Permit Information
Permit NumberBLD06-02402
StatusFinaled
Name CM COMPANY
Site Address 4719 S MARKET ST Unit: 103
Project NameAssociated Foods Warehouse
Customer Number 
ePlanReviewNo
Description
(BOISE TENANT - ASSOCIATED FOODS WAREHOUSE - SE CORNER TENANT SPACE 103) To create a 33,602 sq.ft. secure tenant space within an existing 250,000 sq ft building for storage of high pile insulation product, per approved plans. Work to include, erection of 18 ft high metal and gypboard partitions, construction of a new vestubule, installation of new exterior overhead door located on the south side of the building, This building is fully fire sprinkled any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. The partition walls separate the areas into spaces that are less than 50,000 sq ft so that smoke and heat vents are not required. RMH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD9/22/20089/22/20081/29/2009 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice6/12/20086/12/20088/11/2008 DONE
DetailsJim Storey
BLD-Final6/12/20086/12/20086/12/2008PPASS
DetailsJim Storey
DOC - Permit Finaled6/12/20086/12/20086/12/2008PPASS
DetailsJim Storey
BLD-Aging Inspection5/9/20085/9/20085/9/2008 PASS
DetailsJim Storey
pending fire wip
BLD-Aging Inspection2/8/20082/8/20082/8/2008 PASS
DetailsJim Storey
work in progress fire plan review meetting to day for action to proceed.
Plan resubmittals received  1/23/2008  
Received 1 cover transmittal, 3 books for Storm Water, 3 O&M's, 3 copies of Storm Water Design Report, 3 copies of report from Materials Testing & Inspection dated 11-14-07, 3 copies of drainage easement, 3 copies of ESC plan, 3 copies of fire Access road and taken to Ron Hill's desk///1-23-08 @ 4:38pm BAS
BLD-Aging Inspection12/7/200712/7/200712/7/2007 NR
DetailsJim Storey
ncfi
Case Summary (BLD)  5/15/2007  
FIRE-Final Inspection3/12/20073/13/20073/13/2007APART
DetailsForrest France
Final fire life safety pending completion of the modifications for the fire sprinkler system, okay for temp. occupancy per conditions indicated in the meeting notes.
FIRE-Final Inspection3/6/20073/7/20073/7/2007AFAIL
DetailsTroy Cobbley
Inspection was for a temporary for the placement of the POD's within the building. Inspection was done per the meeting minutes. Items that still need correcting are fire extinguishers need to be placed in all spaces, the items stored in the left hand of the "Y" intersection at the west end of the building need remove for fire dept. access, remove the concrete parking curbs from the access way to the east overhead door and remove the POD's that have already been stored in the building until all items have been satified.
BLD-Final3/6/20073/6/20073/6/2007PCANC
DetailsJim Storey
rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in2/8/20072/9/20072/9/2007APASS
DetailsJim Storey
ROB; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in2/5/20072/5/20072/5/2007PPART
DetailsJim Storey
Rob Please call 15 min before ; Phone #: ###-#### Internet Inspection Request from: Darla Downs north south wall 3/4 of wall line south to north ok for cover. wip balance of walls.
Issue PAID IN FULL permit  11/27/2006 DONE
Plan assigned to (R_H)8/29/2006 11/22/2006 PASS
11/22/2006 10:21:28 MYS - activity updated through activity BLDA022 from case BLD06-02402.
Routing - PLAN CHECK11/21/2006 11/22/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/22/2006 DONE
Print Occupancy Form  11/22/2006 DONE
Telephone call  11/22/2006 DONE
TLK TO MATTHEW WITT ###-#### THAT PERMIT AND FEES ARE READY TO BE PICKED UP
Permit Ready to Issue  11/22/2006  
Routing - FIRE11/17/2006 11/21/2006 PASS
Attached updated review comments to plans.
Case Summary (BLD)  11/17/2006 DONE
Case Summary (BLD)  11/17/2006 DONE
Routing - PLAN CHECK10/6/2006 11/17/2006 PEND
Plan resubmittals received  11/15/2006  
Received transmittal letter and 3 copies of page A2.01; taken to Ron Hill
Plan resubmittals received  11/3/2006  
received letter from rudeen & asso. for ron hill & structural calcs including (69 pages + cover sheet from stapley engineering) received "3" sets of plans including 1 sheet each of AO.OO, A2.O1, A2.O2, A3.O1, A4.O2, S1, S2, & S3--plans taken to ron hill
1st review completed  10/6/2006 FAIL
Routing - FIRE10/4/2006 10/6/2006 FAIL
Faxed resubmittal items to architect. Attached review comments to plans.
Case Summary (BLD)  10/4/2006 DONE
Routing - PLAN CHECK9/1/2006 10/4/2006 FAIL
faxed and mailed requirements to the Architect, routed plans to fire on 10/04/06
Routing - PLANNING8/30/2006 9/1/2006 PASS
Sarah Schafer - Approved.
Routing - PUBLIC WORKS8/29/2006 8/30/2006 PASS
Plans ACCEPTED BY PLAN TECH  8/24/2006  
Application received  8/18/2006  
Recd Pcfee & Taken To Pln CK  8/18/2006  
BLD-Final5/29/20085/29/2008 P 
DetailsJim Storey
dan Phone #: ###-####