Permit Information
Permit NumberBLD06-02489
StatusFinaled
Name CONTRACTORS NORTHWEST
Site Address 7107 W FAIRVIEW AVE
Project NameNORTHWEST ANIMAL HOSPITAL
Customer Number 
ePlanReviewNo
Description
Northwest Animal Hospital - To construct a new 8,660 square foot, one story, masonry wall and framed animal hospital and kennel building and related site improvements. The animal hospital area is 5,380 square feet and the grooming, training and dog kennel areas are 3,280 square feet. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD9/22/20089/22/200812/5/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 9/4/20089/22/2008 DONE
BLD-Final9/4/20089/4/20089/4/2008PPASS
DetailsMike Jordan
Mike- early PM if possible Phone #: ###-####. All issues resolved. ok for perm occ.
Permanent Occupancy UNPAID FEE  9/4/2008 DONE
DetailsTisha Gallop
BLD-Final8/5/20088/8/20088/8/2008PPART
DetailsMike Jordan
mike Phone #: ###-####. ok for temp. occ. Will need plumbing and elec to go perm, provide letterfrom special insp. agency, have front counter installed and exterior landing in back.
FIRE-Final Inspection8/5/20088/8/20088/8/2008APASS
DetailsTroy Cobbley
fire life safety passed
Code Occupancy Approval8/5/20088/5/20088/5/2008PPASS
DetailsScott M.Brown
OK FOR FINAL
PubWorks Occupancy Approval8/19/20088/19/20088/5/2008 DONE
Final inspection 08/05/08 by R. Anderson
BLD-Other7/30/20087/31/20087/31/2008PPASS
DetailsTom Arcoraci
mike ###-#### - Note: ceiling grid
Override - People Holds  7/30/2008  
FIRE-Conference6/19/20086/19/20086/19/2008PDONE
DetailsTroy Cobbley
The fire proofing of the mechanical supports is complete. The ceiling is these two rooms can be installed covering the sprinkler piping. Insulation has been installed in the eaves as well.
BLD-Energy code compliance6/3/20086/3/20086/3/2008PPASS
DetailsJim Sly
Mike; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
Last of insulation.......OK
BLD-Other5/22/20085/23/20085/23/2008APASS
DetailsTom Arcoraci
BLD-Energy code compliance5/21/20085/22/20085/22/2008APASS
DetailsTom Arcoraci
mike Phone #: ###-####
BLD-Energy code compliance5/16/20085/19/20085/19/2008APART
DetailsMike Jordan
mike Phone #: ###-####. West portion of bldg. ok for cover. Also reveiwed RFI from engineer and reinspected structural issues prevoisly circled on plans.
BLD-Energy code compliance5/14/20085/15/20085/15/2008APART
DetailsJim Sly
mike - partial insulation Phone #: ###-#### East 1/3rd of Bldg OK to cover.
BLD-Framing/Rough-in5/2/20085/6/20085/6/2008APART
DetailsTom Arcoraci
mike Phone #: ###-#### see plans for eng items that need to be addressed(circled)
BLD-Framing/Rough-in3/12/20083/12/20083/12/2008PPASS
DetailsTom Arcoraci
Mike; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Framing/Rough-in3/10/20083/11/20083/11/2008APASS
DetailsTom Arcoraci
mike Phone #: ###-####
BLD-Aging Inspection2/26/20082/26/20082/26/2008 PASS
DetailsTom Arcoraci
wip
BLD-Footing12/26/200712/27/200712/27/2007APASS
DetailsTom Arcoraci
mike - pouring at 1:00 Phone #: ###-####
BLD-Footing12/14/200712/17/200712/17/2007APASS
DetailsTom Arcoraci
Mike, late morning please; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Aging Inspection11/19/200711/19/200711/19/2007 CANC
DetailsTom Arcoraci
(F) Reprint permit  8/22/2007  
Issue PAID IN FULL permit  8/20/2007 DONE
Ready Permit EXTENDED  3/1/2007 DONE
Extend permit application 180 days until August 20, 2007. Original expiration date: February 21, 2007.
Telephone call  2/12/2007 DONE
was going to leave a mess for an andrew david at ###-#### that permit is ready-he is out for the week. a pat will call me back & also stated we needed achd before pickup
Telephone call  12/7/2006 DONE
tlk to andrew david ###-#### that permit and fees are ready to be picked up but needs ACHD,GC, and RP
Telephone call  11/17/2006 DONE
tlk to andrew david ###-#### that permit and fees are ready to be picked up but needs ACHD,GC, and RP
Permit Ready to Issue  11/17/2006 DONE
Print Occupancy Form  11/16/2006 DONE
Routing - PLUMBING11/3/2006 11/15/2006 PASS
no services to the fountain.
Routing - PLAN CHECK11/15/2006 11/15/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/15/2006 DONE
Plan assigned to (JCM)8/29/2006 11/15/2006 PASS
11/15/2006 16:26:06 JCM - activity updated through activity BLDA022 from case BLD06-02489.
Routing - PLANNING11/3/2006 11/3/2006 PASS
Approved per DRH06-00146 and CUP06-00034
Routing - FIRE10/31/2006 11/2/2006 PASS
Attached updated review comments to plans.
Routing - PLANNING10/30/2006 10/31/2006 FAIL
Waiting for revised site plan for Design Review folder.
Plan Reviewer's activity  10/30/2006 PASS
Plans reviewed and approved for structural and nonstructural items with redlined notes. JCM
Routing - PLAN CHECK10/3/2006 10/30/2006 PASS
Plan resubmittals received  10/27/2006 DONE
Received 1 transmittal,2 memos, 3 response, 4 copys of sheets A1.1,A2.1, and 2 copys of sheets G1.1,SD-1,C1.0,C2.0,C3.0,C4.0,L1.0,L2.0,A7.1,A8.1,A8.2, E2.05,E3.0,S2.1,S7.1,S7.2,S2.1,M1.0,M2.0,M3.0,M3.1,M3.2,M4.0,M5.0 taken to John M.
Routing - PLANNING10/2/2006 10/3/2006 PASS
Approved per CUP06-00034 and DRH06-00146.
1st review completed  10/2/2006 FAIL
Routing - FIRE9/27/2006 10/2/2006 FAIL
Faxed resubmittal items to architect.
Routing - PLAN CHECK9/22/2006 9/27/2006 FAIL
Plan resubmittals requested  9/27/2006 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Plan resubmittals received  9/27/2006  
Received cover transmittal, 1 copy of the following sheets--A4.1, SD-1, L1.0, L2.0 and taken to John Menard
Plan resubmittals requested  9/25/2006 DONE
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL8/30/2006 9/22/2006 FAIL
Called Action Couriers for pick up - Received comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL9/15/2006 9/22/2006 FAIL
Called Action Couriers for pick up - Received comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLANNING9/21/2006 9/22/2006 FAIL
Revised drawings must be submitted to Design Review staff showing compliance with the conditions of approval.
Routing - PLUMBING9/13/2006 9/21/2006 FAIL
grade main waste line to the sewer stub. P-17 requires a 3" waste per fixture schedule. 2" waste line to X-ray- prep-lounge area is undersized. water service location is not per civil plans, civil shows 1 1/2"service line. will it be 1 1/2" or 2"? 120 deg. max hot water to all lavs, hand sinks, exam sinks and sinilar fixtures. show waste piping to fountain, water piping to fountain- backwater valve, vented traps, etc. water to the interior hose bibs/reels, P-20,P-10, P-6 will need R.P. backflow preventers, hot and cold. I would suggest a non-potable system to address this issue.
Routing - Erosion and Sediment9/8/2006 9/13/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS9/5/2006 9/8/2006 PASS
Routing - PLANNING Land Div8/29/2006 9/5/2006 PASS
Plans ACCEPTED BY PLAN TECH  8/29/2006  
Plan routing begun/NEW & ADDTN  8/29/2006  
Application received  8/25/2006