FIRE-Final Inspection | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Jim Sly
|
|
|
final for shell/core entire building // Bob ###-####
|
Permanent Occupancy | | | 3/16/2018 | | DONE |
|
|
|
|
Temporary Occupancy | 3/14/2018 | 6/12/2018 | 3/14/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason B ok'd a 90 day ext from 4/3/18
|
BLD-Aging Inspection | 3/5/2018 | 3/5/2018 | 3/8/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 1/2/2018 | 1/3/2018 | 1/3/2018 | A | PART |
Jim Sly
|
|
|
Final units 201, 202, 207, 208, 301 and 304 Phone #: ###-#### Inspection requested via web by Bob Thornton OK FOR TEMP occ. on above units. OK for Perm Occ. when Bldg shell is signed off for Perm. Occ.
|
Temporary Occupancy | 1/3/2018 | 4/3/2018 | 1/3/2018 | | DONE |
Christina Prado
|
|
|
Added 201, 202, 207, 208, 301 & 304
|
Temporary Occupancy | 12/15/2017 | 6/15/2018 | 12/15/2017 | | DONE |
Christina Prado
|
|
|
Added units 101, 102 & 107 to conditions
|
BLD-Final | 12/12/2017 | 12/13/2017 | 12/13/2017 | A | PART |
Jim Sly
|
|
|
Final units 102 and 107 Phone #: ###-#### Inspection requested via web by Bob Thornton Units 102 and 107 OK for Temp. Occ. OK for Perm Occ. when shell building is finaled off.
|
FIRE-Final Inspection | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | PART |
Troy Cobbley
|
|
|
Life safety in Units 102, 107 and 201 passed
Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Final | 12/12/2017 | 12/12/2017 | 12/12/2017 | A | PART |
Jim Sly
|
|
|
Final unit 101. Phone #: ###-#### Inspection requested via web by Bob Thornton OK for Temp. OK for Perm Occ. when Shell Bldg is signed off.
Corrected unit number from 201 to 101 // C_P 12/15/17
|
BLD-Final | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | PART |
Jim Sly
|
|
|
Final for unit 303 Phone #: ###-#### Inspection requested via web by Bob Thornton OK for Temp Occ. OK for Perm Occ. when Shell Bldg is finaled.
|
Temporary Occupancy | 12/8/2017 | 3/8/2018 | 12/8/2017 | | DONE |
Tisha Gallop
|
|
|
added unit 303 to temp conditions
|
FIRE-Final Inspection | 12/7/2017 | 12/7/2017 | 12/7/2017 | A | PART |
Troy Cobbley
|
|
|
Fire life safety passed in Suites, 101, 202, 207, 208, 301, 303, 304.
|
BLD-Final | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | PART |
Jim Sly
|
|
|
Call me when you head this way. Phone #: ###-#### Inspection requested via web by Bob Thornton A Temp Occ. is being given, with the Fire Dept's approval for the North building, only per agreement. The agreement includes the Shell/Core and Suites, 103, 104, 105, 106, 203, 204, 205, 206 and 302.
|
FIRE-Final Inspection | 11/1/2017 | 11/1/2017 | 11/1/2017 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given with the fire dept's approval for the north building only as per agreement. This includes the shell/core and Suites 103, 104, 105, 106, 203, 204, 205, 206 and 302
|
Temporary Occupancy | 11/1/2017 | 1/30/2018 | 11/1/2017 | | DONE |
Rita DeYoung
|
|
|
|
Temporary Occupancy | 11/1/2017 | 1/30/2018 | 11/1/2017 | | DONE |
Tisha Gallop
|
|
|
Temp for shell and units 103, 104, 105, 106, 203, 204, 205, 206 and 302.
|
FIRE-Final Inspection | 10/30/2017 | 10/31/2017 | 10/31/2017 | A | FAIL |
Troy Cobbley
|
|
|
Not quite ready for temp. I need the panic hardware installed in the north stairwell. Today we also verified the smoke alarms were functional in Suites 103, 104, 105, 106, 203, 204, 205, 206 and 302
|
FIRE-Final Inspection | 10/27/2017 | 10/30/2017 | 10/30/2017 | A | CANC |
Troy Cobbley
|
|
|
As always, call when you are heading this way. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
FIRE-Final Inspection | 10/26/2017 | 10/27/2017 | 10/27/2017 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for a final yet. Today we verified exit signs and emergency lights (two on first and one on third did not work), fire extinguishers appear ok, address appears ok, door hardware except for the access control (not tested yet) appears ok, need fire doors installed and tested at the elevator as well as fire alarm and fire sprinkler finals.
|
Zoning Approval | 10/20/2017 | 10/20/2017 | 10/20/2017 | | DONE |
Cody Riddle
|
|
|
Landscape and Site improvements complete per DRH14-00234.
|
Print Occupancy Form | | | 10/18/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/18/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/2/2017 | | DONE |
|
|
|
plan mod paid
|
OVERRIDE | | | 9/28/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 9/28/2017 | | DONE |
|
|
|
do no re issue
|
Plan assigned to (CJW) | 7/6/2017 | | 9/28/2017 | | PASS |
Carl Westfall
|
|
|
plan mod (3rd done)
|
Plan resubmittals received | | | 9/28/2017 | | DONE |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 9/28/2017 | | 9/28/2017 | | PASS |
Carl Westfall
|
|
|
Suite numbers resolved with Public Works. 3rd plan mod approved
|
Plan Reviewer's activity | | | 9/28/2017 | | DONE |
|
|
|
Approved the 3rd plan mod
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/1/2017 | | 9/5/2017 | | FAIL |
Carl Westfall
|
|
|
Suite numbers need to match PW suite numbers. No 36 inch high counters in Option B unless there is an encumbrance. Request encumbrance only for those units where it is needed.
|
Plan resubmittals requested | | | 9/5/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/1/2017 | | DONE |
|
|
|
Resubmitted after hours on a Friday. Monday was a holiday. Routed on Tuesday.
|
Plan resubmittals requested | | | 8/29/2017 | | DONE |
|
|
|
The hatched units on the drawings are 104, 204, 207, 205, 206, and 304. Noted units in the code modification request letter are 103, 203, 204, 206, and 302. Why are these not all the same? Unit 207 doesn’t need to be encumbered because it complies as option A and lav counter heights are not regulated. Units 205 and 206 comply as option A if the shower heads in the master bathrooms are moved. They must be moved anyway to comply as option B. The shower head in 304 needs to be moved to comply as option A or option B.
Units 102, 108, 103, 202, 208, 203, 302, and 303 all need counter heights at 34 inches maximum or some commitment to upgrade them is also required. Units 108, 208, and 303 potentially could comply as option A where counter heights are not regulated.
Please do another review of each dwelling unit and make the appropriate changes.
|
Routing - PLAN CHECK | 7/26/2017 | | 8/29/2017 | | FAIL |
Carl Westfall
|
|
|
Just became aware of this one. Drawings came in on July 26.
The hatched units on the drawings are 104, 204, 207, 205, 206, and 304. Noted units in the code modification request letter are 103, 203, 204, 206, and 302. Why are these not all the same? Unit 207 doesn’t need to be encumbered because it complies as option A and lav counter heights are not regulated. Units 205 and 206 comply as option A if the shower heads in the master bathrooms are moved. They must be moved anyway to comply as option B. The shower head in 304 needs to be moved to comply as option A or option B.
Units 102, 108, 103, 202, 208, 203, 302, and 303 all need counter heights at 34 inches maximum or some commitment to upgrade them is also required. Units 108, 208, and 303 potentially could comply as option A where counter heights are not regulated.
Please do another review of each dwelling unit and make the appropriate changes.
|
Plan resubmittals received | | | 8/8/2017 | | DONE |
|
|
|
Received Email with drawings attached for upload
|
Plan Modification Accepted | | | 7/28/2017 | | DONE |
|
|
|
Workflow received
|
Plan Modification Accepted | | | 7/5/2017 | | |
|
|
|
started workflow - AD
|
BLD-Conference | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | DONE |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Wall cover | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PASS |
Dave Hannah
|
|
|
Inspect 3rd floor soffits for cover Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Wall cover | 6/27/2017 | 6/27/2017 | 6/27/2017 | P | CANC |
Dave Hannah
|
|
|
Look at the 3rd floor corridor and lobby soffit framing. Call me when you are headed this way. Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
|
BLD-Other | 3/31/2017 | 3/31/2017 | 3/31/2017 | A | PASS |
Jim Sly
|
|
|
Look at the fireplace chase in 303 and approve the remaining framing for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Wall cover | 3/1/2017 | 3/2/2017 | 3/2/2017 | A | PASS |
Jim Sly
|
|
|
Inspect soffits and dropped ceilings in units 102, 203, 204 205, 206, 207, 302 and 303. Please call me when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Energy code compliance | 1/31/2017 | 1/31/2017 | 1/31/2017 | P | PASS |
Jim Sly
|
|
|
Inspect 107, 208, 301 and 304 for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Wall cover | 1/24/2017 | 1/25/2017 | 1/25/2017 | A | PASS |
Jim Sly
|
|
|
Inspect the soffit framing and dropped ceilings in 103 for cover. Inspect the ceiling in the trash room for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Wall cover | 1/24/2017 | 1/25/2017 | 1/24/2017 | A | CANC |
Dave Hannah
|
|
|
Inspect the soffits and dropped ceilings for cover in 103 Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
|
BLD-Framing/Rough-in | 1/23/2017 | 1/24/2017 | 1/24/2017 | A | PASS |
Jim Sly
|
|
|
I need the ok to insulate in units 107, 208, 301 and 304. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Framing/Rough-in | 1/20/2017 | 1/23/2017 | 1/23/2017 | P | CANC |
Dave Hannah
|
|
|
I need the ok to insulate units 107,208, 301 and 304. Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Leonard Butler
|
BLD-Energy code compliance | 1/17/2017 | 1/17/2017 | 1/17/2017 | A | PASS |
Jim Sly
|
|
|
Units 101, 201 and 207 are insulated and ready for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Other | 1/12/2017 | 1/13/2017 | 1/13/2017 | A | PASS |
Jim Sly
|
|
|
Inspect the soffit and dropped ceiling framing in 104, 105 and 106. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Framing/Rough-in | 1/11/2017 | 1/12/2017 | 1/12/2017 | P | PASS |
Jim Sly
|
|
|
Inspect units 101, 201 and 207 Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Energy code compliance | 1/6/2017 | 1/9/2017 | 1/9/2017 | A | PASS |
Jim Sly
|
|
|
Inspect units 102, 202 and 303 for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Framing/Rough-in | 1/4/2017 | 1/5/2017 | 1/5/2017 | A | PASS |
Jim Sly
|
|
|
Framing inspection for units 102, 202, and 303. Call and I''ll come down. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Energy code compliance | 12/9/2016 | 12/12/2016 | 12/13/2016 | P | PART |
Jim Sly
|
|
|
Insulation for unit 302 Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Framing/Rough-in | 12/7/2016 | 12/8/2016 | 12/9/2016 | P | PART |
Jim Sly
|
|
|
Call me when you head this way. Phone #: ###-#### Inspection requested via web by Bob Thornton Room 302....OK.
|
BLD-Energy code compliance | 11/18/2016 | 11/18/2016 | 11/18/2016 | A | PASS |
Jim Sly
|
|
|
Units 103, 104, 105, 106, 203, 204, 205 and 206 Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Wall cover | 11/10/2016 | 11/10/2016 | 11/10/2016 | P | PASS |
Jim Sly
|
|
|
Inspect units 103, 104,105 106,203, 204, 205 and 206 to ok for insulation. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Conference | 10/28/2016 | 10/28/2016 | 10/31/2016 | P | DONE |
Jim Sly
|
|
|
Please call me when you are on your way. I''ll be gone a lot this afternoon. Phone #: ###-#### Inspection requested via web by Bob Thornton Walk Thru with Bob.
|
BLD-Wall cover | 9/26/2016 | 9/27/2016 | 9/27/2016 | A | PART |
Jim Sly
|
|
|
Bob Phone #: ###-#### Corridor ceilings OK to cover at three floors.....North Wing.
|
BLD-Aging Inspection | 8/3/2016 | 8/3/2016 | 8/5/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/4/2016 | 8/4/2016 | 8/5/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Conference | 7/26/2016 | 7/27/2016 | 7/27/2016 | A | DONE |
Jim Sly
|
|
|
South half 1st floor shear walls. 2nd floor shear walls. 3rd floor shear walls. roof nailing. Exterior shear wall nailing. Call me when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Conference | 7/7/2016 | 7/7/2016 | 7/7/2016 | P | DONE |
Jim Sly
|
|
|
Please call me when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Conference | 5/16/2016 | 5/16/2016 | 5/17/2016 | P | DONE |
Jim Sly
|
|
|
Jim, Please call when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Conference | 5/11/2016 | 5/13/2016 | 5/13/2016 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Bob Thornton
|
CHANGE STATUS TO (ISS) | | | 4/27/2016 | | DONE |
Christina Prado
|
|
|
Plan mod fees paid, all requirements met
|
OVERRIDE | | | 4/6/2016 | | |
|
|
|
|
Plan assigned to (CJW) | 3/28/2016 | 3/28/2016 | 4/6/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 4/4/2016 | | 4/6/2016 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/6/2016 | | DONE |
|
|
|
Plan mod fees due- DO NOT RE-ISSUE
|
Plan Modification Accepted | | | 4/4/2016 | | DONE |
|
|
|
Workflow received by Carl
|
Plan Modification Accepted | | | 3/31/2016 | | DONE |
Carl Westfall
|
|
|
Workflow received by Tim
|
Plan Modification Accepted | | | 3/28/2016 | | DONE |
Christina Prado
|
|
|
revisions to remove cantaleiver from plans
|
BLD-Footing | 3/22/2016 | 3/22/2016 | 3/22/2016 | P | PASS |
Phil Shearer
|
|
|
Column footings. Pending special inspection
|
CHANGE STATUS TO (ISS) | | | 3/22/2016 | | DONE |
Christina Prado
|
|
|
Plan mod fees paid in full, permit can now be reactivated
|
OVERRIDE | | | 3/10/2016 | | |
|
|
|
|
Plan assigned to (CJW) | 3/3/2016 | 3/3/2016 | 3/10/2016 | | PASS |
Carl Westfall
|
|
|
Plan mod Crescent Rim
|
Routing - Addressing | 3/9/2016 | | 3/10/2016 | | PASS |
Laura Hunter
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/10/2016 | | DONE |
Christina Prado
|
|
|
Plan Mod approved - DO NOT RE-ISSUE - All requirements met for plan mod approval
Must pay all fees prior to changing status to ISS
|
Plan Modification Accepted | | | 3/9/2016 | | DONE |
|
|
|
Hung up because plan mods don't route directly to the Plans Examiner who did the original review.
|
Routing - PLAN CHECK | 3/8/2016 | | 3/9/2016 | | PASS |
Carl Westfall
|
|
|
Plan mod approved
|
Plan Modification Accepted | | | 3/3/2016 | | DONE |
Carl Westfall
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/25/2016 | | DONE |
Christina Prado
|
|
|
Plan mod fees paid in full, permit re-opened to ISS status
|
OVERRIDE | | | 1/13/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 1/13/2016 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 12/16/2015 | | DONE |
|
|
|
Uploaded revised sheets S1.00, S2.19, S2.20, and S2.51. The sound engineer reduced the spacing of some floor joists from 19.2 inches to 16 inches on center and changed the type of joist from 14-TJI-210 to 14-TJI-110. According to one our Structural Consultant Engineers, the floor capacity is exactly the same.
|
Plan resubmittals received | | | 12/15/2015 | | DONE |
|
|
|
Resubmittals recieved in E-Plan. TLW
|
Routing - PLAN CHECK | 12/15/2015 | | 12/15/2015 | | PASS |
Carl Westfall
|
|
|
Routing completed
|
Routing - PLANNING Land Div | 12/15/2015 | | 12/15/2015 | | PASS |
Dave Abo
|
|
|
Amended condo plat recorded.
|
Plan assigned to (CJW) | 4/14/2015 | | 12/15/2015 | | PASS |
Carl Westfall
|
|
|
(1st done) CRESCENT RIM - BUILDING #4 (May 18 - 15 days / May 28 - 24 days) New building
|
Plan resubmittals requested | | | 8/27/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/21/2015 | | 8/27/2015 | | DONE |
Carl Westfall
|
|
|
Routing complete
|
Routing - PLUMBING | 8/24/2015 | | 8/25/2015 | | PASS |
Bill VanDegrift
|
|
|
secondary drainage for the deck areas must be sized according to the area of the deck.
|
Routing - PLANNING Land Div | 8/24/2015 | | 8/25/2015 | | FAIL |
Dave Abo
|
|
|
Amendments must be filed with the Ada County Surveyor and recorded prior to issuance of building permit. Called Jerry Hastings at Ada County on 8/25. He had not seen drawings yet.
|
Routing - Erosion and Sediment | 8/24/2015 | | 8/25/2015 | | PASS |
Evan Jenkins
|
|
|
(CRESCENT RIM RESIDENTIAL CONDOMINIUM BUILDING #4 – THREE STORIES ABOVE EXISTING GARAGE – DRH05-00397 AND CUP04-00107) This project description replaces all previous descriptions. The work is required to comply with all applicable codes and ordinances in effect on August 14, 2006, the date of permit application. To construct a 3 story, 53,543 square foot residential apartment building (19,822 square feet 1st story, 19,822 square feet 2nd story, and 13,899 square feet 3rd story) on top of an existing 18,661 square foot basement parking garage. The basement was constructed under permit BLD06-02321 . There will be 19 dwelling units and 1 hotel suite within this building. There will be 2 Type A dwelling units, 17 Type B dwelling units, and 1 accessible hotel suite. The work is to include concrete footings, concrete piers, concrete stem walls, concrete slabs on grade, exterior wood stud bearing walls,
|
Plan resubmittals received | | | 8/21/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 7/31/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/29/2015 | | 7/31/2015 | | DONE |
Carl Westfall
|
|
|
Routing completed
|
Routing - PLUMBING | 7/29/2015 | | 7/30/2015 | | FAIL |
Bill VanDegrift
|
|
|
please address secondary drainage for the deck areas
|
Routing - PLANNING Land Div | 7/29/2015 | | 7/29/2015 | | FAIL |
Dave Abo
|
|
|
Must file condominium amendment with Ada County Surveyor to match proposed floor plans for Building 4. Amendment must be recorded prior to issuance of building permit.
|
Routing - Erosion and Sediment | 7/29/2015 | | 7/29/2015 | | FAIL |
Evan Jenkins
|
|
|
Jeff,
Per our earlier phone conversation, due to your project being over 1 Acre in size, you will need to develop a Storm Water Pollution Prevention Plan (SWPPP) to meet Federal EPA 2012 Construction General Permit Requirements. The City of Boise will accept this document to meet the City’s BCC 8-17 ESC Requirements.
You will also need to submit an eNOI (Electronic Notice of Intent). This requires a 14 day waiting period for the EPA to review and approve. I would submit your eNOI first, then focus on developing your SWPPP. Once complete, you can upload this document into ePlan for my review and approval.
|
Plan resubmittals received | | | 7/29/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 7/24/2015 | | DONE |
|
|
|
|
Routing - PLUMBING | 7/16/2015 | | 7/24/2015 | | FAIL |
Bill VanDegrift
|
|
|
please address current change marks. secondary drainage from decks.
|
Routing Off Site - STRUCTURAL | 7/16/2015 | | 7/23/2015 | | PASS |
Carl Westfall
|
|
|
Chris Merrill - all issues resolved
|
Routing - PLAN CHECK | 7/13/2015 | | 7/22/2015 | | PASS |
Carl Westfall
|
|
|
(7-22-15) Resubmittal review except for structural. Waiting to hear the results of the consultant's 2nd review.
(7-23-15) Consultant Structural Engineer approved.
|
Routing - Erosion and Sediment | 7/16/2015 | | 7/20/2015 | | FAIL |
Evan Jenkins
|
|
|
Full ESC Narrative and Site Map Required for Approval. Both documents are missing, and need to meet the updated BCC 8-17 and Federal 2012 Construction General Permit. Evan Jenkins ###-####
(CRESCENT RIM RESIDENTIAL CONDOMINIUM BUILDING #4 – THREE STORIES ABOVE EXISTING GARAGE – DRH05-00397 AND CUP04-00107) The NFPA 13-R fire sprinkler system is used for occupancy. This project description replaces all previous descriptions. The work is required to comply with all applicable codes and ordinances in effect on August 14, 2006, the date of permit application. To construct a 3 story, 53,543 square foot residential apartment building (19,822 square feet 1st story, 19,822 square feet 2nd story, and 13,899 square feet 3rd story) on top of an existing 18,661 square foot basement parking garage. The basement was constructed under permit BLD06-02321
|
Routing - PLANNING Land Div | 7/16/2015 | | 7/16/2015 | | FAIL |
Dave Abo
|
|
|
Must file amendment to Spectacular Condominiums to match floor plans as proposed prior to issuance of building permit.
|
Plan resubmittals received | | | 7/13/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 5/28/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/28/2015 | | 5/28/2015 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing Off Site - STRUCTURAL | 4/28/2015 | | 5/14/2015 | | FAIL |
Carl Westfall
|
|
|
See Structural Consultant's plan review report.
|
Routing - FIRE | 4/28/2015 | | 5/11/2015 | | PASS |
Scott Arellano
|
|
|
Attached revised comments to plans.
|
Routing - PLUMBING | 4/28/2015 | | 5/6/2015 | | FAIL |
Bill VanDegrift
|
|
|
provide secondary drains for all deck areas.(3rd floor)
|
Routing - MECHANICAL | 4/28/2015 | | 5/6/2015 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 4/28/2015 | | 4/29/2015 | | PASS |
Sarah Schafer
|
|
|
|
Routing - Addressing | 4/28/2015 | | 4/29/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 4/28/2015 | | 4/28/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 4/28/2015 | | 4/28/2015 | | FAIL |
Evan Jenkins
|
|
|
Full ESC Narrative and Site Map required for approval per BCC 8-17. SWPPP would also be accepted to meet the City's ESC Requirements.
|
Routing - PLANNING Land Div | 4/28/2015 | | 4/28/2015 | | FAIL |
Dave Abo
|
|
|
Prior to issuance of building permit. Spectacular Condominium plat must be amended to reflect changes to floor plan for Building 4.
|
Plan resubmittals received | | | 4/24/2015 | | DONE |
|
|
|
All time spent examining the submitted documents from this date shall be tracked so that plan modification fees can be determined.
|
Plan Modification Accepted | | | 4/21/2015 | | DONE |
|
|
|
Started mod workflow
|
BLD-Aging Inspection | 1/21/2015 | 1/21/2015 | 1/21/2015 | | PEND |
Phil Shearer
|
|
|
|
BLD-Aging Inspection | 10/22/2014 | 10/22/2014 | 10/22/2014 | | PART |
Phil Shearer
|
|
|
Work in progress
|
BLD-Aging Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/23/2014 | 1/23/2014 | 1/23/2014 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 7/25/2013 | 7/25/2013 | 7/25/2013 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/25/2013 | 4/25/2013 | 4/25/2013 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/24/2013 | 1/24/2013 | 1/24/2013 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/25/2012 | 10/25/2012 | 10/25/2012 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 7/26/2012 | 7/26/2012 | 7/26/2012 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/26/2012 | 4/26/2012 | 4/26/2012 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Other | 1/26/2012 | 1/26/2012 | 1/26/2012 | P | PEND |
Tom Arcoraci
|
|
|
|
BLD-Other | 1/25/2012 | 1/25/2012 | 1/25/2012 | P | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/25/2012 | 1/25/2012 | 1/25/2012 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/26/2011 | 10/26/2011 | 10/26/2011 | | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Aging Inspection | 7/27/2011 | 7/27/2011 | 7/27/2011 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/25/2011 | 4/25/2011 | 4/25/2011 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 2/21/2011 | 2/21/2011 | 2/22/2011 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 12/20/2010 | 12/20/2010 | 12/20/2010 | | PART |
Tom Arcoraci
|
|
|
|
Override - Parcel Holds | | | 12/9/2010 | | |
|
|
|
|
Override - Parcel Holds | | | 12/9/2010 | | |
|
|
|
|
Permit Ready to Issue | | | 12/9/2010 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/9/2010 | | DONE |
Christina Prado
|
|
|
Plan modification issued
|
(F) Reprint permit | | | 12/9/2010 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (DRS) | 11/29/2010 | | 12/7/2010 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 12/6/2010 | | 12/7/2010 | | PASS |
Dan Stuart
|
|
|
Copy of signed Plan Mod Alternate Request letter attached to plans. Plans to permit desk to issue.
|
Print Occupancy Form | | | 12/7/2010 | | DONE |
|
|
|
|
Telephone call | | | 12/7/2010 | | DONE |
|
|
|
12-7-10 called Richard Honsinger permit ready and fee given ///dld
|
Routing - FIRE | 12/1/2010 | | 12/6/2010 | | PASS |
Scott Arellano
|
|
|
Plan Mod Alternate to modify previously approved alternate of 9/30/08 (copy attached to plans.) Attached updated Fire Plan review comments to Permit Case.
|
Routing - PLAN CHECK | 11/30/2010 | | 12/1/2010 | | PEND |
Dan Stuart
|
|
|
Pending final signed and dated copy of approved alternate request. Routing plans to fire code analyst for review.Plan Mod Alternate to modify previously approved alternate of 9/30/08 (copy attached to plans
|
Routing - Design Review | 11/29/2010 | | 11/30/2010 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer
|
CHANGE STATUS TO (REV) | | | 11/29/2010 | | DONE |
Jason Blais
|
|
|
|
Plan Modification Accepted | | | 11/23/2010 | | DONE |
|
|
|
Plam modification excepted for BLD06-02324 to add partition and exit door from lower level mechanical space to allow temoprary occupancy of building 4 mechanical.routed to Sam Z for review
|
BLD-Aging Inspection | 10/20/2010 | 10/20/2010 | 10/20/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 8/16/2010 | 8/16/2010 | 8/17/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 6/14/2010 | 6/14/2010 | 6/14/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/14/2010 | 4/14/2010 | 4/14/2010 | | PASS |
Tom Arcoraci
|
|
|
|
Case Summary (BLD) | | | 3/15/2010 | | DONE |
|
|
|
|
BLD-Aging Inspection | 2/11/2010 | 2/11/2010 | 2/11/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 11/30/2009 | 11/30/2009 | 11/30/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/25/2009 | 11/25/2009 | 11/30/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/25/2009 | 9/25/2009 | 9/25/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 7/21/2009 | 7/21/2009 | 7/21/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 5/19/2009 | 5/19/2009 | 5/19/2009 | | PASS |
Tom Arcoraci
|
|
|
no call for insp
|
BLD-Aging Inspection | 3/17/2009 | 3/17/2009 | 3/17/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/14/2009 | 1/14/2009 | 1/14/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/14/2008 | 11/14/2008 | 11/14/2008 | | PASS |
Tom Arcoraci
|
|
|
|
Additional plans submitted | | | 9/9/2008 | | DONE |
Barbara Stitt
|
|
|
Received 4 copies of a letter to Dave Hanneman & George Slane dated 9-8-08 (2 pgs) from Andy Erstad, 1 to Jenifer Gilliland, 1 George Slane, 1 to Sam Rogers, 1 to Dan Stuart///9-9-08 BAS
|
BLD-Aging Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 3/27/2008 | 3/27/2008 | 3/27/2008 | | NR |
Tom Arcoraci
|
|
|
|
Plan resubmittals received | | | 1/23/2008 | | |
|
|
|
Received 1 cover transmittal, 1 letter from Rishard Honsinger dated 1-22-08, 1 copy of sheet SK1/A900 and taken to Marlene Southard's desk///1-23-08 @ 2:30pm BAS
|
Permit Ready to Issue | | | 12/27/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/27/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/27/2007 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 8/14/2006 | 8/14/2006 | 12/26/2007 | | PASS |
|
|
|
12/26/2007 09:52:16 MYS - activity updated through activity BLDA022 from case BLD06-02324.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/26/2007 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/11/2007 | | 12/18/2007 | | PASS |
|
|
|
12/11/07 -Routed resubmittals to outside engineer for review.
12/17/2007 - Review completed. All items adequately addressed.
|
Plan resubmittals received | | | 12/11/2007 | | |
|
|
|
Received transmittal, and five copies of response letter and structural calculations; taken to Marlene S.//per Marlene called Action Couriers to send one copy to outside engineering
|
Routing Off Site - STRUCTURAL | 11/27/2007 | | 12/4/2007 | | FAIL |
|
|
|
11/27/2007 - Routing structural resubmittals to outside engineer for review. (msouthard)
12/4/2007 - Received review by outside engineer. Additional submittals are required. Sent comments to architect and construction manager.
|
Routing - FIRE | 12/3/2007 | | 12/4/2007 | | PASS |
Scott Arellano
|
|
|
Attached updated plan sheets to plans. Plans approved per revised sheets A200, A201, A202, A203, A217, A218, A219, A220. (received on 11/29/07)
|
Plan resubmittals received | | | 11/29/2007 | | |
|
|
|
Received letter and three copies of pages A200, A201, A202, A203, A217, A218, A219, A220; taken to Marlene
|
Telephone call | | | 11/27/2007 | | |
|
|
|
Called Action Couriers for pick up
|
Routing - PLAN CHECK | 10/23/2007 | | 11/27/2007 | | PEND |
|
|
|
10/23/2007 - On hold waiting for resubmittals.
11/27/2007 - Resbumittals received and routing to others for rereview.
|
Routing - PLANNING | 11/27/2007 | | 11/27/2007 | | PASS |
|
|
|
Approved per DRH07-00548 and per the Conditional Use Permit as reviewed by Schafer and Riddle.
|
Plan resubmittals received | | | 11/26/2007 | | |
|
|
|
Received transmittal, response letter, one copy of supplemental calcs, and three copies of pages S1.01, S2.01W, S2.02, S2.03, S2.04, S2.04A, S2.04B, S2.18W, S2.19, S2.20, S2.21, S2.21A(6 copies total of S2.21A only), S2.21B, S5.00, S5.04, S5.05, S5.06; taken to Marlene S.
|
Routing Off Site - STRUCTURAL | 10/18/2007 | | 11/2/2007 | | FAIL |
|
|
|
10/18/07 - Routed to outside structural review copies of resubmittal structural plan sheets and calculations. (msouthard)
Called Action Courier for pick up 10/18/07 @ 9:49am BAS
11/2/07 - Received structural review comments from outside engineer and sent via e-mail to architect, structural engr., and construction manager. (msouthard)
|
Routing - FIRE | 10/18/2007 | | 10/23/2007 | | FAIL |
|
|
|
Attached revised review comments to plans. emailed updated reviews to David Holm and architect.
|
Routing - PLAN CHECK | 3/30/2007 | | 10/18/2007 | | PEND |
|
|
|
Routing on to Fire while Dan S. is preparing plan review follow up report and waiting for structural review comments.
|
Routing - PLUMBING | 10/17/2007 | | 10/17/2007 | | PASS |
|
|
|
secondary drainage will be required for roof areas with wall enclosures.
|
Plan resubmittals received | | | 10/15/2007 | | |
|
|
|
Received 1 cover transmittal, 1 responce letter from Tikker Engineering with supplemental calcs, 1 responce letter from Kieffer Design Group, 1 responce letter from Driscoll Architecs and the following sheets-A201, A202, A203, A204, 205, A206, A207, A208, A209, A210, A211, A212, A213, A214, A215, A216, A217, A218, A219, A220, A221, A230, A237, A238, A239, A240, A241, A242, A244, A253, A305, A704, A800, A801, A802, A803, A810, A811, ID.19, M500,M501, M514, M515, E1.1 are at Barb's desk for insertion///10/15/07 @ 4:45pm
A structural supplemental calcs book and the following sheets-S1.00, S1.01, S2.00, S2.01F, S2.01R, S2.01W, S2.02, S2.03, S2.04, S2.04A, S2.04B, S2.05, S2.06F, S2.06R, S2.06W, S2.07, S2.08, S2.09, S2.10, S2.10A, S2.11, S2.12F, S2.12R, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.16A, S2.17, S2.18F, S2.18R, S2.18W, S2.19, S2.20, S2.21, S2.21A, S2.21B, S3.00, S3.01, S3.02, S3.03, S4.00, S4.01, S4.02, S5.00, S5.01, S5.02, S5.03, S5.04, S5.05, S5.06, S6.00 for Marlene at Barb's desk 10/15/07 @ 4:45pm
|
Plan resubmittals received | | | 10/12/2007 | | |
|
|
|
Matt Siegenthaler inserted the following pages in to plans--Cov, A001, A002, A003, A012, A013, A200, A201, A202, A203, A204, A205, A206, A207, A208, A209, A210, A211, A212, A216, A217, A218, A219, A220, A221, A230, A231, A232, A233, A234, A235, A236, A243, A244, A245, A246, A247, A248, A249, A250, A251, A252, A253, A254, A260, A261, A262, A270, A271, A272, A300, A301, A302, A303, A304, A310, A325, A360, A361, A362, A363, A364, A365, A500, A700, A701, A702, A703, A704, A705, A706, A707, A710, A800, A801, A802, A803, A804, A810, A811, A813, A822, A900, A902, WP-000, WP-001, WP-002, WP-003, WP-004, WP-005, WP-006, WP-007, ID.01, ID.01A, ID.02, ID.02A, ID.13, ID.14, ID.15, ID.19A, S1.00, S1.01, S2.01W, S2.02, S2.03, S2.04, S2.04A, S2.04B, S2.06W, S2.07, S2.08, S2.09, S2.10, S2.10A, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.16A, S2.18W, S2.19, S2.20, S2.21, S2.21A, S2.21B, S5.00, S5.01, S5.03, S5.04, S5.05, S5.06, S6.00, M100, M101, M102, M103, M104, M200, M201, M202, M203, M204, M300, M301, M302, M303, M314, M315, M316, M317, M400, M401, M402, M403, M405, M410, M414, M415, M416, M417, M500, M501, M502, M503, M504, M505, M508, M509, M510, M513, M514, M515, M516, M517, FP100, FP101, FP102, FP103, FP104, FP105, FP106, FP107, FP108, FP109, FP110, E0.0, E1.0, E1.2, E1.3, E1.4, E1.5, E1.6, E1.7, E1.8, E1.9, E2.0, E2.1.0L, E2.1.0P, E2.1.1L, E2.1.1P, E2.1.3L, E2.1.3P, E2.1.4, E2.10, E2.14, E2.16, E2.17, E2.18, E2.19, E2.2.1L, E2.2.1P, E2.21, E2.3.1L, E2.3.1P, E2.4.0L, E2.4.0P, E2.4.1L, E2.4.1P, E2.4.2L, E2.4.2P, E2.4.3L, E2.4.3P, E2.4.4, E2.5, E2.6, E2.8, E2.9, E3.0, C1.0, C2.0, C3.0, C3.1, C3.2, C3.3, C3.4, C3.5, C3.6, C3.7, C3.8, C4.0, C4.1, C4.2, C4.3, C4.4, C4.5, C5.0, C6.0, C7.0, C8.0, Letters from Driscoll Architects for responce comments, info from Creighton Engineers regarding Fire Suppression, Info from Kieffer Design Group regarding interior, info from Tikker for MEC & PLM, Info from Musgrove regarding ELE, info from Yu & Trochalakis regarding structural, Responce & supplemental calcs
|
Routing - FIRE | 3/29/2007 | | 3/30/2007 | | FAIL |
|
|
|
Emailed resubmittal items to Matt Driscoll. Added IFC review comments to plan documents.
|
1st review completed | | | 3/30/2007 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 1/29/2007 | | 3/29/2007 | | FAIL |
|
|
|
Plan review completed, sent correction report to the architect requesting additional informaiton to be submitted for further review prior to issuing permit.
|
Routing - PLUMBING | 1/29/2007 | | 1/29/2007 | | FAIL |
|
|
|
no corrections made
|
Routing - PLAN CHECK | 9/25/2006 | | 1/27/2007 | | ---- |
|
|
|
Plans routed back to Plumbing for review. Building code items not reviewed at this time.
|
Plan resubmittals received | | | 12/8/2006 | | |
|
|
|
Received 4 copies of pages M100, M200, M201, M202, M203; taken to Mike Phillips
|
Routing - PLANNING Land Div | 12/8/2006 | | 12/8/2006 | | PASS |
|
|
|
|
Routing - FIRE | 9/21/2006 | | 9/25/2006 | | FAIL |
|
|
|
Faxed resubmittal items to architect. Reviewed for water supply and access only.
|
Routing - PLAN CHECK | 9/6/2006 | | 9/21/2006 | | |
|
|
|
PLANS ROUTED TO FIRE FOR ACCESS & WATER REQUIREMENTS ONLY. Review for all building code requirements not completed at this time.
|
Routing - PLANNING | 9/5/2006 | | 9/6/2006 | | FAIL |
|
|
|
Failed both DR and CU. Letter to be issued. DRH05-00397 and CUP05-00015.
|
Routing - PLUMBING | 8/30/2006 | | 9/5/2006 | | FAIL |
|
|
|
plans ane incomplete, please address the above listed items.
|
Routing - Erosion and Sediment | 8/29/2006 | | 8/30/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/22/2006 | | 8/29/2006 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/15/2006 | | 8/28/2006 | | FAIL |
|
|
|
8/15/06 - Called Action Courrier for pick up 8/15/06 @ 12:30pm BAS. Original submittal includes structural for concrete package only.
8/28 - Concrete package review received. Review failed.
|
Routing - Addressing | 8/24/2006 | | 8/24/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 8/14/2006 | | 8/22/2006 | | FAIL |
|
|
|
parcels not combined
|
Plan routing begun/NEW & ADDTN | | | 8/14/2006 | | |
|
|
|
|
Application received | | | 8/14/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/14/2006 | | |
|
|
|
|
First Notice | | 3/26/2018 | | | |
|
|
|
|