Permit Information
Permit NumberBLD06-02377
StatusFinaled
Name CHAMBER OF COMMERCE
Site Address 250 S 5TH ST Unit: 300
Project NameC W MOORE PLAZA-3RD FLR
Customer Number 
ePlanReviewNo
Description
(R A SCHULTZ AND COMPANY RCE #2439 (CHAMBER OF COMMERCE - C.W. MOORE PLAZA - 3RD STORY) This building is required to be fire sprinklered because it is a high-rise. To create a 7,792 square foot tenant space on the 3rd story of an existing high-rise building. Work is to include interior nonbearing walls, a corridor to connect the stairways, interior doors, gypsum board ceiling soffits, interior doors, interior windows, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD5/9/20075/9/20075/15/2007 DONE
First Notice has not been responded to.
First Notice 4/23/20075/9/2007 DONE
Permanent occupancy UNPAID FEE  4/23/2007 DONE
Perm. Occ. Cert. # 11522 issued 4-10-07 to the Chamber of Commerce.
(F) Reprint permit  4/20/2007  
Permanent Occupancy 4/10/20074/10/2007 DONE
Details
BLD-Final3/23/20073/23/20073/23/2007PPASS
DetailsDave Hannah
Matt; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok for perm occ
BLD-Final1/16/20071/17/20071/17/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/15/2007 at 5:01:14 PM. Contact: ###-####. ok for temp occ ok for perm occ after elec oks for perm occ
FIRE-Final Inspection1/15/20071/16/20071/17/2007APASS
DetailsForrest France
Corrections have been verified, fire life safety inspection passed.
BLD-Final1/15/20071/16/20071/16/2007PDEFR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/15/2007 at 5:01:14 PM. Contact: ###-####.
FIRE-Final Inspection1/16/20071/16/20071/16/2007PDONE
DetailsForrest France
Duplicate inspection request.
FIRE-Alarm Testing1/15/20071/16/20071/15/2007ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/15/2007 at 4:59:03 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jan 15 2007 5:15PM.
FIRE-Final Inspection1/11/20071/11/20071/11/2007PFAIL
DetailsForrest France
Missing one exit sign, need to post max. occupant load sign, mount fire extinguishers as discussed, install closures at two locations, the project related fire alarm permit must be finaled prior to life safety final.
BLD-Framing/Rough-in11/20/200611/21/200611/21/2006PPASS
DetailsDave Hannah
jack; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in11/16/200611/17/200611/20/2006PPART
DetailsDave Hannah
jack; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover walls
Issue PAID IN FULL permit  10/19/2006 DONE
Routing - PLAN CHECK9/20/2006 9/21/2006 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  9/21/2006 DONE
Print Occupancy Form  9/21/2006 DONE
Telephone call  9/21/2006 DONE
lft vm with katie butler - ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  9/21/2006 DONE
Plan assigned to (CJW)8/28/2006 9/21/2006 PASS
9/21/2006 13:56:54 CJW - activity updated through activity BLDA022 from case BLD06-02377.
Routing - FIRE9/16/2006 9/20/2006 PASS
Attached review comments to plans.
1st review completed  9/20/2006 FAIL
Failed Plan Check.
Plan resubmittals received  9/19/2006 DONE
Received 1transmittal letter,1 response, & 2 copys of sheets A2.1,A6.2,A8.2,A10.1,P1.1 taken to Carl W.
Routing - PLAN CHECK8/29/2006 9/16/2006 FAIL
The IBC plan review was started on September 15, 2006 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS8/28/2006 8/29/2006 PASS
Plans ACCEPTED BY PLAN TECH  8/18/2006  
Recd Pcfee & Taken To Pln CK  8/18/2006  
Application received  8/17/2006