Permit Information
Permit NumberBLD06-02505
StatusFinaled
Name TMC INC
Site Address 1849 N WILDWOOD AVE
Project NameSTEELWOOD FLEX CONDOS
Customer Number 
ePlanReviewNo
Description
(NO TENANT - STEELWOOD FLEX CONDOS - BUILDING #1 - FORMER ICE SKATING ARENA) This building is fire sprinklered for building area increase, story increase, and for fire area reasons. To create a 1,334 square foot tenant space within an existing 29,054 square foot building. Work is to include interior walls, a restroom accessible to the disabled, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/23/20084/23/20085/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice4/11/20084/11/20084/23/2008 DONE
DetailsJim Sly
BLD-Final4/10/20084/11/20084/11/2008PPASS
DetailsJim Sly
ron Phone #: ###-####
C/C issued
DOC - Permit Finaled4/11/20084/11/20084/11/2008PPASS
DetailsJim Sly
FIRE-Final Inspection4/10/20084/11/20084/11/2008APASS
DetailsTroy Cobbley
fire life safety passed.
FIRE-Final Inspection4/7/20084/7/20084/7/2008PFAIL
DetailsTroy Cobbley
Sprinkler coverage is required in the restroom. This work will require permits. The exit sign/emergency light did not operate when tested.
Case Summary (BLD)  4/1/2008 DONE
BLD-Framing/Rough-in3/26/20083/27/20083/27/2008APASS
DetailsJim Sly
ron Phone #: ###-####
Frame and energy OK
BLD-Conference3/19/20083/20/20083/20/2008PDONE
DetailsJim Sly
OK to for Permit to stay as issued status per Jennifer G.
BLD - Request for Extension7/23/20077/24/20077/24/2007 PASS
DetailsTom Arcoraci
Ron ###-####
BLD-Aging Inspection1/29/20071/29/20071/30/2007 DONE
DetailsJim Sly
Left note for Alan at his office.
Issue PAID IN FULL permit  10/30/2006 DONE
Inspection Record Card- Bld  10/27/2006 DONE
Inspection Record Card- Bld  10/27/2006 DONE
Telephone call  10/27/2006 DONE
lft vm with ron sargent ###-#### that permit and fees are ready to be picked up but needs RCE/GC
Permit Ready to Issue  10/27/2006 DONE
Routing - PUBLIC WORKS10/26/2006 10/26/2006 PASS
Re-evaluate fees
Routing - PLAN CHECK10/26/2006 10/26/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/26/2006 DONE
Plan assigned to (CJW)9/14/2006 10/26/2006 PASS
10/26/2006 12:49:47 CJW - activity updated through activity BLDA022 from case BLD06-02505.
Routing - PLAN CHECK10/2/2006 10/26/2006 PASS
Approved after resubmittal review.
Plan resubmittals received  10/23/2006  
Received 1pg. response letter from TRW Architects, 2 copies of the following pages: A2.2, A3.1, A6.1, P1.0, P1.1, P2.1; taken to Carl Westfall
Routing - FIRE9/28/2006 10/2/2006 PASS
Attached review comments to plans.
1st review completed  10/2/2006 FAIL
Failed Plan Check.
Routing - PLAN CHECK9/15/2006 9/28/2006 FAIL
The IBC plan review was started on September 27, 2006 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS9/14/2006 9/15/2006 PASS
Plans ACCEPTED BY PLAN TECH  8/30/2006  
Recd Pcfee & Taken To Pln CK  8/29/2006  
Application received  8/28/2006