(RCE-6142 EKC INC.) (KPMG LLP - EMPIRE BUILDING - 5TH STORY) This building is fire sprinklered under the provisions of the 1994 UCBC because it is too tall and too big. To create a 1,786 square foot office tenant space on the 5th story if the Empire Building by expanding an existing 960 square foot tenant space into an adjacent area. Work is to include interior nonbearing walls, interior doors, suspended ceilings, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD2/12/20072/12/20073/1/2007 DONE
Second Notice has not been responded to.
Second Notice BLD2/2/20072/2/20072/12/2007 DONE
First Notice has not been responded to.
First Notice 12/29/20062/2/2007 DONE
Permanent occupancy  11/29/2006 DONE
Perm. Occ. Cert. # 11324 issued 11-29-06 to KPMG LLP.
BLD-Final11/27/200611/27/200611/27/2006PPASS
DetailsDave Hannah
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm occ
FIRE-Final Inspection11/22/200611/22/200611/22/2006PPASS
DetailsForrest France
Fire life safety finaled.
FIRE-Final Inspection11/14/200611/15/200611/15/2006PCANC
DetailsTroy Cobbley
To be rescheduled for tomorrow
BLD-Framing/Rough-in11/2/200611/2/200611/2/2006PPART
DetailsDave Hannah
rob - note: ceiling ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover ceiling after mec oks
BLD-Framing/Rough-in10/6/200610/9/200610/9/2006APASS
DetailsDave Hannah
Rob; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Telephone call  9/20/2006  
tlk to paul hagle ###-#### and left ms for brian ellsworth with chuck ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  9/20/2006  
Issue PAID IN FULL permit  9/20/2006  
Plan assigned to (CJW)8/28/2006 9/19/2006 PASS
9/19/2006 10:15:49 CJW - activity updated through activity BLDA022 from case BLD06-02380.
Routing - FIRE9/15/2006 9/19/2006 PASS
Attached review comments to plans.
1st review completed  9/19/2006 PASS
Routing - PLAN CHECK9/19/2006 9/19/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/19/2006 DONE
Print Occupancy Form  9/19/2006 DONE
Routing - PLAN CHECK8/29/2006 9/15/2006 PASS
The IBC plan review was started on September 14, 2006 and was finished the next day. The drawings were approved with clarification. See the plan review report.
Routing - PUBLIC WORKS8/29/2006 8/29/2006 PASS
Plans ACCEPTED BY PLAN TECH  8/23/2006  
Ok per Ron Hill to accept smaller plans///8/23/06 BAS
Recd Pcfee & Taken To Pln CK  8/18/2006  
Application received  8/17/2006