BLD-Final | 8/10/2011 | 8/11/2011 | 8/11/2011 | A | PASS |
Jim Sly
|
|
|
brandon please call 30 min before going out so he can get the doors unlocked. Phone #: ###-#### C/C issued
|
DOC - Permit Finaled | 8/11/2011 | 8/11/2011 | 8/11/2011 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 8/11/2011 | 8/11/2011 | 8/11/2011 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 8/8/2011 | 8/8/2011 | 8/8/2011 | P | CANC |
Jim Sly
|
|
|
Brandon phone
|
BLD-Final | 8/5/2011 | 8/8/2011 | 8/8/2011 | A | CANC |
Jim Sly
|
|
|
BRANDON Phone #: ###-#### PLEASE CALL 30 MIN BEFORE GOING OUT
|
Zoning Approval | 7/29/2011 | 7/29/2011 | 7/29/2011 | | DONE |
Susan Riggs
|
|
|
All landscaping is in and looks great.
|
Override - People Holds | | | 7/29/2011 | | |
|
|
|
|
BLD-Conference | 7/26/2011 | 7/26/2011 | 7/27/2011 | P | DONE |
Jim Sly
|
|
|
Owner arranged for bldg finals....and will call them in.
|
CHANGE STATUS TO (ISS) | | | 7/27/2011 | | DONE |
|
|
|
Expiration date is 9/26/2011
|
Change Expiration Date Only | | | 7/27/2011 | | DONE |
Barbara Stitt
|
|
|
Per Bob Archibald
|
BLD-Conference | 7/25/2011 | 7/25/2011 | 7/26/2011 | P | CANC |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 4/15/2011 | 4/15/2011 | 4/22/2011 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 4/22/2011 | 4/22/2011 | 4/22/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
Reopen Permit (ISS) | | | 2/25/2011 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 2/25/2011 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 2/24/2011 | | DONE |
Joan Johnson
|
|
|
New bldg project manager came in to see Susan Riggs and Robert Archibald re: BLD06-02492 that is expired. The only inspections lacking when the permit was valid was Final zoning, Final Bldg. Brandon is attempting to re-activate the permit, or final inspections to move this project forward. Messages left for Bob A & Susan R.
|
Telephone call | | | 2/24/2011 | | PASS |
Bob Archibald
|
|
|
Spoke with Brandon @ ###-#### and informed him that a two addmin. fee would be required to reactivate permit and once reactivated to schedule Jim Sly and Susan Riggs for the final inspections.
|
Case Summary (BLD) | | | 2/17/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 2/9/2007 | 2/9/2007 | 2/9/2007 | P | NR |
Dave Hannah
|
|
|
craig; Phone #: ###-#### Internet Inspection Request from: Victoria Beall needs zoning final first
|
FIRE-Final Inspection | 2/8/2007 | 2/9/2007 | 2/9/2007 | A | CANC |
Troy Cobbley
|
|
|
Wrong inspection type called in.
|
BLD-Energy code compliance | 11/8/2006 | 11/9/2006 | 11/9/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/8/2006 at 1:31:13 PM. Contact: ###-####.
|
BLD-Energy code compliance | 11/6/2006 | 11/7/2006 | 11/7/2006 | A | PASS |
Jim Sly
|
|
|
craig - note: re-inspect ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 11/6/2006 | 11/7/2006 | 11/7/2006 | A | PASS |
Jim Sly
|
|
|
craig - note: re-inspect ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 11/2/2006 | 11/2/2006 | 11/2/2006 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/2/2006 at 8:29:34 AM. Contact: ###-####. C/N posted......Contractor is Building to Townhouse Standards w/ (2) 1hr walls and no communicating utilities.......appears OK
|
BLD-Footing | 9/20/2006 | 9/21/2006 | 9/21/2006 | P | PART |
Jim Sly
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Appears OK but no property lines strung because of obstacles.
|
Issue PAID IN FULL permit | | | 9/19/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/14/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/14/2006 | | DONE |
|
|
|
spoke to craig@###-####/told permit was ready, address, and fees
|
Plan assigned to (SRZ) | 9/8/2006 | 9/8/2006 | 9/13/2006 | | PASS |
|
|
|
9/13/2006 14:26:33 SRZ - activity updated through activity BLDA022 from case BLD06-02492.
|
Routing - PLAN CHECK | 9/5/2006 | | 9/13/2006 | | PASS |
|
|
|
Sam Z.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/13/2006 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 8/28/2006 | 8/28/2006 | 9/8/2006 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/8/2006 | | PASS |
|
|
|
Plan review completed. Pending Planning release. (SRZ)
|
Case Summary (BLD) | | | 9/7/2006 | | |
|
|
|
|
Routing - PLANNING | 8/28/2006 | | 9/5/2006 | | PASS |
|
|
|
wait for the appeal date to pass which is 9-11
|
Routing - PUBLIC WORKS | 8/29/2006 | | 8/30/2006 | | PASS |
|
|
|
|
Application received | | | 8/28/2006 | | |
|
|
|
|