Permit Information
Permit NumberBLD06-02349
StatusFinaled
Name BOWN TAVERN
Site Address 3111 S BOWN WAY
Project NameBown Crossing Market Place
Customer Number 
ePlanReviewNo
Description
(BOWN TAVERN - BOWN CROSSING - BLDG H) This building is fire sprinklered for story increase and fire area. To construct interior improvements for a new restaurant/bar tenant to be located within a new 6,696 square foot, 2 story building. Work is to include 3 restrooms accessible to the disabled, interior nonbearing walls, suspended ceilings, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. CZC06-00152 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD3/21/20073/21/20074/10/2007 DONE
Second Notice has not been responded to.
Second Notice BLD3/8/20073/8/20073/21/2007 DONE
First Notice has not been responded to.
First Notice 2/12/20073/8/2007 DONE
Permanent occupancy  2/12/2007 DONE
Perm. Occ. Cert. # 11434 issued 2-12-07 to the Tavern at Bown Crossing.
BLD-Final2/9/20072/9/20072/9/2007PPASS
DetailsJim Storey
final ok
BLD-Final2/8/20072/9/20072/9/2007APASS
DetailsJim Storey
Jim ; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Permanent Occupancy 2/9/20072/9/2007 DONE
Details
FIRE-Final Inspection2/8/20072/8/20072/8/2007PPASS
DetailsTroy Cobbley
life safety finaled
FIRE-Final Inspection2/6/20072/7/20072/7/2007AFAIL
DetailsTroy Cobbley
The fire permit for the hood supression system needs finaling and all exit signs/emergency lights need to be installed/tested per the city approved plans.
BLD-Other2/6/20072/6/20072/6/2007PCANC
DetailsJim Storey
jim- code enforcement landscape; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Energy code compliance2/5/20072/5/20072/5/2007PNR
DetailsJim Storey
jim; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Other1/24/20071/24/20071/24/2007PPASS
DetailsDave Hannah
jim Note: t-bar ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in12/13/200612/14/200612/14/2006APASS
DetailsJim Storey
Jim; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
FIRE-Conference12/8/200612/11/200612/11/2006ADONE
DetailsForrest France
On site conference to discuss life safety items including exit signage, emergency lighting, fire extinguishers, alarm and hood suppression permits.
Issue PAID IN FULL permit  10/19/2006 DONE
Print Occupancy Form  10/10/2006  
Telephone call  10/10/2006 DONE
tlk to secretary for richard ###-#### that permit and fees are ready to be picked up but needs ACHD/GC
Permit Ready to Issue  10/10/2006 DONE
Plan assigned to (CJW)8/28/2006 10/9/2006 PASS
10/9/2006 16:31:53 CJW - activity updated through activity BLDA022 from case BLD06-02349.
Routing - PLAN CHECK10/6/2006 10/9/2006 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  10/9/2006 DONE
Routing - FIRE10/4/2006 10/6/2006 PASS
Attached updated review comments to plans.
Plan resubmittals received  10/5/2006  
Received transmittal letter and 2 copies of page f2.11; taken to Carl Westfall
Routing - PLAN CHECK9/29/2006 10/4/2006 FAIL
Completed resubmittal review. Waiting for revised Sheet f2.11.
Plan resubmittals received  9/29/2006  
Received 1 cover transmittal, 1 copy of plan review response letter (3pgs), 1 review response from AHJ (4pgs), 2 copies of sheets- A0.11, A2.00, A2.11, A2.12, A2.21,A2.22, A3.21, A3.22, A4.11, A5.11, A5.12, A6.11, E0.0, E1.0, E2.11, E2.21, M1.01, M1.02, M1.03, P1.01, P1.02, P1.03 and taken to Carl Westfall
Plan resubmittals received  9/29/2006  
Received 1 cover transmittal, 2 copies of the foolowing sheets--A2.11, A2.12 for Fire Review taken to Carl Westfall
Routing - FIRE9/26/2006 9/29/2006 FAIL
Faxed resubmittal items to architect.
1st review completed  9/29/2006 FAIL
Failed plan check & fire.
Routing - PLAN CHECK9/8/2006 9/26/2006 FAIL
The IBC plan review was started on September 19, 2006 and was finished on September 26, 2006. Revised drawings were required. See the plan review report.
Routing - PLUMBING8/31/2006 9/8/2006 PASS
add faucett and hand sink in the 1st. floor kitchen per CDHD. additional cross connection protection may be required. extend 2" water line from 1st. floor restrooms to service connection.
Routing - PLANNING8/29/2006 8/31/2006 PASS
Greg Johnson CZC06-00152
Routing - PUBLIC WORKS8/28/2006 8/29/2006 PASS
Plan Reviewer's activity  8/28/2006 DONE
Plans okay to begin routing. Greg Johnson (Planning staff), sent a e-mail to Marlene Southard stating that this project "will not require additional approvals from Planning staff because the primary function of the business is a restaurant, which is an allowed use in the Pedestrian Commercial zone."
Plan Reviewer's activity  8/22/2006 HOLD
Plans on hold until determination is made by Scott Spjute on a tavern/bar to be constructed in a PC-D zone. Plans in Marlene's room.
Application received  8/16/2006  
Plans ACCEPTED BY PLAN TECH  8/16/2006  
Recd Pcfee & Taken To Pln CK  8/16/2006