Permit Information
Permit NumberBLD06-02415
StatusFinaled
Name TACO DEL MAR
Site Address 2258 E GOWEN RD
Project NameColumbia Village Retail
Customer Number 
ePlanReviewNo
Description
(RCE-10367 NORTHWEST COMMERCIAL CONSTRUCTION) (TACO DEL MAR) This building is NOT fire sprinklered. To construct interior tenant improvements within a 1,342 square foot restaurant tenant space located within an existing 4,600 square one story building. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, suspended ceilings, millwork, and finishes. This building was constructed under permit BLD06-00501 and a "vanilla finish" was done under permit BLD06-02358. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  3/28/2007 DONE
call to andrea w/ a-1 and she will double check fv and call back
Telephone call  3/28/2007 DONE
call to DJ w/ All American, she will check on FV and call back.
Telephone call  3/28/2007 DONE
telephone call to frank young, left msg on ans mach to call re difference btwn gc's fv and young's fv.
Third Notice BLD2/12/20072/12/20072/22/2007 DONE
Second Notice has not been responded to.
Second Notice BLD2/2/20072/2/20072/12/2007 DONE
First Notice has not been responded to.
First Notice 1/8/20072/2/2007 DONE
Permanent Occupancy 1/8/20071/8/2007 DONE
Details
CHANGE STATUS TO (ISS)  1/8/2007 DONE
Permanent occupancy  1/8/2007 DONE
Perm. Occ. Cert. # 11386 issued 1-8-07 to Taco Del Mar.
BLD-Final12/28/200612/29/200612/29/2006APART
DetailsJim Storey
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles temp ok pending others ok for perm. occ.
FIRE-Final Inspection12/28/200612/29/200612/29/2006APASS
DetailsForrest France
Items on previous c/n have been completed, final life safety inspection passed.
BLD-Final12/27/200612/28/200612/28/2006PPART
DetailsJim Storey
MATT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles pending others
FIRE-Final Inspection12/27/200612/28/200612/28/2006AFAIL
DetailsForrest France
Need to provide current certification tags for the fire extinguishers, lower the mounting height of the PFE at the main exit, missing emergency lighting for the seating area as shown on approved plans.
Print Occupancy Form  12/21/2006  
BLD-Other12/18/200612/19/200612/19/2006PFAIL
DetailsJim Storey
Sunny, ceiling grid inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt wire can lights/ missing clip above back door/ float sys. at shed roof.
BLD-Framing/Rough-in11/4/200611/6/200611/6/2006APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/4/2006 at 10:07:47 AM. Contact: ###-####.
Issue PAID IN FULL permit  10/11/2006 DONE
Print Occupancy Form  10/10/2006 DONE
Print Occupancy Form  10/10/2006  
Telephone call  10/10/2006 DONE
tlk to jason hopkins ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  10/10/2006 DONE
Plan assigned to (CJW)8/29/2006 10/9/2006 PASS
10/9/2006 15:51:48 CJW - activity updated through activity BLDA022 from case BLD06-02415.
PLANS/APPL TAKEN TO FRONT DESK  10/9/2006 DONE
Routing - PLAN CHECK10/4/2006 10/9/2006 DONE
Plan resubmittals received  10/5/2006  
Received transmittal letter and 3 copies of the following pages: M0.0, M1.0, M2.0, P0.0, P1.0, P2.0; taken to Carl Westfall
Routing - PLUMBING10/2/2006 10/4/2006 PASS
full size cleanout required at the upper end of 4" s.s. line. 120 deg. max hot water to lavs and hand sinks.
Routing - PUBLIC WORKS9/28/2006 10/2/2006 PASS
Routing - PLAN CHECK9/20/2006 9/28/2006 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  9/21/2006  
Received transmittal letter, copy of e-mail and Plan Review Report, 2 copies fo the following pages: DD-1, DD-2, DD-3, DD-4, DD-5, M0.0, M1.0, M2.0, P0.0, P1.0, P2.0; taken to Carl Westfall
Routing - FIRE9/18/2006 9/20/2006 PASS
Attached review comments to plans.
1st review completed  9/20/2006 FAIL
Failed Plan Check, Plumbing & Public Works.
Routing - PLAN CHECK9/5/2006 9/18/2006 FAIL
The IBC plan review was started on September 16, 2006 and was finished on September 18, 2006. Revised drawings were required. See the plan review report.
Routing - PLUMBING8/30/2006 9/5/2006 FAIL
indirect grease trap to floor sink or indirect 3 compartment sink upstream. public works pretreatment approval required prior to plumbing review approval.
Routing - PUBLIC WORKS8/29/2006 8/30/2006 FAIL
Will require new plumbing plans. Contact Walt ###-####
Application received  8/21/2006  
Recd Pcfee & Taken To Pln CK  8/21/2006  
Plans ACCEPTED BY PLAN TECH  8/21/2006