Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-02445
StatusFinaled
Name PIONEER HOMES
Site Address 8279 W TETHER ST
Project Name 
Customer Number 
ePlanReviewNo
Description
RCE-4897 PIONEER HOMES To construct a 2542 sq. ft. two story single family dwelling with a 711 sq. ft. attached three car garage, a 210 sq. ft. covered concrete entry porch and a 120 sq. ft. covered concrete patio at rear of structure per approved plans, all red lining and attached condition list. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." (1st floor 1292 sq. ft.)(2nd floor 1250 sq. ft.) R-1B/DA CAR05-54 ORD 6475 PC# 030 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/5/200612/6/200612/6/2006APASS
DetailsMike Jordan
ben - call for access ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
DOC - Permit Finaled12/6/200612/6/200612/6/2006PPASS
DetailsMike Jordan
BLD-Energy code compliance10/18/200610/19/200610/19/2006PFAIL
DetailsMike Jordan
mike; Phone #: ###-#### Internet Inspection Request from: Patricia Smit. All framming issues not corrected.
BLD-Framing/Rough-in10/16/200610/17/200610/17/2006APASS
DetailsMike Jordan
mike; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs to install hangar at 2ply ml in garage. ok to indsul.
BLD-Framing/Rough-in10/13/200610/16/200610/16/2006PNR
DetailsMike Jordan
mike; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs to provide correct truss engineering for framing insp. c/n posted.
BLD-Footing9/19/20069/20/20069/20/2006APASS
DetailsMike Jordan
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue PAID IN FULL permit  9/19/2006  
Permit Ready to Issue  9/18/2006 DONE
Telephone call  9/18/2006 DONE
spoke to kevin@###-####/told permit was ready, lot & block, and fees
Case Summary (BLD)  9/15/2006  
PLANS/APPL TAKEN TO FRONT DESK  9/15/2006 DONE
Inspection Record Card- Bld  9/15/2006 DONE
Routing - PLAN CHECK8/28/2006 9/15/2006 PASS
Plan assigned to (SAM)8/23/20068/23/20069/11/2006 DONE
Routing - PUBLIC WORKS8/28/2006 8/28/2006 PASS
Routing - PLANNING8/28/2006 8/28/2006 PASS
Routing - Addressing8/28/2006 8/28/2006 PASS
Application received  8/23/2006  
taken to steve monroe by mistake needs to go to addressing
Routing - Addressing8/23/2006    
Plan assigned to (DJO)9/11/2006   PEND