Third Notice BLD | 7/18/2007 | 7/18/2007 | 7/30/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 6/21/2007 | 6/21/2007 | 7/18/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 6/1/2007 | 6/21/2007 | | DONE |
|
|
|
|
BLD-Final | 5/31/2007 | 6/1/2007 | 6/1/2007 | P | PASS |
Jim Storey
|
|
|
keith; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
FIRE-Final Inspection | 5/31/2007 | 6/1/2007 | 6/1/2007 | A | PASS |
Forrest France
|
|
|
Life safety inspection passed, fire extinguisher installed while on site, doors at some locations are not installed-verified hardware type is approved, provided signage at the main entry/exit to be attatched when finishes are complete.
|
Permanent Occupancy | | 6/1/2007 | 6/1/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/1/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11644 issued 6-1-07 to the Cornerstone Design Office.
|
BLD-Energy code compliance | 3/13/2007 | 3/14/2007 | 3/14/2007 | A | PASS |
Jim Storey
|
|
|
keith; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
Telephone call | | | 3/14/2007 | | DONE |
|
|
|
Call from Jim Story reporting on status of 2-hour stair enclosure and exit path on main floor. If door is as shown on plans at first floor only the short part of floor & support is to be 2-hour. If they decide to keep hall open both ways for exiting the entire support & floor in both directions needs protected. Jim has ask for 2-hour floor joist assembly to be provided.
|
BLD-Framing/Rough-in | 3/12/2007 | 3/12/2007 | 3/12/2007 | P | PASS |
Tom Arcoraci
|
|
|
Keith; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
Routing - PLAN CHECK | 1/9/2007 | | 1/9/2007 | | PASS |
|
|
|
Plans approved per added red-line notes thereon and all attached plan review conditions of all reviewing agencies.Routing to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/2007 | | PASS |
|
|
|
|
Permit Ready to Issue | | | 1/9/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/9/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/9/2007 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 11/15/2006 | | 1/9/2007 | | PASS |
|
|
|
1/9/2007 07:44:10 DRS - activity updated through activity BLDA022 from case BLD06-02431.
|
Routing - PUBLIC WORKS | 1/8/2007 | | 1/9/2007 | | PASS |
|
|
|
Fees adjusted to reflect addition of drinking fountain.
|
Routing - FIRE | 1/5/2007 | | 1/8/2007 | | PASS |
|
|
|
Attached revised review comments to plans.
|
1st review completed | | | 1/8/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/8/2007 | | 1/8/2007 | | PEND |
|
|
|
Routing back to Public Works for fee re-evaluation as a drinking fountain is being added to meet code compliance.
|
Routing - PLAN CHECK | 12/18/2006 | | 1/5/2007 | | PASS |
|
|
|
Plans approved to include red-lined notes and attached plan review conditions of all reviewing agencies. Routing back to Fire to re-evaluate for tenant instead of Vanilla finish & Public Works to reevaluate fee's as drinking fountain was required.
|
Print Pending Permit.LaserJet4 | | | 1/5/2007 | | |
|
|
|
|
Case Summary (BLD) | | | 1/5/2007 | | |
|
|
|
|
Plan resubmittals received | | | 12/28/2006 | | |
|
|
|
Received transmittal letter, new TI application w/cert of value (scanned into documents), 3 copies of 1pg. building specifications, and 3 copies of the following pages: 1, 2, 3, 4a, 4b, 4c, 5, D1, D2, EN-1, EN-2; taken to Dan Stuart
|
Routing - PLAN CHECK | 12/13/2006 | | 12/18/2006 | | FAIL |
|
|
|
12/15/06 - New plan submittal copies inserted into original plan submittals. Project went from a NO Tenant status to a Tenant Status for Cornerstone Design Office. Plans submitted for new tenant were modified from Vanilla finish and one of the required restrooms was removed on the resubmittals. Copy of corrections for plan review approval e-mailed to architect, Wes Steele with copy to Travis Burrows
|
Telephone call | | | 12/18/2006 | | DONE |
|
|
|
Call to Travis Burrows, Dave Evans Construction concerning the plans he submitted for review for new tenant. The required second restroom has been deleted and will thus require a fourth resubmittal before project can be considered for issuance of a building permit. Left phone voice message for Travis.
|
Plan resubmittals requested | | | 12/18/2006 | | DONE |
|
|
|
Copy of review e-mailed to Wes steele, Habitec Architects.
|
Telephone call | | | 12/18/2006 | | DONE |
|
|
|
Call from Suzie Hall, Cornerstone Design, concerning need for two fully accessible restrooms. I explained to her how number of units was determined per chapter 29 IBC. I ask concerning shower units in restrooms that were indicated on plans but not called out as to what they are or indicated on plumbing plans connection to water and sewer lines. Suzie said shower unit was proposed. This is to be addressed as part of resubmittals.
|
Plan resubmittals received | | | 12/13/2006 | | |
|
|
|
Received transmittal sheet, 3 copies of 1pg. specifications, and 3 copies of the following pages: 1, 2, 3, 4a, 4b, 4c, 5, EN-1, EN-2; taken to Dan Stuart
|
Plan Reviewer's activity | | | 12/7/2006 | | DONE |
|
|
|
E-mail to Wes Steele, architect, with copy to Dave Evans concerning the intended status for this project. Plans were placed back into review status at the request of Travis Burrows after plans had been reviewed and taken to permit desk to be issued. It is almost a month and nothing has been received.
|
CHANGE STATUS TO (REV) | | | 11/15/2006 | | |
|
|
|
They are going to resubmit plans, put permit back into REV status per Dan S.
|
Plan assigned to (DRS) | 8/31/2006 | | 11/8/2006 | | PASS |
|
|
|
11/8/2006 06:32:39 DRS - activity updated through activity BLDA022 from case BLD06-02431.
|
Plan resubmittals received | | | 11/8/2006 | | DONE |
|
|
|
Received new Lighting Compliance Certificate & Light Fixture Schedule & inserted into plans.
|
Routing - PLAN CHECK | 11/8/2006 | | 11/8/2006 | | PASS |
|
|
|
Recieved new Lighting Compliance Certificate for project. Inserted into plans. No further resubmittals required.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2006 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 11/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/8/2006 | | DONE |
|
|
|
tlk to wes steele ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 11/8/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/10/2006 | | 11/7/2006 | | FAIL |
|
|
|
Plan resubmittals did not address diferences between lighting plan and Lighting compliance certificate. Called Travis Burrows at Dale Evans construction and he will address and send me changes.
|
Plan resubmittals received | | | 11/7/2006 | | DONE |
|
|
|
Received 1 transmittal, & 2 copys of sheets 2 ,4A,4B,4C taken to Dan S.
|
Telephone call | | | 11/7/2006 | | DONE |
|
|
|
Called Travis Burrows to ask why he had not addressed the differences between the Lighting Compliance Certificate on EN-1 & Lighting Fixture layour on Sheet 5. There are two more three bulb fixture's on Sheet 5 than are indicated in energy compliance report. Travis will review and e-mail or fax me a correction and I will red-line plans so we can get permit issued. Travis said there would not be light fixture's and switches in janitor & storage closets because they would use light from lobby lighting.
|
Plan resubmittals requested | | | 11/7/2006 | | DONE |
|
|
|
Called Travis Burrows to discuss missing response data on energy code for lighting. Travis will address problem and e-mail or fax me correction and I will red-line plans.
|
Routing - FIRE | 10/6/2006 | | 10/10/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 10/10/2006 | | FAIL |
|
|
|
Failed plan check.
|
Routing - PUBLIC WORKS | 10/6/2006 | | 10/6/2006 | | PASS |
|
|
|
|
Routing - Addressing | 10/6/2006 | | 10/6/2006 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 10/6/2006 | | DONE |
|
|
|
E-mailed and faxed copy of plan review to Wes Steele.
|
Routing - PLAN CHECK | 10/6/2006 | | 10/6/2006 | | FAIL |
|
|
|
Rsubmittals required. E-mailed and faxed copy of plan review report to architect of record with copy to Dave Evans. Routing to fire code analyst for review.
|
Routing - PUBLIC WORKS | 8/31/2006 | | 10/6/2006 | | FAIL |
|
|
|
Original plans were misplaced and review was not done until new plans and application were provided on 10/6/06. New plans were routed to PW today.
|
Telephone call | | | 10/5/2006 | | DONE |
|
|
|
Called for Wes Steele, architect at Habitec at approx. 9 a.m. to let him know that we are unable to find plans for this Vanilla Finish application and that we need two more copies and an application to route for review. Left message with receptionist and told Wes to call me if he has questions.
|
Recd Pcfee & Taken To Pln CK | | | 8/23/2006 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/23/2006 | | |
|
|
|
|
Application received | | | 8/22/2006 | | |
|
|
|
|