Permit Information
Permit NumberBLD06-02324
StatusFinaled
Name CRESCENT RIM OWNERS ASSOC INC
Site Address 2967 W CRESCENT RIM DR
Project NameCRESCENT RIM #4-CONDOS
Customer Number 
ePlanReviewYes
Description
(CRESCENT RIM RESIDENTIAL CONDOMINIUM BUILDING #4 – THREE STORIES ABOVE EXISTING GARAGE – DRH05-00397 AND CUP04-00107) (9-28-17 PLAN MODIFICATION TO ALLOW THE UNITS UNDER CONTRACT FOR PURCHASE [i.e. 103, 203, and 302] TO BE BOUND BY AN EXECUTED DEED ENCUMBRANCE THAT REQUIRES THE UNIT TO BE RESTORED TO COMPLIANCE WHEN SOLD, IF REQUESTED BY THE PURCHASER. WHERE OPTION “B” IS USED FOR THE BATHROOMS, AT LEAST ONE BATHROOM IS REGULATED FOR ACCESSIBILITY. IN THAT REGULATED BATHROOM, COUNTERS ARE REQUIRED TO BE LOWERED TO 34 INCHES MAXIMUM PER THE ENCUMBRANCE.) (4-6-16 PLAN MODIFICATION.) (3-9-16 PLAN MODIFICATION.) (3-10-16 BEFORE ROUGH INSPECTIONS FOR THE 3 STORY APARTMENT BUILDING ARE APPROVED, A LETTER IS REQUIRED TO BE SUBMITTED FROM THE ENGINEER OF RECORD VALIDATING THAT THE PODIUM HAS NOT EXPERIENCED SIGNIFICANT DEGRADATION OR DAMAGE SINCE IT WAS CONSTRUCTED. IF REPAIRS ARE REQUIRED, COMPLETE DESIGNS AND DRAWINGS ARE REQUIRED TO BE SUBMITTED TO SHOW HOW THE REPAIRS WILL BE DONE. REPAIRS SHALL NOT BE COMMENCED UNTIL THE DRAWINGS FOR THE PROPOSED REPAIRS ARE REVIEWED AND APPROVED. THE 3 STORY APARTMENT BUILDING IS NOT ALLOWED TO BE OCCUPIED UNTIL ALL REPAIRS ARE COMPLETED AND APPROVED. CJW) The NFPA 13-R fire sprinkler system is used for occupancy. This project description replaces all previous descriptions. The work is required to comply with all applicable codes and ordinances in effect on August 14, 2006, the date of permit application. To construct a 3 story, 53,543 square foot residential apartment building (19,822 square feet 1st story, 19,822 square feet 2nd story, and 13,899 square feet 3rd story) on top of an existing 18,661 square foot basement parking garage. The basement was constructed under permit BLD06-02321 (S-2 Occupancy with an occupant load of 93). There will be 19 dwelling units and 1 hotel suite within this building. There will be 2 Type A dwelling units, 17 Type B dwelling units, and 1 accessible hotel suite. The work is to include concrete footings, concrete piers, concrete stem walls, concrete slabs on grade, exterior wood stud bearing walls, interior wood stud bearing walls, wood beams, wood columns, steel beams, steel columns, wood shear walls, wood joist floor systems, wood truss roof systems, wood trellises, synthetic slate roof shingles, mechanically fastened single ply roofing at flat roof areas, roof drains and overflow drains or scuppers at flat roofs, exterior portland cement stucco, exterior manufactured stone veneer, interior 1-hr corridors, interior 2-hr stairway enclosures, a 2-hr elevator shaft, a 1-hr trash chute shaft enclosure with 1-hr trash room, interior doors, exterior doors, exterior windows, gas fireplaces, millwork, and finishes. Special Inspection is required for welding, bolding of steel to steel, wind resistance, seismic resistance, and post installed concrete anchors. Before any holes are drilled through or into the post tensioned concrete deck, the deck is required to be X-rayed, or otherwise scanned (e.g. ground penetrating radar), to precisely determine the location of concrete reinforcement. No concrete reinforcement is allowed to be cut, including post tensioned cables. This requirement applies to holes for anchor bolts, plumbing pipes, electrical conduit, etc. The design for engineered wood trusses is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, with the Structural Engineer’s design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. An NFPA 13 fire sprinkler system is required for the parking garage. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection3/16/20183/16/20183/16/2018PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final3/16/20183/16/20183/16/2018PPASS
DetailsJim Sly
final for shell/core entire building // Bob ###-####
Permanent Occupancy  3/16/2018 DONE
Temporary Occupancy3/14/20186/12/20183/14/2018 DONE
DetailsCandy A. Nichols
Jason B ok'd a 90 day ext from 4/3/18
BLD-Aging Inspection3/5/20183/5/20183/8/2018 PEND
DetailsDave Hannah
BLD-Final1/2/20181/3/20181/3/2018APART
DetailsJim Sly
Final units 201, 202, 207, 208, 301 and 304 Phone #: ###-#### Inspection requested via web by Bob Thornton
OK FOR TEMP occ. on above units. OK for Perm Occ. when Bldg shell is signed off for Perm. Occ.
Temporary Occupancy1/3/20184/3/20181/3/2018 DONE
DetailsChristina Prado
Added 201, 202, 207, 208, 301 & 304
Temporary Occupancy12/15/20176/15/201812/15/2017 DONE
DetailsChristina Prado
Added units 101, 102 & 107 to conditions
BLD-Final12/12/201712/13/201712/13/2017APART
DetailsJim Sly
Final units 102 and 107 Phone #: ###-#### Inspection requested via web by Bob Thornton
Units 102 and 107 OK for Temp. Occ. OK for Perm Occ. when shell building is finaled off.
FIRE-Final Inspection12/12/201712/12/201712/12/2017PPART
DetailsTroy Cobbley
Life safety in Units 102, 107 and 201 passed

Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Final12/12/201712/12/201712/12/2017APART
DetailsJim Sly
Final unit 101. Phone #: ###-#### Inspection requested via web by Bob Thornton
OK for Temp. OK for Perm Occ. when Shell Bldg is signed off.
Corrected unit number from 201 to 101 // C_P 12/15/17
BLD-Final12/8/201712/8/201712/8/2017PPART
DetailsJim Sly
Final for unit 303 Phone #: ###-#### Inspection requested via web by Bob Thornton
OK for Temp Occ. OK for Perm Occ. when Shell Bldg is finaled.
Temporary Occupancy12/8/20173/8/201812/8/2017 DONE
DetailsTisha Gallop
added unit 303 to temp conditions
FIRE-Final Inspection12/7/201712/7/201712/7/2017APART
DetailsTroy Cobbley
Fire life safety passed in Suites, 101, 202, 207, 208, 301, 303, 304.
BLD-Final11/1/201711/1/201711/1/2017PPART
DetailsJim Sly
Call me when you head this way. Phone #: ###-#### Inspection requested via web by Bob Thornton
A Temp Occ. is being given, with the Fire Dept's approval for the North building, only per agreement. The agreement includes the Shell/Core and Suites, 103, 104, 105, 106, 203, 204, 205, 206 and 302.
FIRE-Final Inspection11/1/201711/1/201711/1/2017APART
DetailsTroy Cobbley
A temporary occupancy is being given with the fire dept's approval for the north building only as per agreement. This includes the shell/core and Suites 103, 104, 105, 106, 203, 204, 205, 206 and 302
Temporary Occupancy11/1/20171/30/201811/1/2017 DONE
DetailsRita DeYoung
Temporary Occupancy11/1/20171/30/201811/1/2017 DONE
DetailsTisha Gallop
Temp for shell and units 103, 104, 105, 106, 203, 204, 205, 206 and 302.
FIRE-Final Inspection10/30/201710/31/201710/31/2017AFAIL
DetailsTroy Cobbley
Not quite ready for temp. I need the panic hardware installed in the north stairwell. Today we also verified the smoke alarms were functional in Suites 103, 104, 105, 106, 203, 204, 205, 206 and 302
FIRE-Final Inspection10/27/201710/30/201710/30/2017ACANC
DetailsTroy Cobbley
As always, call when you are heading this way. Phone #: ###-#### Inspection requested via web by Bob Thornton
FIRE-Final Inspection10/26/201710/27/201710/27/2017AFAIL
DetailsTroy Cobbley
Not ready for a final yet. Today we verified exit signs and emergency lights (two on first and one on third did not work), fire extinguishers appear ok, address appears ok, door hardware except for the access control (not tested yet) appears ok, need fire doors installed and tested at the elevator as well as fire alarm and fire sprinkler finals.
Zoning Approval10/20/201710/20/201710/20/2017 DONE
DetailsCody Riddle
Landscape and Site improvements complete per DRH14-00234.
Print Occupancy Form  10/18/2017 DONE
Print Occupancy Form  10/18/2017 DONE
CHANGE STATUS TO (ISS)  10/2/2017 DONE
plan mod paid
OVERRIDE  9/28/2017  
Permit Ready to Issue  9/28/2017 DONE
do no re issue
Plan assigned to (CJW)7/6/2017 9/28/2017 PASS
DetailsCarl Westfall
plan mod (3rd done)
Plan resubmittals received  9/28/2017 DONE
DetailsCarl Westfall
Routing - PLAN CHECK9/28/2017 9/28/2017 PASS
DetailsCarl Westfall
Suite numbers resolved with Public Works. 3rd plan mod approved
Plan Reviewer's activity  9/28/2017 DONE
Approved the 3rd plan mod
PLANS/APPL TAKEN TO FRONT DESK  9/28/2017 DONE
Routing - PLAN CHECK9/1/2017 9/5/2017 FAIL
DetailsCarl Westfall
Suite numbers need to match PW suite numbers. No 36 inch high counters in Option B unless there is an encumbrance. Request encumbrance only for those units where it is needed.
Plan resubmittals requested  9/5/2017 DONE
Plan resubmittals received  9/1/2017 DONE
Resubmitted after hours on a Friday. Monday was a holiday. Routed on Tuesday.
Plan resubmittals requested  8/29/2017 DONE
The hatched units on the drawings are 104, 204, 207, 205, 206, and 304. Noted units in the code modification request letter are 103, 203, 204, 206, and 302. Why are these not all the same? Unit 207 doesn’t need to be encumbered because it complies as option A and lav counter heights are not regulated. Units 205 and 206 comply as option A if the shower heads in the master bathrooms are moved. They must be moved anyway to comply as option B. The shower head in 304 needs to be moved to comply as option A or option B.

Units 102, 108, 103, 202, 208, 203, 302, and 303 all need counter heights at 34 inches maximum or some commitment to upgrade them is also required. Units 108, 208, and 303 potentially could comply as option A where counter heights are not regulated.

Please do another review of each dwelling unit and make the appropriate changes.
Routing - PLAN CHECK7/26/2017 8/29/2017 FAIL
DetailsCarl Westfall
Just became aware of this one. Drawings came in on July 26.

The hatched units on the drawings are 104, 204, 207, 205, 206, and 304. Noted units in the code modification request letter are 103, 203, 204, 206, and 302. Why are these not all the same? Unit 207 doesn’t need to be encumbered because it complies as option A and lav counter heights are not regulated. Units 205 and 206 comply as option A if the shower heads in the master bathrooms are moved. They must be moved anyway to comply as option B. The shower head in 304 needs to be moved to comply as option A or option B.

Units 102, 108, 103, 202, 208, 203, 302, and 303 all need counter heights at 34 inches maximum or some commitment to upgrade them is also required. Units 108, 208, and 303 potentially could comply as option A where counter heights are not regulated.

Please do another review of each dwelling unit and make the appropriate changes.
Plan resubmittals received  8/8/2017 DONE
Received Email with drawings attached for upload
Plan Modification Accepted  7/28/2017 DONE
Workflow received
Plan Modification Accepted  7/5/2017  
started workflow - AD
BLD-Conference6/29/20176/30/20176/30/2017ADONE
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Wall cover6/27/20176/28/20176/28/2017APASS
DetailsDave Hannah
Inspect 3rd floor soffits for cover Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Wall cover6/27/20176/27/20176/27/2017PCANC
DetailsDave Hannah
Look at the 3rd floor corridor and lobby soffit framing. Call me when you are headed this way. Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
BLD-Other3/31/20173/31/20173/31/2017APASS
DetailsJim Sly
Look at the fireplace chase in 303 and approve the remaining framing for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Wall cover3/1/20173/2/20173/2/2017APASS
DetailsJim Sly
Inspect soffits and dropped ceilings in units 102, 203, 204 205, 206, 207, 302 and 303. Please call me when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Energy code compliance1/31/20171/31/20171/31/2017PPASS
DetailsJim Sly
Inspect 107, 208, 301 and 304 for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Wall cover1/24/20171/25/20171/25/2017APASS
DetailsJim Sly
Inspect the soffit framing and dropped ceilings in 103 for cover. Inspect the ceiling in the trash room for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Wall cover1/24/20171/25/20171/24/2017ACANC
DetailsDave Hannah
Inspect the soffits and dropped ceilings for cover in 103 Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
BLD-Framing/Rough-in1/23/20171/24/20171/24/2017APASS
DetailsJim Sly
I need the ok to insulate in units 107, 208, 301 and 304. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Framing/Rough-in1/20/20171/23/20171/23/2017PCANC
DetailsDave Hannah
I need the ok to insulate units 107,208, 301 and 304. Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Leonard Butler
BLD-Energy code compliance1/17/20171/17/20171/17/2017APASS
DetailsJim Sly
Units 101, 201 and 207 are insulated and ready for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Other1/12/20171/13/20171/13/2017APASS
DetailsJim Sly
Inspect the soffit and dropped ceiling framing in 104, 105 and 106. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Framing/Rough-in1/11/20171/12/20171/12/2017PPASS
DetailsJim Sly
Inspect units 101, 201 and 207 Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Energy code compliance1/6/20171/9/20171/9/2017APASS
DetailsJim Sly
Inspect units 102, 202 and 303 for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Framing/Rough-in1/4/20171/5/20171/5/2017APASS
DetailsJim Sly
Framing inspection for units 102, 202, and 303. Call and I''ll come down. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Energy code compliance12/9/201612/12/201612/13/2016PPART
DetailsJim Sly
Insulation for unit 302 Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Framing/Rough-in12/7/201612/8/201612/9/2016PPART
DetailsJim Sly
Call me when you head this way. Phone #: ###-#### Inspection requested via web by Bob Thornton
Room 302....OK.
BLD-Energy code compliance11/18/201611/18/201611/18/2016APASS
DetailsJim Sly
Units 103, 104, 105, 106, 203, 204, 205 and 206 Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Wall cover11/10/201611/10/201611/10/2016PPASS
DetailsJim Sly
Inspect units 103, 104,105 106,203, 204, 205 and 206 to ok for insulation. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Conference10/28/201610/28/201610/31/2016PDONE
DetailsJim Sly
Please call me when you are on your way. I''ll be gone a lot this afternoon. Phone #: ###-#### Inspection requested via web by Bob Thornton
Walk Thru with Bob.
BLD-Wall cover9/26/20169/27/20169/27/2016APART
DetailsJim Sly
Bob Phone #: ###-####
Corridor ceilings OK to cover at three floors.....North Wing.
BLD-Aging Inspection8/3/20168/3/20168/5/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection8/4/20168/4/20168/5/2016 PEND
DetailsDave Hannah
BLD-Conference7/26/20167/27/20167/27/2016ADONE
DetailsJim Sly
South half 1st floor shear walls. 2nd floor shear walls. 3rd floor shear walls. roof nailing. Exterior shear wall nailing. Call me when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Conference7/7/20167/7/20167/7/2016PDONE
DetailsJim Sly
Please call me when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Conference5/16/20165/16/20165/17/2016PDONE
DetailsJim Sly
Jim, Please call when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Conference5/11/20165/13/20165/13/2016ACANC
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Bob Thornton
CHANGE STATUS TO (ISS)  4/27/2016 DONE
DetailsChristina Prado
Plan mod fees paid, all requirements met
OVERRIDE  4/6/2016  
Plan assigned to (CJW)3/28/20163/28/20164/6/2016 PASS
DetailsCarl Westfall
Routing - PLAN CHECK4/4/2016 4/6/2016 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  4/6/2016 DONE
Permit Ready to Issue  4/6/2016 DONE
Plan mod fees due- DO NOT RE-ISSUE
Plan Modification Accepted  4/4/2016 DONE
Workflow received by Carl
Plan Modification Accepted  3/31/2016 DONE
DetailsCarl Westfall
Workflow received by Tim
Plan Modification Accepted  3/28/2016 DONE
DetailsChristina Prado
revisions to remove cantaleiver from plans
BLD-Footing3/22/20163/22/20163/22/2016PPASS
DetailsPhil Shearer
Column footings. Pending special inspection
CHANGE STATUS TO (ISS)  3/22/2016 DONE
DetailsChristina Prado
Plan mod fees paid in full, permit can now be reactivated
OVERRIDE  3/10/2016  
Plan assigned to (CJW)3/3/20163/3/20163/10/2016 PASS
DetailsCarl Westfall
Plan mod Crescent Rim
Routing - Addressing3/9/2016 3/10/2016 PASS
DetailsLaura Hunter
PLANS/APPL TAKEN TO FRONT DESK  3/10/2016 DONE
Permit Ready to Issue  3/10/2016 DONE
DetailsChristina Prado
Plan Mod approved - DO NOT RE-ISSUE - All requirements met for plan mod approval

Must pay all fees prior to changing status to ISS
Plan Modification Accepted  3/9/2016 DONE
Hung up because plan mods don't route directly to the Plans Examiner who did the original review.
Routing - PLAN CHECK3/8/2016 3/9/2016 PASS
DetailsCarl Westfall
Plan mod approved
Plan Modification Accepted  3/3/2016 DONE
DetailsCarl Westfall
CHANGE STATUS TO (ISS)  1/25/2016 DONE
DetailsChristina Prado
Plan mod fees paid in full, permit re-opened to ISS status
OVERRIDE  1/13/2016  
Permit Ready to Issue  1/13/2016 DONE
Plan Reviewer's activity  12/16/2015 DONE
Uploaded revised sheets S1.00, S2.19, S2.20, and S2.51. The sound engineer reduced the spacing of some floor joists from 19.2 inches to 16 inches on center and changed the type of joist from 14-TJI-210 to 14-TJI-110. According to one our Structural Consultant Engineers, the floor capacity is exactly the same.
Plan resubmittals received  12/15/2015 DONE
Resubmittals recieved in E-Plan. TLW
Routing - PLAN CHECK12/15/2015 12/15/2015 PASS
DetailsCarl Westfall
Routing completed
Routing - PLANNING Land Div12/15/2015 12/15/2015 PASS
DetailsDave Abo
Amended condo plat recorded.
Plan assigned to (CJW)4/14/2015 12/15/2015 PASS
DetailsCarl Westfall
(1st done) CRESCENT RIM - BUILDING #4 (May 18 - 15 days / May 28 - 24 days) New building
Plan resubmittals requested  8/27/2015 DONE
Routing - PLAN CHECK8/21/2015 8/27/2015 DONE
DetailsCarl Westfall
Routing complete
Routing - PLUMBING8/24/2015 8/25/2015 PASS
DetailsBill VanDegrift
secondary drainage for the deck areas must be sized according to the area of the deck.
Routing - PLANNING Land Div8/24/2015 8/25/2015 FAIL
DetailsDave Abo
Amendments must be filed with the Ada County Surveyor and recorded prior to issuance of building permit. Called Jerry Hastings at Ada County on 8/25. He had not seen drawings yet.
Routing - Erosion and Sediment8/24/2015 8/25/2015 PASS
DetailsEvan Jenkins
(CRESCENT RIM RESIDENTIAL CONDOMINIUM BUILDING #4 – THREE STORIES ABOVE EXISTING GARAGE – DRH05-00397 AND CUP04-00107) This project description replaces all previous descriptions. The work is required to comply with all applicable codes and ordinances in effect on August 14, 2006, the date of permit application. To construct a 3 story, 53,543 square foot residential apartment building (19,822 square feet 1st story, 19,822 square feet 2nd story, and 13,899 square feet 3rd story) on top of an existing 18,661 square foot basement parking garage. The basement was constructed under permit BLD06-02321 . There will be 19 dwelling units and 1 hotel suite within this building. There will be 2 Type A dwelling units, 17 Type B dwelling units, and 1 accessible hotel suite. The work is to include concrete footings, concrete piers, concrete stem walls, concrete slabs on grade, exterior wood stud bearing walls,
Plan resubmittals received  8/21/2015 DONE
Plan resubmittals requested  7/31/2015 DONE
Routing - PLAN CHECK7/29/2015 7/31/2015 DONE
DetailsCarl Westfall
Routing completed
Routing - PLUMBING7/29/2015 7/30/2015 FAIL
DetailsBill VanDegrift
please address secondary drainage for the deck areas
Routing - PLANNING Land Div7/29/2015 7/29/2015 FAIL
DetailsDave Abo
Must file condominium amendment with Ada County Surveyor to match proposed floor plans for Building 4. Amendment must be recorded prior to issuance of building permit.
Routing - Erosion and Sediment7/29/2015 7/29/2015 FAIL
DetailsEvan Jenkins
Jeff,

Per our earlier phone conversation, due to your project being over 1 Acre in size, you will need to develop a Storm Water Pollution Prevention Plan (SWPPP) to meet Federal EPA 2012 Construction General Permit Requirements. The City of Boise will accept this document to meet the City’s BCC 8-17 ESC Requirements.
You will also need to submit an eNOI (Electronic Notice of Intent). This requires a 14 day waiting period for the EPA to review and approve. I would submit your eNOI first, then focus on developing your SWPPP. Once complete, you can upload this document into ePlan for my review and approval.
Plan resubmittals received  7/29/2015 DONE
Plan resubmittals requested  7/24/2015 DONE
Routing - PLUMBING7/16/2015 7/24/2015 FAIL
DetailsBill VanDegrift
please address current change marks. secondary drainage from decks.
Routing Off Site - STRUCTURAL7/16/2015 7/23/2015 PASS
DetailsCarl Westfall
Chris Merrill - all issues resolved
Routing - PLAN CHECK7/13/2015 7/22/2015 PASS
DetailsCarl Westfall
(7-22-15) Resubmittal review except for structural. Waiting to hear the results of the consultant's 2nd review.

(7-23-15) Consultant Structural Engineer approved.
Routing - Erosion and Sediment7/16/2015 7/20/2015 FAIL
DetailsEvan Jenkins
Full ESC Narrative and Site Map Required for Approval. Both documents are missing, and need to meet the updated BCC 8-17 and Federal 2012 Construction General Permit. Evan Jenkins ###-####


(CRESCENT RIM RESIDENTIAL CONDOMINIUM BUILDING #4 – THREE STORIES ABOVE EXISTING GARAGE – DRH05-00397 AND CUP04-00107) The NFPA 13-R fire sprinkler system is used for occupancy. This project description replaces all previous descriptions. The work is required to comply with all applicable codes and ordinances in effect on August 14, 2006, the date of permit application. To construct a 3 story, 53,543 square foot residential apartment building (19,822 square feet 1st story, 19,822 square feet 2nd story, and 13,899 square feet 3rd story) on top of an existing 18,661 square foot basement parking garage. The basement was constructed under permit BLD06-02321
Routing - PLANNING Land Div7/16/2015 7/16/2015 FAIL
DetailsDave Abo
Must file amendment to Spectacular Condominiums to match floor plans as proposed prior to issuance of building permit.
Plan resubmittals received  7/13/2015 DONE
Plan resubmittals requested  5/28/2015 DONE
Routing - PLAN CHECK4/28/2015 5/28/2015 FAIL
DetailsCarl Westfall
Revised drawings required
Routing Off Site - STRUCTURAL4/28/2015 5/14/2015 FAIL
DetailsCarl Westfall
See Structural Consultant's plan review report.
Routing - FIRE4/28/2015 5/11/2015 PASS
DetailsScott Arellano
Attached revised comments to plans.
Routing - PLUMBING4/28/2015 5/6/2015 FAIL
DetailsBill VanDegrift
provide secondary drains for all deck areas.(3rd floor)
Routing - MECHANICAL4/28/2015 5/6/2015 PASS
DetailsTroy James
Routing - Design Review4/28/2015 4/29/2015 PASS
DetailsSarah Schafer
Routing - Addressing4/28/2015 4/29/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS4/28/2015 4/28/2015 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment4/28/2015 4/28/2015 FAIL
DetailsEvan Jenkins
Full ESC Narrative and Site Map required for approval per BCC 8-17. SWPPP would also be accepted to meet the City's ESC Requirements.
Routing - PLANNING Land Div4/28/2015 4/28/2015 FAIL
DetailsDave Abo
Prior to issuance of building permit. Spectacular Condominium plat must be amended to reflect changes to floor plan for Building 4.
Plan resubmittals received  4/24/2015 DONE
All time spent examining the submitted documents from this date shall be tracked so that plan modification fees can be determined.
Plan Modification Accepted  4/21/2015 DONE
Started mod workflow
BLD-Aging Inspection1/21/20151/21/20151/21/2015 PEND
DetailsPhil Shearer
BLD-Aging Inspection10/22/201410/22/201410/22/2014 PART
DetailsPhil Shearer
Work in progress
BLD-Aging Inspection4/24/20144/24/20144/24/2014 PEND
DetailsTom Arcoraci
BLD-Aging Inspection1/23/20141/23/20141/23/2014 PEND
DetailsTom Arcoraci
BLD-Aging Inspection10/24/201310/24/201310/24/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection7/25/20137/25/20137/25/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection4/25/20134/25/20134/25/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection1/24/20131/24/20131/24/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection10/25/201210/25/201210/25/2012 PEND
DetailsTom Arcoraci
BLD-Aging Inspection7/26/20127/26/20127/26/2012 PEND
DetailsTom Arcoraci
BLD-Aging Inspection4/26/20124/26/20124/26/2012 PEND
DetailsTom Arcoraci
BLD-Other1/26/20121/26/20121/26/2012PPEND
DetailsTom Arcoraci
BLD-Other1/25/20121/25/20121/25/2012PPEND
DetailsTom Arcoraci
BLD-Aging Inspection1/25/20121/25/20121/25/2012 PASS
DetailsTom Arcoraci
BLD-Aging Inspection10/26/201110/26/201110/26/2011 PASS
DetailsTom Arcoraci
wip ok
BLD-Aging Inspection7/27/20117/27/20117/27/2011 PASS
DetailsTom Arcoraci
BLD-Aging Inspection4/25/20114/25/20114/25/2011 PART
DetailsTom Arcoraci
BLD-Aging Inspection2/21/20112/21/20112/22/2011 NR
DetailsTom Arcoraci
BLD-Aging Inspection12/20/201012/20/201012/20/2010 PART
DetailsTom Arcoraci
Override - Parcel Holds  12/9/2010  
Override - Parcel Holds  12/9/2010  
Permit Ready to Issue  12/9/2010  
CHANGE STATUS TO (ISS)  12/9/2010 DONE
DetailsChristina Prado
Plan modification issued
(F) Reprint permit  12/9/2010 DONE
DetailsChristina Prado
Plan assigned to (DRS)11/29/2010 12/7/2010 PASS
DetailsDan Stuart
Routing - PLAN CHECK12/6/2010 12/7/2010 PASS
DetailsDan Stuart
Copy of signed Plan Mod Alternate Request letter attached to plans. Plans to permit desk to issue.
Print Occupancy Form  12/7/2010 DONE
Telephone call  12/7/2010 DONE
12-7-10 called Richard Honsinger permit ready and fee given ///dld
Routing - FIRE12/1/2010 12/6/2010 PASS
DetailsScott Arellano
Plan Mod Alternate to modify previously approved alternate of 9/30/08 (copy attached to plans.) Attached updated Fire Plan review comments to Permit Case.
Routing - PLAN CHECK11/30/2010 12/1/2010 PEND
DetailsDan Stuart
Pending final signed and dated copy of approved alternate request. Routing plans to fire code analyst for review.Plan Mod Alternate to modify previously approved alternate of 9/30/08 (copy attached to plans
Routing - Design Review11/29/2010 11/30/2010 PASS
DetailsSarah Schafer
Sarah Schafer
CHANGE STATUS TO (REV)  11/29/2010 DONE
DetailsJason Blais
Plan Modification Accepted  11/23/2010 DONE
Plam modification excepted for BLD06-02324 to add partition and exit door from lower level mechanical space to allow temoprary occupancy of building 4 mechanical.routed to Sam Z for review
BLD-Aging Inspection10/20/201010/20/201010/20/2010 PART
DetailsTom Arcoraci
BLD-Aging Inspection8/16/20108/16/20108/17/2010 PART
DetailsTom Arcoraci
BLD-Aging Inspection6/14/20106/14/20106/14/2010 PASS
DetailsTom Arcoraci
BLD-Aging Inspection4/14/20104/14/20104/14/2010 PASS
DetailsTom Arcoraci
Case Summary (BLD)  3/15/2010 DONE
BLD-Aging Inspection2/11/20102/11/20102/11/2010 PASS
DetailsTom Arcoraci
BLD-Other11/30/200911/30/200911/30/2009PPASS
DetailsTom Arcoraci
BLD-Aging Inspection11/25/200911/25/200911/30/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection9/25/20099/25/20099/25/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection7/21/20097/21/20097/21/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection5/19/20095/19/20095/19/2009 PASS
DetailsTom Arcoraci
no call for insp
BLD-Aging Inspection3/17/20093/17/20093/17/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection1/14/20091/14/20091/14/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection11/14/200811/14/200811/14/2008 PASS
DetailsTom Arcoraci
Additional plans submitted  9/9/2008 DONE
DetailsBarbara Stitt
Received 4 copies of a letter to Dave Hanneman & George Slane dated 9-8-08 (2 pgs) from Andy Erstad, 1 to Jenifer Gilliland, 1 George Slane, 1 to Sam Rogers, 1 to Dan Stuart///9-9-08 BAS
BLD-Aging Inspection6/10/20086/10/20086/10/2008 PASS
DetailsTom Arcoraci
BLD-Aging Inspection3/27/20083/27/20083/27/2008 NR
DetailsTom Arcoraci
Plan resubmittals received  1/23/2008  
Received 1 cover transmittal, 1 letter from Rishard Honsinger dated 1-22-08, 1 copy of sheet SK1/A900 and taken to Marlene Southard's desk///1-23-08 @ 2:30pm BAS
Permit Ready to Issue  12/27/2007 DONE
Print Occupancy Form  12/27/2007 DONE
Issue PAID IN FULL permit  12/27/2007 DONE
Plan assigned to (M_P)8/14/20068/14/200612/26/2007 PASS
12/26/2007 09:52:16 MYS - activity updated through activity BLDA022 from case BLD06-02324.
PLANS/APPL TAKEN TO FRONT DESK  12/26/2007 DONE
Routing Off Site - STRUCTURAL12/11/2007 12/18/2007 PASS
12/11/07 -Routed resubmittals to outside engineer for review.
12/17/2007 - Review completed. All items adequately addressed.
Plan resubmittals received  12/11/2007  
Received transmittal, and five copies of response letter and structural calculations; taken to Marlene S.//per Marlene called Action Couriers to send one copy to outside engineering
Routing Off Site - STRUCTURAL11/27/2007 12/4/2007 FAIL
11/27/2007 - Routing structural resubmittals to outside engineer for review. (msouthard)
12/4/2007 - Received review by outside engineer. Additional submittals are required. Sent comments to architect and construction manager.
Routing - FIRE12/3/2007 12/4/2007 PASS
DetailsScott Arellano
Attached updated plan sheets to plans. Plans approved per revised sheets A200, A201, A202, A203, A217, A218, A219, A220. (received on 11/29/07)
Plan resubmittals received  11/29/2007  
Received letter and three copies of pages A200, A201, A202, A203, A217, A218, A219, A220; taken to Marlene
Telephone call  11/27/2007  
Called Action Couriers for pick up
Routing - PLAN CHECK10/23/2007 11/27/2007 PEND
10/23/2007 - On hold waiting for resubmittals.
11/27/2007 - Resbumittals received and routing to others for rereview.
Routing - PLANNING11/27/2007 11/27/2007 PASS
Approved per DRH07-00548 and per the Conditional Use Permit as reviewed by Schafer and Riddle.
Plan resubmittals received  11/26/2007  
Received transmittal, response letter, one copy of supplemental calcs, and three copies of pages S1.01, S2.01W, S2.02, S2.03, S2.04, S2.04A, S2.04B, S2.18W, S2.19, S2.20, S2.21, S2.21A(6 copies total of S2.21A only), S2.21B, S5.00, S5.04, S5.05, S5.06; taken to Marlene S.
Routing Off Site - STRUCTURAL10/18/2007 11/2/2007 FAIL
10/18/07 - Routed to outside structural review copies of resubmittal structural plan sheets and calculations. (msouthard)
Called Action Courier for pick up 10/18/07 @ 9:49am BAS
11/2/07 - Received structural review comments from outside engineer and sent via e-mail to architect, structural engr., and construction manager. (msouthard)
Routing - FIRE10/18/2007 10/23/2007 FAIL
Attached revised review comments to plans. emailed updated reviews to David Holm and architect.
Routing - PLAN CHECK3/30/2007 10/18/2007 PEND
Routing on to Fire while Dan S. is preparing plan review follow up report and waiting for structural review comments.
Routing - PLUMBING10/17/2007 10/17/2007 PASS
secondary drainage will be required for roof areas with wall enclosures.
Plan resubmittals received  10/15/2007  
Received 1 cover transmittal, 1 responce letter from Tikker Engineering with supplemental calcs, 1 responce letter from Kieffer Design Group, 1 responce letter from Driscoll Architecs and the following sheets-A201, A202, A203, A204, 205, A206, A207, A208, A209, A210, A211, A212, A213, A214, A215, A216, A217, A218, A219, A220, A221, A230, A237, A238, A239, A240, A241, A242, A244, A253, A305, A704, A800, A801, A802, A803, A810, A811, ID.19, M500,M501, M514, M515, E1.1 are at Barb's desk for insertion///10/15/07 @ 4:45pm
A structural supplemental calcs book and the following sheets-S1.00, S1.01, S2.00, S2.01F, S2.01R, S2.01W, S2.02, S2.03, S2.04, S2.04A, S2.04B, S2.05, S2.06F, S2.06R, S2.06W, S2.07, S2.08, S2.09, S2.10, S2.10A, S2.11, S2.12F, S2.12R, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.16A, S2.17, S2.18F, S2.18R, S2.18W, S2.19, S2.20, S2.21, S2.21A, S2.21B, S3.00, S3.01, S3.02, S3.03, S4.00, S4.01, S4.02, S5.00, S5.01, S5.02, S5.03, S5.04, S5.05, S5.06, S6.00 for Marlene at Barb's desk 10/15/07 @ 4:45pm
Plan resubmittals received  10/12/2007  
Matt Siegenthaler inserted the following pages in to plans--Cov, A001, A002, A003, A012, A013, A200, A201, A202, A203, A204, A205, A206, A207, A208, A209, A210, A211, A212, A216, A217, A218, A219, A220, A221, A230, A231, A232, A233, A234, A235, A236, A243, A244, A245, A246, A247, A248, A249, A250, A251, A252, A253, A254, A260, A261, A262, A270, A271, A272, A300, A301, A302, A303, A304, A310, A325, A360, A361, A362, A363, A364, A365, A500, A700, A701, A702, A703, A704, A705, A706, A707, A710, A800, A801, A802, A803, A804, A810, A811, A813, A822, A900, A902, WP-000, WP-001, WP-002, WP-003, WP-004, WP-005, WP-006, WP-007, ID.01, ID.01A, ID.02, ID.02A, ID.13, ID.14, ID.15, ID.19A, S1.00, S1.01, S2.01W, S2.02, S2.03, S2.04, S2.04A, S2.04B, S2.06W, S2.07, S2.08, S2.09, S2.10, S2.10A, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.16A, S2.18W, S2.19, S2.20, S2.21, S2.21A, S2.21B, S5.00, S5.01, S5.03, S5.04, S5.05, S5.06, S6.00, M100, M101, M102, M103, M104, M200, M201, M202, M203, M204, M300, M301, M302, M303, M314, M315, M316, M317, M400, M401, M402, M403, M405, M410, M414, M415, M416, M417, M500, M501, M502, M503, M504, M505, M508, M509, M510, M513, M514, M515, M516, M517, FP100, FP101, FP102, FP103, FP104, FP105, FP106, FP107, FP108, FP109, FP110, E0.0, E1.0, E1.2, E1.3, E1.4, E1.5, E1.6, E1.7, E1.8, E1.9, E2.0, E2.1.0L, E2.1.0P, E2.1.1L, E2.1.1P, E2.1.3L, E2.1.3P, E2.1.4, E2.10, E2.14, E2.16, E2.17, E2.18, E2.19, E2.2.1L, E2.2.1P, E2.21, E2.3.1L, E2.3.1P, E2.4.0L, E2.4.0P, E2.4.1L, E2.4.1P, E2.4.2L, E2.4.2P, E2.4.3L, E2.4.3P, E2.4.4, E2.5, E2.6, E2.8, E2.9, E3.0, C1.0, C2.0, C3.0, C3.1, C3.2, C3.3, C3.4, C3.5, C3.6, C3.7, C3.8, C4.0, C4.1, C4.2, C4.3, C4.4, C4.5, C5.0, C6.0, C7.0, C8.0, Letters from Driscoll Architects for responce comments, info from Creighton Engineers regarding Fire Suppression, Info from Kieffer Design Group regarding interior, info from Tikker for MEC & PLM, Info from Musgrove regarding ELE, info from Yu & Trochalakis regarding structural, Responce & supplemental calcs
Routing - FIRE3/29/2007 3/30/2007 FAIL
Emailed resubmittal items to Matt Driscoll. Added IFC review comments to plan documents.
1st review completed  3/30/2007 FAIL
Routing - PLAN CHECK1/29/2007 3/29/2007 FAIL
Plan review completed, sent correction report to the architect requesting additional informaiton to be submitted for further review prior to issuing permit.
Routing - PLUMBING1/29/2007 1/29/2007 FAIL
no corrections made
Routing - PLAN CHECK9/25/2006 1/27/2007 ----
Plans routed back to Plumbing for review. Building code items not reviewed at this time.
Plan resubmittals received  12/8/2006  
Received 4 copies of pages M100, M200, M201, M202, M203; taken to Mike Phillips
Routing - PLANNING Land Div12/8/2006 12/8/2006 PASS
Routing - FIRE9/21/2006 9/25/2006 FAIL
Faxed resubmittal items to architect. Reviewed for water supply and access only.
Routing - PLAN CHECK9/6/2006 9/21/2006  
PLANS ROUTED TO FIRE FOR ACCESS & WATER REQUIREMENTS ONLY. Review for all building code requirements not completed at this time.
Routing - PLANNING9/5/2006 9/6/2006 FAIL
Failed both DR and CU. Letter to be issued. DRH05-00397 and CUP05-00015.
Routing - PLUMBING8/30/2006 9/5/2006 FAIL
plans ane incomplete, please address the above listed items.
Routing - Erosion and Sediment8/29/2006 8/30/2006 PASS
Routing - PUBLIC WORKS8/22/2006 8/29/2006 PASS
Routing Off Site - STRUCTURAL8/15/2006 8/28/2006 FAIL
8/15/06 - Called Action Courrier for pick up 8/15/06 @ 12:30pm BAS. Original submittal includes structural for concrete package only.
8/28 - Concrete package review received. Review failed.
Routing - Addressing8/24/2006 8/24/2006 PASS
Routing - PLANNING Land Div8/14/2006 8/22/2006 FAIL
parcels not combined
Plan routing begun/NEW & ADDTN  8/14/2006  
Application received  8/14/2006  
Plans ACCEPTED BY PLAN TECH  8/14/2006  
First Notice 3/26/2018