Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD06-02357
StatusFinaled
Name MENG-HANNAN CONSTRUCTION
Site Address 5230 W FRANKLIN RD
Project Name 
Customer Number 
ePlanReviewNo
Description
(Meng-Hannan Construction RCE-19039) Fred Meyer - Fuel Stop - To construct a new 3,956 sq.ft. gas island canopy with a pre-manufacutred 114 sq. ft. kiosk in the existing parking lot. All construction is per approved plans and attachments, DRH06-00267. Separate permits are required for fuel tanks from Boise Fire. State of Idaho Tag# for the Kiosk is 13468FB.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval3/28/20073/28/20073/28/2007 DONE
Final inspection signed off 03/26/07 by R. Anderson.
Letter of compliance  3/26/2007 DONE
Letter of Compliance issued 3-26-07
Code Occupancy Approval3/22/20073/22/20073/22/2007PPASS
DetailsDena Gambrel
3-22-07 Final Occupancy Signed.
FIRE-Final Inspection3/22/20073/22/20073/22/2007PPASS
DetailsTroy Cobbley
LIfe safety passed.
BLD-Final3/21/20073/22/20073/22/2007APASS
DetailsTom Arcoraci
Vick; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
BLD-Foundation2/14/20072/15/20072/15/2007APART
DetailsJim Sly
vic- early morning; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
Kiosk......Special insp req on project......Kiosk foot/wall OK pending special insp, tests and approvals from MTI
BLD-Footing2/14/20072/15/20072/15/2007ACANC
DetailsTom Arcoraci
vic - early morn if possible; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Footing2/5/20072/6/20072/6/2007APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/5/2007 at 12:56:43 PM. spec insp
BLD-Conference2/2/20072/5/20072/5/2007APASS
DetailsTom Arcoraci
vic; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
CHANGE STATUS TO (ISS)  1/16/2007 DONE
already pd on 1/11/06/mls
Telephone call  1/11/2007  
telephone call with someone from Meng-Hannan said he mailed in check for fees due, told him fees still due and need ACHD
Telephone call  12/7/2006  
talked to jake at ###-#### to verify plans are ready. & need achd
Telephone call  10/4/2006 DONE
tlk to nicole anderson ###-#### that permit and fees are ready to be picked up needs ACHD, GC, RP
Permit Ready to Issue  10/4/2006 DONE
Print Occupancy Form  10/3/2006 DONE
Plan assigned to (MLO)8/17/2006 10/2/2006 PASS
10/2/2006 15:40:50 MLO - activity updated through activity BLDA022 from case BLD06-02357.
Plan resubmittals received  10/2/2006 DONE
Received 1 letter of transmittal ,2 structural calcs,2 copys of sheets A1,A1.1,AB1 OF 1,E1 OF 4,E2 OF 4, E3 OF 4,E4 OF 4 taken to Mike O.
Plan resubmittals received  10/2/2006  
Received 2 design calcs taken to Mike Otto
Case Summary (BLD)  10/2/2006  
Routing - PLAN CHECK10/2/2006 10/2/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/2/2006 DONE
Routing - FIRE8/31/2006 9/5/2006 PASS
Attached review comments to plans.
1st review completed  9/5/2006 FAIL
Failed plan check.
Plan resubmittals requested  8/31/2006 DONE
Metal building plans, foundation plans not provided
Routing - PLAN CHECK8/29/2006 8/31/2006 FAIL
corrections sent to Great Basin Engineering
Routing - PLANNING8/28/2006 8/29/2006 PASS
DRH06-00267- Josh Wilson
Routing - PLUMBING8/28/2006 8/28/2006 PASS
per plans and 2003 upc
Routing - Erosion and Sediment8/23/2006 8/28/2006 PASS
ESC plan approved with attached conditions.
Plan resubmittals received  8/24/2006  
Received transmittal letter, 2 copies of structural calculations, 2 copies of the following pages: E1, E2, E3, EL1, EL2, M1, F1; taken to Mike Otto
Routing - PUBLIC WORKS8/22/2006 8/23/2006 PASS
Routing - PLANNING Land Div8/18/2006 8/22/2006 PASS
Plans ACCEPTED BY PLAN TECH  8/18/2006  
Plan routing begun/NEW & ADDTN  8/18/2006  
Recd Pcfee & Taken To Pln CK  8/17/2006 DONE
Application received  8/16/2006