089/25/2008APART
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Bob Thornton
4 units in Bldg #3.............
NOTE: All previous inspections were called in by contractor (by mistake) on Permit # BLD 06-02320 which was for Underground parking shell.
BLD-Aging Inspection7/16/20087/16/20087/16/2008 PASS
DetailsTom Arcoraci
Plan resubmittals received  7/7/2008  
DetailsGeorge Slane
Received a cover transmittal, letter to George Slane dated 7-2-08 from Richard Honsinger, copy of 2007 supplement to the IBC (2 pages), 3 copies of sheets A013, A012 and taken to George Slane's desk///7-7-08 @ 10:25am BAS
Case Summary (BLD)  5/15/2008  
BLD-Aging Inspection5/13/20085/13/20085/12/2008 NR
DetailsTom Arcoraci
wip
Plan resubmittals received  1/23/2008  
Received 1 cover transmittal, 1 letter from Rishard Honsinger dated 1-22-08, 1 copy of sheet SK1/A900 and taken to Marlene Southard's desk///1-23-08 @ 2:30pm BAS
Issue PAID IN FULL permit  12/27/2007 DONE
Permit Ready to Issue  12/11/2007  
Telephone call  12/11/2007 DONE
Left message with Anna for Dave Holm that permit is ready-emailed break down of fees///12/11/07 @ 9:15am BAS
PLANS/APPL TAKEN TO FRONT DESK  12/10/2007 DONE
Plans reviewed and approved by Mike Phillips. Plans taken to permit desk to issue by MSouthard
Telephone call  12/10/2007 DONE
Left phone message and wrote an E-mail to Nan at ACHD regarding how to charge for the 2 guest suites without kitchens///12/10/07 @ 1:15pm BAS
Plan assigned to (M_P)8/14/2006 12/10/2007 PASS
12/10/2007 11:36:21 MYS - activity updated through activity BLDA022 from case BLD06-02323.
Routing - PLAN CHECK11/7/2007 11/27/2007 PASS
Plans have been approved by all reviewing agencies and approved per notes placed on plans and all attched plan review comments / conditions.
Routing - PLANNING11/27/2007 11/27/2007 PASS
Approved per DRH07-00548 and per the Conditional Use Permit as reviewed by Schafer and Riddle.
Routing - PLAN CHECK10/22/2007 11/7/2007 ----
Routing to Fire
Telephone call  11/7/2007 DONE
Spoke with Richard honsinger. richard verifys that building 31 will have a remote PIV for the fire sprinkler system. Buildings 2 & 3 will have a WPIV for the fire sprinkler main control valve.
Routing - FIRE11/7/2007 11/7/2007 PASS
Spoke with Richard honsinger. richard verifys that building 1 will have a remote PIV for the fire sprinkler system. Buildings 2 & 3 will have a WPIV for the fire sprinkler main control valve.
Routing - FIRE10/18/2007 10/22/2007 FAIL
Faxed revised IFC review comments to architect. Attached IFC review comments to plans.
Routing Off Site - STRUCTURAL10/18/2007 10/18/2007 DONE
10/18/07 - Routed to outside structural review copies of resubmittal structural plan sheets for reference. (msouthard)
Routing - PLAN CHECK9/7/2007 10/18/2007 PEND
Routing on to Fire while Dan S. is preparing plan review follow up report and waiting for structural review comments.
Routing Off Site - STRUCTURAL10/16/2007 10/18/2007 PASS
10/16/07 - Sent pdf of resubmitted documents & calcs to outside engineer for review. Documents dated 9/7/07 and we received them on 10/11/07. (msouthard)
10/18/07 - Approved w/requirements for deferred submittals after the permit is issued. Structural engineer of record is to provide additional information on regarding holdowns and connections after the permit is issued. See structural plan review comments incorporated into the "building plan check" document attached to plans. (review comments from outside engineer also scanned into document section of this permit).
Routing - PLUMBING10/17/2007 10/17/2007 PASS
secondary drainage will be required for roof and deck areas with wall enclosures,
Plan resubmittals received  10/15/2007  
Received 1 cover transmittal, 1 responce letter from Tikker Engineering with supplemental calcs, 1 responce letter from Kieffer Design Group, 1 responce letter from Driscoll Architecs and the following sheets-A201, A202, A203, A204, 205, A206, A207, A208, A209, A210, A211, A212, A213, A214, A215, A216, A217, A218, A219, A220, A221, A230, A237, A238, A239, A240, A241, A242, A244, A253, A305, A704, A800, A801, A802, A803, A810, A811, ID.19, M500,M501, M514, M515, E1.1 are at Barb's desk for insertion///10/15/07 @ 4:45pm
A structural supplemental calcs book and the following sheets-S1.00, S1.01, S2.00, S2.01F, S2.01R, S2.01W, S2.02, S2.03, S2.04, S2.04A, S2.04B, S2.05, S2.06F, S2.06R, S2.06W, S2.07, S2.08, S2.09, S2.10, S2.10A, S2.11, S2.12F, S2.12R, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.16A, S2.17, S2.18F, S2.18R, S2.18W, S2.19, S2.20, S2.21, S2.21A, S2.21B, S3.00, S3.01, S3.02, S3.03, S4.00, S4.01, S4.02, S5.00, S5.01, S5.02, S5.03, S5.04, S5.05, S5.06, S6.00 for Marlene at Barb's desk 10/15/07 @ 4:45pm
Plan resubmittals received  10/12/2007  
Matt Siegenthaler inserted the following pages in to plans--Cov, A001, A002, A003, A012, A013, A200, A201, A202, A203, A204, A205, A206, A207, A208, A209, A210, A211, A212, A216, A217, A218, A219, A220, A221, A230, A231, A232, A233, A234, A235, A236, A243, A244, A245, A246, A247, A248, A249, A250, A251, A252, A253, A254, A260, A261, A262, A270, A271, A272, A300, A301, A302, A303, A304, A310, A325, A360, A361, A362, A363, A364, A365, A500, A700, A701, A702, A703, A704, A705, A706, A707, A710, A800, A801, A802, A803, A804, A810, A811, A813, A822, A900, A902, WP-000, WP-001, WP-002, WP-003, WP-004, WP-005, WP-006, WP-007, ID.01, ID.01A, ID.02, ID.02A, ID.13, ID.14, ID.15, ID.19A, S1.00, S1.01, S2.01W, S2.02, S2.03, S2.04, S2.04A, S2.04B, S2.06W, S2.07, S2.08, S2.09, S2.10, S2.10A, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.16A, S2.18W, S2.19, S2.20, S2.21, S2.21A, S2.21B, S5.00, S5.01, S5.03, S5.04, S5.05, S5.06, S6.00, M100, M101, M102, M103, M104, M200, M201, M202, M203, M204, M300, M301, M302, M303, M314, M315, M316, M317, M400, M401, M402, M403, M405, M410, M414, M415, M416, M417, M500, M501, M502, M503, M504, M505, M508, M509, M510, M513, M514, M515, M516, M517, FP100, FP101, FP102, FP103, FP104, FP105, FP106, FP107, FP108, FP109, FP110, E0.0, E1.0, E1.2, E1.3, E1.4, E1.5, E1.6, E1.7, E1.8, E1.9, E2.0, E2.1.0L, E2.1.0P, E2.1.1L, E2.1.1P, E2.1.3L, E2.1.3P, E2.1.4, E2.10, E2.14, E2.16, E2.17, E2.18, E2.19, E2.2.1L, E2.2.1P, E2.21, E2.3.1L, E2.3.1P, E2.4.0L, E2.4.0P, E2.4.1L, E2.4.1P, E2.4.2L, E2.4.2P, E2.4.3L, E2.4.3P, E2.4.4, E2.5, E2.6, E2.8, E2.9, E3.0, C1.0, C2.0, C3.0, C3.1, C3.2, C3.3, C3.4, C3.5, C3.6, C3.7, C3.8, C4.0, C4.1, C4.2, C4.3, C4.4, C4.5, C5.0, C6.0, C7.0, C8.0, Letters from Driscoll Architects for responce comments, info from Creighton Engineers regarding Fire Suppression, Info from Kieffer Design Group regarding interior, info from Tikker for MEC & PLM, Info from Musgrove regarding ELE, info from Yu & Trochalakis regarding structural, Responce & supplemental calcs
Routing - PLAN CHECK8/30/2007 9/7/2007 FAIL
Second ref=view failed. Sent correction report to the architect, additional informarmation is requried to be submitted for further review prior to issuing permit.
Routing Off Site - STRUCTURAL8/9/2007 9/7/2007 FAIL
Called Action Courier for pick up 8/9/07 @ 9:45 BAS
Second review failed. Sent correction report to the architect. Additional information is required to be submitted and review by the outside engineering firm prior to permit issuance.
Plan resubmittals received  8/31/2007  
Received FP100, FP101, FP102, FP103, FP104, FP105, FP106, FP107, FP108, FP109, FP110; taken to Mike Phillips
Routing - FIRE8/27/2007 8/30/2007 FAIL
Emailed and faxed resubmittal items to architect.
Routing - PLAN CHECK3/12/2007 8/27/2007 ----
Routing to fire.
Plan resubmittals received  8/10/2007  
received 1 transmittal and 2 copys of sheets A201,A243 taken to Mike P
Plan resubmittals received  8/8/2007  
Received transmittal and one copy of pages A205, A206, A207, A208, A209, A210, A211, A212, A213, A214, A215, A216; taken to Mike Phillips
Plan resubmittals received  8/6/2007  
received 1 transmittal, 2 response,1 calc book and 2 copys of sheets a002,a003,a200,a201,a203,a204,a205,a206,a207,a208,a209,a210,a211,a212,a213,a214,a215,a216,a217,a218,a219,a220,a221,a232,a233,a234,a235,a236,a237,a238,a239,a240,a241a242,a243,a244a,a245,a246,a247,a248,a249,a250,a251a252,a217,id.19a,c1.0,c2.0,c3.0,c3.1,c3.2,c3.3,c3.4,c3.5,c3.6,c3.7,c.08,c4.0,c4.1,c4.2,c4.3,c4.4,c5.0,c6.0,c7.0,c8.0,s1.00,s1.01,s2.s2.06w,s2.07,s2.08,s2.09,s2.10,s2.10a,s2.12w,s2.13,s2.14,s2.15,s2.16a,s5.00,s5.01,s5.02,s5.03,s5.04,s5.05,s6.00,m1.00,m101,m102,m103,m104,m200,m202,m304,m305,m306,m307,m308,m309,m310,m311,m312,m313,m404,m405,m406,m407,m408,m409,m410,m411,m412,m413,m504,m505,m506,m507m508,m509,m510,m511,m512,m513,e0.0,e1.1,e1.2,e1.3,e1.4,e1.6,e1.7,e1.8,e1.9,e2.0,e2.11,e2.12,e2.13,e2.15,e2.18,e2.19,e2.20,e2.20l,e2.20p,e2.21l,e2.22,e2.2.2l,e2.2.2p,e2.23,e2.2.3L,e2.2.3p,e2.24,e2.2.4L,e2.2.4p,e2.2.5,e2.3.0L,e2.3.0p,e2.3.1L,E2.3.1p,e2.3.2L,e2.3.2p,e2.3.3L,e2.3.3p,e2.3.4;,e2.3.4p,e2.3.5,e2.7,e3.0 taken to Mike P.
Routing Off Site - STRUCTURAL3/19/2007 3/26/2007 FAIL
Called Action Couriers for pick up 9:52 3-19-07
Plan resubmittals received  3/15/2007  
received transmittal letter from erstad arch & "3" sets of plans including S1.OO, S1.O1, S2.06W, S2.07, S2.08, S2.09, S2.10, S2.12W, S2.13, S2.14, S2.15, S2.16, S5.00, S5.01, S5.02, S5.03, S5.04, S6.00, -plans taken to mike phillips
Plan resubmittals received  3/15/2007  
received transmittal letter from erstad arch & "1" set of plans including S1.00, S1.O1, S2.O5, S2.O6-F, S2.06-R, S2.O6W, S2.O7, S2.08, S2.09, S2.10, S2.11, S2.12-F, S2.12-R, S2.12W, S2.13, S2.14, S2.15, S2.16, S3.00, S3.01, S3.02, S3.03, S3.04, S4.00, S4.01, S4.02, S5.00, S5.01, S5.02, S5.03, S5.04, S6.00--plans taken to mike phillips
Routing - FIRE3/6/2007 3/12/2007 FAIL
Routing - PLAN CHECK1/29/2007 3/6/2007 FAIL
Plan review completed, sent correction report to the architect requesting additional informaiotn to be submitted for further review prior to issuing the building permit.
Routing - PLUMBING1/29/2007 1/29/2007 FAIL
no corrections made
Routing - PLAN CHECK9/25/2006 1/29/2007 ----
Plans routed back to Plumbing for review. Building code items not reviewed at this time.
Plan resubmittals received  12/8/2006  
Received 4 copies of pages M100, M200, M201, M202, M203; taken to Mike Phillips
Routing - PLANNING Land Div12/8/2006 12/8/2006 PASS
Routing - FIRE9/21/2006 9/25/2006 FAIL
Faxed resubmittal items to architect. Reviewed for water supply and access only.
1st review completed  9/25/2006 FAIL
DetailsMike Phillips
Routing - PLAN CHECK9/6/2006 9/21/2006  
PLANS ROUTED TO FIRE FOR ACCESS & WATER REQUIREMENTS ONLY. Review for all building code requirements not completed at this time.
Routing - PLANNING9/5/2006 9/6/2006 FAIL
Failed both DR and CU. Letter to be issued. DRH05-00397 and CUP05-00015.
Routing - PLUMBING8/30/2006 9/5/2006 FAIL
plans anr incomplete, please address the above listed items.
Routing - Erosion and Sediment8/29/2006 8/30/2006 PASS
Routing - PUBLIC WORKS8/22/2006 8/29/2006 PASS
Routing Off Site - STRUCTURAL8/15/2006 8/28/2006 FAIL
8/15/06 - Called Action Courrier for pick up 8/15/06 @ 12:30pm BAS. Original submittal includes structural for concrete package only.
8/28 - Concrete package review received. Review failed.
Routing - Addressing8/24/2006 8/24/2006 PASS
Routing - PLANNING Land Div8/14/2006 8/22/2006 FAIL
parcels not combined
Plan routing begun/NEW & ADDTN  8/14/2006  
Application received  8/14/2006  
Plans ACCEPTED BY PLAN TECH  8/14/2006  
First Notice 2/2/2017   
First Notice 2/2/2017   
First Notice 1/22/2017