Permit Information
Permit NumberBLD06-02431
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 1005 E PARK BLVD
Project NamePark Blvd Office Park-Bldg A
Customer Number 
ePlanReviewNo
Description
(RCE-2452 Dave Evans Construction) (Cornerstone Design Office - PARK BLVD OFFICE PARK BLDG A) To construct a 2,150 sq.ft. 1st time build-out tenant improvement for office of Cornerstone Design Office. Work includes construction of interior non-bearing walls & finishes to create offices, reception and support use areas; (2) fully accessible restrooms (his & hers) and (1) storage / utility closet with water heater and service sink. An accessible route to all areas within this tenant space is being constructed. The building SHELL permit, BLD04-01820, is still open. To upgrade electrical, mechanical & plumbing per plans and to comply with current adopted codes and ordinances. Final approval of this permit includes all red-lined notes on plans and all review conditions, comments and clarifications of all reviewing agencies as part of the approved plans requiring compliance for final approval for occupancy by Boise City PDS Dept. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD7/18/20077/18/20077/30/2007 DONE
Second Notice has not been responded to.
Second Notice BLD6/21/20076/21/20077/18/2007 DONE
First Notice has not been responded to.
First Notice 6/1/20076/21/2007 DONE
BLD-Final5/31/20076/1/20076/1/2007PPASS
DetailsJim Storey
keith; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
FIRE-Final Inspection5/31/20076/1/20076/1/2007APASS
DetailsForrest France
Life safety inspection passed, fire extinguisher installed while on site, doors at some locations are not installed-verified hardware type is approved, provided signage at the main entry/exit to be attatched when finishes are complete.
Permanent Occupancy 6/1/20076/1/2007 DONE
Details
Permanent occupancy  6/1/2007 DONE
Perm. Occ. Cert. # 11644 issued 6-1-07 to the Cornerstone Design Office.
BLD-Energy code compliance3/13/20073/14/20073/14/2007APASS
DetailsJim Storey
keith; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
Telephone call  3/14/2007 DONE
Call from Jim Story reporting on status of 2-hour stair enclosure and exit path on main floor. If door is as shown on plans at first floor only the short part of floor & support is to be 2-hour. If they decide to keep hall open both ways for exiting the entire support & floor in both directions needs protected. Jim has ask for 2-hour floor joist assembly to be provided.
BLD-Framing/Rough-in3/12/20073/12/20073/12/2007PPASS
DetailsTom Arcoraci
Keith; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
Routing - PLAN CHECK1/9/2007 1/9/2007 PASS
Plans approved per added red-line notes thereon and all attached plan review conditions of all reviewing agencies.Routing to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  1/9/2007 PASS
Permit Ready to Issue  1/9/2007 DONE
Print Occupancy Form  1/9/2007 DONE
Issue PAID IN FULL permit  1/9/2007 DONE
Plan assigned to (DRS)11/15/2006 1/9/2007 PASS
1/9/2007 07:44:10 DRS - activity updated through activity BLDA022 from case BLD06-02431.
Routing - PUBLIC WORKS1/8/2007 1/9/2007 PASS
Fees adjusted to reflect addition of drinking fountain.
Routing - FIRE1/5/2007 1/8/2007 PASS
Attached revised review comments to plans.
1st review completed  1/8/2007 PASS
Routing - PLAN CHECK1/8/2007 1/8/2007 PEND
Routing back to Public Works for fee re-evaluation as a drinking fountain is being added to meet code compliance.
Routing - PLAN CHECK12/18/2006 1/5/2007 PASS
Plans approved to include red-lined notes and attached plan review conditions of all reviewing agencies. Routing back to Fire to re-evaluate for tenant instead of Vanilla finish & Public Works to reevaluate fee's as drinking fountain was required.
Print Pending Permit.LaserJet4  1/5/2007  
Case Summary (BLD)  1/5/2007  
Plan resubmittals received  12/28/2006  
Received transmittal letter, new TI application w/cert of value (scanned into documents), 3 copies of 1pg. building specifications, and 3 copies of the following pages: 1, 2, 3, 4a, 4b, 4c, 5, D1, D2, EN-1, EN-2; taken to Dan Stuart
Routing - PLAN CHECK12/13/2006 12/18/2006 FAIL
12/15/06 - New plan submittal copies inserted into original plan submittals. Project went from a NO Tenant status to a Tenant Status for Cornerstone Design Office. Plans submitted for new tenant were modified from Vanilla finish and one of the required restrooms was removed on the resubmittals. Copy of corrections for plan review approval e-mailed to architect, Wes Steele with copy to Travis Burrows
Telephone call  12/18/2006 DONE
Call to Travis Burrows, Dave Evans Construction concerning the plans he submitted for review for new tenant. The required second restroom has been deleted and will thus require a fourth resubmittal before project can be considered for issuance of a building permit. Left phone voice message for Travis.
Plan resubmittals requested  12/18/2006 DONE
Copy of review e-mailed to Wes steele, Habitec Architects.
Telephone call  12/18/2006 DONE
Call from Suzie Hall, Cornerstone Design, concerning need for two fully accessible restrooms. I explained to her how number of units was determined per chapter 29 IBC. I ask concerning shower units in restrooms that were indicated on plans but not called out as to what they are or indicated on plumbing plans connection to water and sewer lines. Suzie said shower unit was proposed. This is to be addressed as part of resubmittals.
Plan resubmittals received  12/13/2006  
Received transmittal sheet, 3 copies of 1pg. specifications, and 3 copies of the following pages: 1, 2, 3, 4a, 4b, 4c, 5, EN-1, EN-2; taken to Dan Stuart
Plan Reviewer's activity  12/7/2006 DONE
E-mail to Wes Steele, architect, with copy to Dave Evans concerning the intended status for this project. Plans were placed back into review status at the request of Travis Burrows after plans had been reviewed and taken to permit desk to be issued. It is almost a month and nothing has been received.
CHANGE STATUS TO (REV)  11/15/2006  
They are going to resubmit plans, put permit back into REV status per Dan S.
Plan assigned to (DRS)8/31/2006 11/8/2006 PASS
11/8/2006 06:32:39 DRS - activity updated through activity BLDA022 from case BLD06-02431.
Plan resubmittals received  11/8/2006 DONE
Received new Lighting Compliance Certificate & Light Fixture Schedule & inserted into plans.
Routing - PLAN CHECK11/8/2006 11/8/2006 PASS
Recieved new Lighting Compliance Certificate for project. Inserted into plans. No further resubmittals required.
PLANS/APPL TAKEN TO FRONT DESK  11/8/2006 PASS
Inspection Record Card- Bld  11/8/2006 DONE
Telephone call  11/8/2006 DONE
tlk to wes steele ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  11/8/2006 DONE
Routing - PLAN CHECK10/10/2006 11/7/2006 FAIL
Plan resubmittals did not address diferences between lighting plan and Lighting compliance certificate. Called Travis Burrows at Dale Evans construction and he will address and send me changes.
Plan resubmittals received  11/7/2006 DONE
Received 1 transmittal, & 2 copys of sheets 2 ,4A,4B,4C taken to Dan S.
Telephone call  11/7/2006 DONE
Called Travis Burrows to ask why he had not addressed the differences between the Lighting Compliance Certificate on EN-1 & Lighting Fixture layour on Sheet 5. There are two more three bulb fixture's on Sheet 5 than are indicated in energy compliance report. Travis will review and e-mail or fax me a correction and I will red-line plans so we can get permit issued. Travis said there would not be light fixture's and switches in janitor & storage closets because they would use light from lobby lighting.
Plan resubmittals requested  11/7/2006 DONE
Called Travis Burrows to discuss missing response data on energy code for lighting. Travis will address problem and e-mail or fax me correction and I will red-line plans.
Routing - FIRE10/6/2006 10/10/2006 PASS
Attached review comments to plans.
1st review completed  10/10/2006 FAIL
Failed plan check.
Routing - PUBLIC WORKS10/6/2006 10/6/2006 PASS
Routing - Addressing10/6/2006 10/6/2006 PASS
Plan resubmittals requested  10/6/2006 DONE
E-mailed and faxed copy of plan review to Wes Steele.
Routing - PLAN CHECK10/6/2006 10/6/2006 FAIL
Rsubmittals required. E-mailed and faxed copy of plan review report to architect of record with copy to Dave Evans. Routing to fire code analyst for review.
Routing - PUBLIC WORKS8/31/2006 10/6/2006 FAIL
Original plans were misplaced and review was not done until new plans and application were provided on 10/6/06. New plans were routed to PW today.
Telephone call  10/5/2006 DONE
Called for Wes Steele, architect at Habitec at approx. 9 a.m. to let him know that we are unable to find plans for this Vanilla Finish application and that we need two more copies and an application to route for review. Left message with receptionist and told Wes to call me if he has questions.
Recd Pcfee & Taken To Pln CK  8/23/2006 DONE
Plans ACCEPTED BY PLAN TECH  8/23/2006  
Application received  8/22/2006